Use the Edit Schedule dialog box to specify the interval before the next study event in a study workflow. This dialog box appears when you:
Edit Schedule dialog box—Option descriptions
Option | Description |
---|---|
Target event interval | Amount of time to elapse between the connected study object and study event. This amount is specified as the number of weeks, days, and hours. |
After event | Indicates the study event that the current study event follows. |
Clear Schedule | Resets the target event interval to zero. |
Copyright © 2013 Oracle and/or its affiliates. All rights reserved. |
---|