You can have separate load plans for each source, but load plans should not run in parallel
You can only execute a load plan if it was successfully generated. See Generating Load Plans for instructions.
In the Tasks pane of Oracle BI Applications Configuration Manager, select Manage Load Plans, which appears under the Load Plans Administration heading.
The Manage Load Plans page is displayed.
In the Load Plans list, select the load plan you want to execute.
In the Load Plans toolbar, click the Execute icon.
The Execute Load Plan dialog is displayed.
Specify the following information:
Field
Description
Context
The ODI context to be used when the load plan is run. Note that Global is the only supported context.
Logical Agent
The ODI logical agent to be used when the load plan is run.
Oracle Data Integrator Work Repository
The name of the ODI Work repository.
Click OK.
The following icons show the possible execution statuses that appear in the Execution Status column in the Load Plan master list. Click the Refresh icon to refresh the display.