Skip Headers
Oracle® Communications Design Studio Modeling OSM Processes
Release 7.2.4
Go to Design Studio Help Home
Go to Table of Contents
Go to Feedback page

Go to previous page
Go to next page
Mobi · ePub

Order Lifecycle Policy Editor Grace Periods Tab

Use the Order Lifecycle Policy Editor Grace Periods tab to specify a period of time that the system should wait before suspending, amending, or canceling an order.

A grace period specifies a period of time to wait for all accepted tasks to complete before transitioning an order. You can specify a grace period for the Suspend Order, Process Amendment, and Cancel Order transactions. Grace periods are defined by a wait duration and an event frequency.

Field Use
Wait Duration Select Indefinitely (the default setting) or specify a time frame using the minimum and maximum times that the system waits before forcing the transition.
Event Frequency Specify the frequency at which the system should generate a jeopardy notification (defined as every hour, by default) while the wait duration remains unsatisfied.

Related Topics

Configuring Order Lifecycle Policies

Working with Order Lifecycle Policies

Working with Orders