What's Revised and Added in this Library
What's New in P6 Professional
Cumulative Feature Overview Tool
Installation and Upgrading
Administration
User Content
User's Guide
Welcome
Understanding Project Management
Why Use P6 Professional?
Your Role in the Organization
P6 Professional Process Overview
Planning, Controlling, and Managing Projects
Getting Started
Workspace Basics
Symbols
Using main windows
Using Hint Help
Using the Status Bar and Layout Options bar
Display window details
Tile windows horizontally or vertically
Wizards
Navigate wizards
Select and assign information
Global data vs. project-specific data
Use shortcut menus
Select multiple items
Quickly enter the same text in multiple table rows
Using the HTML editor
Using Hot Keys
Using Shortcut Keys
Setting User Preferences
Define user preferences
Define how to display time information
Specify a format for dates
Select a view currency
Specify a format for currency
Enter e-mail settings
Set wizard options
Change my password
Set startup options
Create a log of tasks
Define the range of financial periods to display in columns
Set resource analysis options
Select Startup Filters
Load resource summary data at startup
Select calculation options for resource and role assignments
Set the Online Help location (P6 Professional Only)
Structuring Projects
Setting up and starting to work with the EPS
Enterprise Project Structure overview
Defining the Enterprise Project Structure
Set up the EPS structure
Add a project to the EPS hierarchy
Show or hide details in the EPS hierarchy
Use status for filtering projects in the EPS
Delete an EPS node or project
Copy an EPS node or project
Working with and defining the OBS
Organizational breakdown structure (OBS) overview
Setting up the OBS
View the OBS
Add an OBS element
Assign an OBS element to a WBS element
Edit an OBS element
Delete an OBS element
View the OBS chart display
Change the OBS chart display
Defining Resources and Roles
Resources
Resources
Add a resource
Adding resources using a wizard
View resources
Define resource shifts
Display resource details
Calculating cost when using multiple resource rates
Having a discussion with team members
Roles
Defining Resource Curves
Defining the WBS
Work Breakdown Structure
Using a WBS for top-down planning
Using weighted milestones in the work breakdown structure
WBS status types
View the WBS
Display work breakdown structure details
Add a WBS element
Edit a work breakdown structure element
Assign WBS weighted milestones
Assign WBS Category values (P6 Professional Only)
Create WBS category values (P6 Professional Only)
Change the work breakdown structure chart display
Change the work breakdown structure table display
Copy and paste a work breakdown structure element
Define earned value settings for a specific work breakdown structure element
Delete a work breakdown structure element
Defining Project, Resource, and Activity Codes
Project Codes
Project codes and values
Create project codes
Create project code values
Assign project codes and values
Resource Codes
Activity Codes
Activity codes and values
Defining Global Activity Codes and Values and Values Colors
Defining Project Activity Codes and Values and Values Colors
Create project-level activity codes
Create project-level activity code values
Promote project-level activity codes and values
Defining EPS-level Activity Codes and Values and Values Colors
Defining Custom Fields
User-defined fields
Define custom user fields
Choosing data types for user-defined fields
Indicator user-defined fields
Defining Calendars
Calendars
Defining default hours per time period in calendars
Project Calendars
Create a project calendar
Edit a project calendar
Delete a project calendar
View project calendar assignments
Global Calendars
Create a global calendar
Edit a global calendar
Delete a global calendar
Specify a default global calendar
View global calendar assignments
Resource Calendars
Working with the EPS
Managing projects using the EPS
Defining project details
Enter project dates
Specify a fiscal start month
Set project resource options
Change a project name
Change a project ID
Change the project leveling priority
Change a project's status
Developing Projects
Adding Activities to a Project
Activities
Activity types
Activity dates
Synchronizing activity duration, units, and resource units/time
Define general activity information
Add activities in the Activity Table
Add activities in the Activity Network
Define activity types
Define activity duration types
Define activity percent complete types
Assign a calendar to an activity
Enter activity durations
Enter activity start and finish dates
Enter a physical percent complete for activities
Enter unit information for resource assignments
