Validating a study and creating a baseline
- Do one of the following:
- Right-click the study, and select
Validate > Study
.
- In the Project Explorer, select any object in the study and click the
Validate
button in the main toolbar.
A study validation job starts.
Note: If the job scheduling service is not running on the server, the job is placed in a queue.
- In the message box that indicates a validation job has started, click
OK
.
A slide-up message appears to indicate when the job starts and finishes.
- After the job finishes, check the status in the Baselines Browser, located by default at the bottom of the Central Designer window.
Copyright © 2013, 2016 Oracle and/or its affiliates. All rights reserved.