Use the Edit Schedule dialog box to specify the interval before the next study event in a study workflow. This dialog box appears when you:
Edit Schedule dialog box—Option descriptions
Option |
Description |
---|---|
Target event interval |
Amount of time to elapse between the connected study object and study event. This amount is specified as the number of weeks, days, and hours. |
After event |
Indicates the study event that the current study event follows. |
Clear Schedule |
Resets the target event interval to zero. |
Copyright © 2013, 2016 Oracle and/or its affiliates. All rights reserved.