Power Off the Pilot

Note: Do not power off the Pilot host without ensuring that SSH is enabled on the Oracle FS System. Otherwise, the replacement procedure might fail.
  1. Notify affected users that the Pilot will be powered off.
  2. Ensure that the host of the Pilot on which the replacement procedure must be performed is powered off.