Install New Drive Enclosures in a Rack

After receiving and unpacking the new Drive Enclosures and accessories, prepare the racks and set up the Drive Enclosures in the racks.

Prerequisite:
You have access to Oracle FS1-2 Flash Storage System Customer Service Guide.
Note: Contact your Oracle Sales Engineer if you need assistance with your order.
  1. (Optional) Upgrade the racks and power distribution units (PDUs).

    For more information about racks and PDUs, refer to Oracle FS1-2 Flash Storage System Customer Service Guide.

  2. Install the rack rails for each new Drive Enclosure.

    For detailed instructions about installing rack rails, refer to Oracle FS1-2 Flash Storage System Customer Service Guide.

  3. Install each new Drive Enclosure into the rack slot identified in your expansion plan.

    For detailed instructions about installing Drive Enclosures into racks, refer to Oracle FS1-2 Flash Storage System Customer Service Guide.

  4. Attach the power cords, and then power on the new Drive Enclosures.
    Note: Do not attach any of the SAS cables at this time.