Go to main content
2/28
List of Figures
2-1 Low-Voltage Single Phase Power Connector
2-2 Low-Voltage Three-Phase Power Connector
2-3 High-Voltage Single Phase Power Connector
2-4 High-Voltage Three-Phase Power Connector
2-5 Typical Data Center Configuration for Perforated Floor Tiles
3-1 Network Diagram for Recovery Appliance
3-2 Network Connections to the Recovery Appliance Rack Components
3-3 Recovery Appliance Connection to an Oracle Tape System
3-4 Recovery Appliance Connection to a Third-Party Tape System
4-1 Auto Service Request Network Connections
5-1 Oracle Exadata Deployment Assistant Welcome Page
6-1 Recovery Appliance Shipping Crate
6-2 Carefully Push the Recovery Appliance Rack from Behind
6-3 Stabilizing the Recovery Appliance Rack Using Leveling Feet
6-4 Location of Mounting Brackets on Rack
6-5 Bottom View of the Recovery Appliance Rack
6-6 Base Position to Measure
6-7 Securing the Recovery Appliance Rack Using Mounting Brackets
6-8 Earth Ground Attachment Bolt Location
6-9 Power Cord Routing Example
6-10 PDU Switch Locations
7-1 Server Expansion Kit Components
7-2 Removing the Rack Doors
7-3 Removing the Filler Panels
7-4 Location of the Trough
7-5 Aligning the Side-Rail Assembly With the Rack
7-6 Inserting the Server with Mounting Brackets into the Slide Rails
9-1 Recovery Appliance Connected to an Exadata Quarter Rack
9-2 Recovery Appliance Connected to an Exadata Half or Full Rack
9-3 Recovery Appliance Connected to Multiple Exadata Racks
B-1 Front View of Oracle Server X6-2 or X5-2
B-2 Rear View of Oracle Server X6-2 or X5-2
B-3 Front View of Sun Server X4-2
B-4 Rear View of Sun Server X4-2
B-5 Front View of Oracle Server X6-2L or X5-2L
B-6 Rear View of Oracle Server X6-2L or X5-2L
B-7 Front View of Sun Server X4-2L
B-8 Rear View of Sun Server X4-2L
C-1 Rack Layout of the Recovery Appliance X6 or X5 Full Rack
C-2 Rack Layout of the Recovery Appliance X6 or X5 Minimum Configuration
D-1 Rack Layout of the Recovery Appliance X4 Full Rack
D-2 Rack Layout of the Recovery Appliance X4 Minimum Configuration
E-1 In-Rack Connections Between Spine Switch and Leaf Switches
E-2 In-Rack Connections Between the Servers and the Leaf Switches
E-3 Connecting Switches Across Two Racks
E-4 Connecting Switches Across Eight Racks
E-5 Connecting Switches Across 18 Racks
Scripting on this page enhances content navigation, but does not change the content in any way.