Previous Topic

Next Topic

Book Contents

Book Index

Validating a study and creating a baseline

  1. Do one of the following:

    A study validation job starts.

    Note: If the job scheduling service is not running on the server, the job is placed in a queue.

  2. In the message box that indicates a validation job has started, click OK.

    A slide-up message appears to indicate when the job starts and finishes.

  3. After the job finishes, check the status in the Baselines Browser, located by default at the bottom of the Central Designer window.
Copyright © 2013 Oracle and/or its affiliates. All rights reserved.