Oracle® Virtual Compute Appliance

Expansion Node Setup HTML Guide for Release 1.0

Oracle Legal Notices

E40649-01

December 2013


Table of Contents

Preface
1 About the Oracle Virtual Compute Appliance Expansion Node Setup Poster
2 Server Cabling Requirements
3 Unpacking and Preparation
3.1 Verify Installation Requirements
3.2 Unpack the Expansion Node Upgrade Kit
3.3 Prepare the Oracle Virtual Compute Appliance Rack
4 Install the Expansion Compute Node
4.1 Install the Mounting Brackets on the Server
4.2 Attach the Slide Rail Assemblies to the Rack
4.3 Install the Server in the Rack
5 Connect the Pre-Installed Cables to the Server
5.1 Install the Cable Management Arm (CMA)
5.2 Cable the Server
6 Finish the Installation
6.1 Push the Server Back into the Rack
6.2 Replace the Doors on the Rack
6.3 Automatic Provisioning
7 What's Next?