Enter cost information for resource assignments
Dissolve an activity
Define milestones
View activity float values
View activity summaries
Copy and paste activities in the Activity Table
Copy and paste activities in the Activity Network
Renumber activity IDs in the Activity Table
Linking Activities with Relationships
Relationships
Adding relationships between activities
Add predecessor relationships
Add successor relationships
Create relationships in the Gantt Chart
Create relationships in the Activity Network
Viewing activity relationships
Assigning Resources and Roles to Activities
Assign resources to activities
Assign resources to activities by role
Assign a rate type to a resource assignment
Choose the rate source for an assignment
Change the resource's role assignments for an activity
Recalculate resource and role assignment costs
Assign roles to activities
Assigning Resource Curves
Budgeting
Defining Budgeting
Establishing budgets
Tracking and analyzing budgets
Establish budgets
Enter budget changes
Define funding sources
Assign funding sources
Enter monthly spending amounts
View budget and spending plan totals
Compare budgets and variances
Manually Planning Future Period Assignments
Future period bucket planning
Create a future period bucket planning layout
Manually enter future period assignment values
Adding Expenses and Entering Cost Information for Activities
Expenses
Expenses
Add expenses
Add expenses from the Activities window
Assign an expense category
Assign expense categories from the Activities window
Specify an accrual type for an expense
Enter cost information for expenses
Change an expense's activity assignment
Cost Accounts
Performing Top-down Estimation (P6 Professional Only)
Performing top-down estimations using prior experience (P6 Professional Only)
Performing top-down estimations using function points (P6 Professional Only)
Applying Saved Top-Down Estimations To a Project (P6 Professional Only)
Adding Activity Steps
Activity steps
Add steps to activities
Update activity steps
Add weights to steps
Creating and Assigning Activity Step Templates
Assigning Notebooks to Activities
Global Change
Managing Projects
Creating Baselines
Baselines
Create a baseline
Assign baselines to projects
Assign the baseline to use for summarization or earned value
Assign the baselines to use for the current project
Assign baselines for comparison
Comparing Current and Baseline Schedules
Copy a baseline
Update a baseline
Modify a baseline manually
Delete a baseline
Comparing Projects and Baselines
Updating Projects
The Update Process
Updating the schedule
Update progress for all activities
Update progress for individual activities
Progress Spotlight
Update progress for spotlighted activities
Estimate progress automatically
Highlight activities for updating
Update progress for the project
Remove progress from an activity
Suspend or resume an activity's progress
Apply actuals
Earned Value
Calculating earned value using resource curves or manual future period buckets
Updating progress
Store Period Performance
Store Period Performance
Link actual to date and actual this period units and costs
Post actual amounts for a period
Edit past period actual data
View past period actual data in spreadsheets
Creating and Using Reflections
What is a reflection
Creating and using reflections
Create a Reflection
Merging a Reflection with the Source project
Working with remote projects
Managing remote projects
Check out a project
View the check-out status of a project
Modify check in update options
Check in a project
Scheduling Projects
Scheduling projects
Calculate multiple float paths
Schedule a project
Schedule a project automatically
Schedule project data as a service (P6 Professional Only)
Leveling Resources
Leveling resources
Leveling priority definitions
Specify leveling priorities
Level resources
Level resources automatically
Adding and Assigning Issues
Issues
Add an issue
Assign responsibility for an issue
Assign a tracking layout to an issue
Send e-mail about an issue
View or add to an issue's history
Use the issue navigator
Adding and Assigning Thresholds
Thresholds
Threshold parameter definitions
Add a threshold
Assign responsibility for threshold-generated issues
Assign a tracking layout to a threshold
Monitor a threshold
View threshold issue details
Adding and Assigning Risks (P6 Professional Only)
Risks (P6 Professional Only)
Creating Risks (P6 Professional Only)
Assigning a risk to an activity (P6 Professional Only)
Responding to a risk (P6 Professional Only)
Create risk categories (P6 Professional Only)
Delete risk categories (P6 Professional Only)
Adding and Assigning Work Products and Documents
Work Products and Documents
View a project's document library
