Navigation:
Identifies the new name of the job schedule.
Allows you to assign the clone volume to an existing volume group.
Indicates that the scheduled operation performs at the specified time.
Indicates that the operation is not performed as scheduled. Disable the schedule, for example, when the source volume (LUN or Clone LUN) has not been made available to users.
Identifies the name of the logical volume from which the scheduled clone is created.
Identifies the date and time that the schedule begins.
Indicates that the replication runs immediately and only one time.
Identifies how often the system performs the scheduled replication operation.
Interval | Frequency |
---|---|
1 through 7 | Days |
1 through 24 | Hours |
1 through 24 | Months |
1 though 52 | Weeks |
When selecting a weekly schedule, select the days of the week on which the replication occurs.