Planning for System Installation

Following items are a part of the planning and site preparation before the installation of a racked Oracle FS System:

Note: To ensure that all planning requirements have been met and the site is ready for an Oracle FS System racked installation, follow the site preparation checklist.
Tip: When moving a heavy racked systems to the installation site, use steel tracks to guide the system on to the floor. We recommend that a minimum of three people are used to move the rack, with one person pushing from the front and one person pulling at the back to help guide the rack. When transporting configured racks from one location to the other, move them at a speed of 2.13 feet for each second (0.65 meters for each second) or slower. Carefully examine the transportation path and avoid obstacles, such as doorways or elevator thresholds that can cause abrupt stops or shocks. Use ramps or lifts to avoid obstacles and to enable a smooth transport.