Add a work product or document record
Assign a document status or category
Specify work product and document location references
Identify a document as a work product
Display work product and document details in the WPs and Docs window
Display work product and document details in the Activities window
Display work product and document details in the Work Breakdown Structure window
Assign work products and documents from the WPs and Docs window
Assign work products and documents to an activity from the Activities window
Delete work product or document records
Customizing Activity Layouts
Overview
Open a layout
Create a new activity layout
Save a layout as a project layout
Exporting and Importing Layouts
Copying Data to External Applications
Activity Table
The Activity Table
Define Activity Table columns
Customize activity column titles
Change activity information in the Activity Table
Sort activity information in the Activity Table
Change group row fonts and colors
Change Activity Table font, color, and row height
Gantt Chart
The Gantt Chart
Display the Gantt Chart
Change a layout's timescale format
Move around a Gantt Chart
Add a bar to the Gantt Chart
Change a bar in the Gantt Chart
Apply Gantt Chart settings from another layout
Position a bar in the Gantt Chart
Change the background lines in the Gantt Chart
Show or hide the Gantt Chart legend
Show or hide relationship lines in the Gantt Chart
Customize the data date line
Change a Gantt Chart bar's filter - under Gantt Chart
Change a Gantt Chart bar's label - under Gantt Chart
Change a Gantt Chart bar's settings
Customize collapsed bars in the Gantt Chart
Change a Gantt Chart bar's style - under Gantt Chart
Change a Gantt Chart bar's timescale - under Gantt Chart
Change an activity's start and finish dates in the Gantt Chart
Delete a bar from the Gantt Chart
Change an activity's duration in the Gantt Chart
Add a curtain attachment in a Gantt Chart
Hide a curtain attachment in a Gantt Chart
Add a text attachment to a Gantt Chart
Remove a text attachment from a Gantt Chart
Attach notebook items to bars in a Gantt Chart
Hide all curtain attachments in the Gantt Chart
Delete a curtain attachment from a Gantt Chart
Apply a Progress Line to the Gantt Chart
Activity Network
Activity Network
Display the Activity Network
Apply Activity Network settings from another layout
Customize the Activity Network layout
Customize the activity box layout
Select the activity box layout
Save and Open an Activity Network Layout
Create a future period bucket planning layout
Trace Logic
Activity Usage and Resource Usage Profiles
Activity Usage Profile
The Activity Usage Profile
Display the Activity Usage Profile
Define the Activity Usage Profile
Show or hide the profile legend in the histogram
Resource Usage Profile
Activity Usage and Resource Usage Spreadsheets
Tracking Projects
Overview
Tracking
Tracking layouts
Customizing Tracking Layouts
Customize a Project Table
Customize a Project Bar Chart
Customize a Project Gantt/Profile
Customize a Resource Analysis layout
Grouping, Sorting, and Filtering Tracking Layouts
Create a tracking layout
Open a tracking layout
Types of tracking layouts
Share a layout with other users
Save a tracking layout
Export a tracking layout
Import a tracking layout
Delete a tracking layout
Filter a tracking layout
Group and sort a tracking layout using standard settings
Group and sort a tracking layout using custom settings
Project Table
Project Bar Chart
Project Gantt/Profile and Resource Analysis
Customize a Project Gantt/Profile
Group and sort resources in the Resource Explorer window
Filter resources in the Resource Explorer window
Working with the Gantt Chart
Change a Gantt Chart bar's timescale
Change a Gantt Chart bar's label
Change a Gantt Chart bar's style
Change a Gantt Chart's background lines
Customize the data date line
Working with the Profile and Spreadsheet
Grouping, Filtering, and Summarizing Data
Grouping and Sorting
Grouping activities by field
Grouping by hierarchy
Grouping activities by WBS path
Sorting
Group activities by field
Group activities by hierarchy
Group activities by WBS path
Sort activities
Format grouping bands
Set Page Breaks by Group Band
Show or hide empty title bands
Show field titles in grouping bands
Group and sort resource assignments
Set as a user preference
Auto-Reorganization
Filtering
Filtering data
Default filter criteria
Create a filter
Apply a filter
Combine filters
Change a Gantt Chart bar's filter
Create a lookahead filter
Filter by project status
Remove filters
Delete filters
Summarizing
Producing Reports and Graphics
Report Basics
Reporting features
Report Wizard
Create a new report with the Report Wizard
Modify a report with the Report Wizard
