Skip Headers
Oracle® Application Integration Architecture Pre-Built Integrations: Functional Interoperability Configuration Guide
Release 11.2

Part Number E27102-05
Go to Documentation Home
Home
Go to Book List
Book List
Go to Table of Contents
Contents
Go to Feedback page
Contact Us

Go to previous page
Previous
Go to next page
Next
PDF · Mobi · ePub

2 Design to Release: Agile - EBS with Order to Cash

This chapter discusses the interoperable pair of pre-built integrations: Agile Product Lifecycle Management Integration Pack for Oracle E-Business Suite: Design to Release (Design to Release: Agile - EBS) and Siebel CRM Integration Pack for Oracle Order Management: Order to Cash (Order to Cash: Siebel CRM - EBS). This chapter includes the routing rules that must be changed to enable interoperability.

This chapter includes the following sections:

The Design to Release: Agile - EBS integration supports the exchange of product information between Agile PLM and Oracle EBS. In the Order to Cash: Siebel CRM - EBS integration, product information is exchanged between Siebel Customer Relationship Management (Siebel CRM) and Oracle E-Business Suite (Oracle EBS). It is a one way feed from Oracle EBS to Siebel CRM.

For more information, see the Oracle Application Integration Architecture Design to Release: Agile - EBS Implementation Guide and the Oracle Application Integration Architecture Siebel CRM Integration Pack for Oracle Order Management: Order to Cash.

2.1 Product Sync Flows in Design to Release

The Design to Release: Agile - EBS integration enables and integrates the product development process between Design to Release: Agile - EBS and Oracle EBS. This integration supports different scenarios.

Change Order Release: during the product design phase, new products or parts are introduced or existing parts may go through design changes. When the authoring of a part's attributes and design information is complete and is ready for publishing to the manufacturing system, it is released by Change Orders. The Change Order Release Process consists of the New Part and Product Release (PREL) and the Product Design Modification flows of Design to Release: Agile - EBS. The release of a change order in the Design to Release: Agile - EBS integration system acts as a trigger for the synchronization of product design information with the ERP system.

For all items pushed to the ERP system, the system verifies whether the items exist, and whether they have the same revision number as the old item from the Agile system. If the item did not exist in ERP and is being released for the first time from PLM, it is created in ERP. If the item exists in ERP and the two systems were coordinated concerning item revision, the existing item is updated with new attribute data from Agile.

2.2 Product Sync Flows in Order to Cash

These are the product sync related flows:

The details of the latest active version of the BOM and associated non-orderable components are synchronized from Oracle EBS to Siebel CRM as result of this request.

2.3 Best Practices for Flows

The following are the best practices for product (Item) and BOM synchronization among the various participating applications when the Design to Release: Agile - EBS integration and the Order to Cash: Siebel CRM - EBS support interoperability:

2.4 Routing Rules Configuration

Routing rules changes are required to enable the interoperability of the Design to Release: Agile - EBS integration with the Order to Cash: Siebel CRM - EBS integration. The affected service-oriented architecture (SOA) composite service is the ItemEBSV2. The changes are delivered through patch 12314525. This patch should be applied to the Oracle AIA and Fusion Middleware (FMW) environment to re-deploy the ItemEBSV2 composite service with the new routing rules.

2.5 Post-Deployment Steps

Perform these steps after both integrations have been installed and deployed:

  1. Log in to the Oracle AIA Console.

  2. Navigate to Setup, Systems.

  3. Verify that the value in the System Type column for the E-Business Suite system is set to EBIZ (all upper-case). If it is not set to EBIZ, change the value to EBIZ and save.

  4. Navigate to the AIA Configuration tab, and click Reload.