Report Editor
Preview a report
Print a report
Copy a report
Import a report
Export a report
Delete a report
Working with Report Groups
Working with Report Batches
Create a report batch
Add a report to a report batch
Print a report batch
Run a report batch from the command line
Run a batch report as a service
Using the Report Editor to Modify Reports
Report Editor window
Basic Procedures
Copy and paste cells
Cut and paste cells
Add a report title
Define default text styles for reports
Define a report header and footer
Define page setup options for a report
Change report margins
Add a background image to a report
Remove a background image from a report
Add comments to reports
Add comments when running a report
Indicate hierarchy levels in reports
Specify a timeperiod for a report
Advanced Procedures
Working with Data Sources
Data sources in reports
Add a data source to a report
Add an embedded data source to a report
Copy a data source
Cut and paste a data source
Define layout options for a data source
Sort report records
Change the sort order of report records
Filter a data source
Delete a data source filter
Delete a data source from a report
Delete a data source that contains embedded data sources
Working with Rows
Add a row to a report
Copy a row
Cut and paste a row
Filter a report row
Delete a row filter
Delete a row from a report
Working with Text Cells
Text cell types
Add a field data or field title cell to a report
Show time distributions in a report
Add a variable cell to a report
Add a custom text cell to a report
Format text in a text cell
Specify text cell width and alignment in a row
Change text cell color
Add a border to a text cell
Remove borders from a text cell
Add HTML links to a text cell
Disable HTML links in a text cell
Filter a text cell
Delete a text cell filter
Delete a text cell from a report
Working with Line Cells
Add a line cell to a report
Specify line cell width and position in a row
Delete a line cell from a report
Working with Image Cells
Producing Graphics
Print features
Print a layout or window data
Change page setup options
Select a specific printer to print a layout
Publishing Layouts and Reports in HTML Format
Publishing Project Web sites
Project Web Site Publisher
Project Web sites
Publishing activity and tracking layouts
Publish projects as Web sites
Publish activity and tracking layouts on a Project Website
Publish reports on a Project Website
Customize a Project Website
Publish Activity layouts
Publish tracking layouts
Importing and Exporting Data
Linking Contract Management (Expedition) data
Linking Contract Management data
Link P6 Professional to Contract Management
Link your project to a Contract Management project
Import Contract Management data
Import considerations
How data is imported from Contract Management
Viewing Contract Management documents
View Contract Management documents
Import/Export Overview
Importing and exporting projects
Importing and exporting resources and roles
Import/Export file formats
Importing information using a wizard
Exporting information using a wizard
Exchanging data with Primavera Prime (P6 Professional Only)
XER
Export projects to an XER file
Import projects in XER format
Export resources to an XER file
Import resources from an XER file
Export roles to an XER file
Import roles from an XER file
Export projects from the command line
Import projects from the command line
Export projects as a service
Primavera P6 XML
P3
Export a project for use with P3
Considerations when exporting projects to P3
P6 Professional data not converted to P3
Import a P3 project
Considerations when importing P3 projects
P3 data not converted to P6 Professional
Microsoft Excel/XLS
Delete data in the XLS file
Modify Unique Fields in the XLS file
Modifying and importing data from an XLS file
Export project data and resources to an XLS file
Import project information and resources in XLS format
Update Unit, Cost, Duration, and Percent Complete fields in Excel
Export activity data to Excel
Microsoft Project
Export projects to a Microsoft Project file
Import a Microsoft Project file
Export resources to Microsoft Project (supported for MPP or MPX formats)
Import resources from a Microsoft Project file (supported for MPP and MPX formats)
Oracle Primavera Contractor
Export a project for use with Oracle Primavera Contractor
Export resources for use with Oracle Primavera Contractor
Data not exported to Oracle Primavera Contractor
UN/CEFACT IMS (XML)
Linking Primavera Unifier data (P6 Professional Only)
P6 Visualizer
For More Information
Help Systems
Integration and Programming
Integration API Configuration Guide
Integration API Programmer's Reference
Integration API Documentation
Database and Mapping
General Information