Upgrade considerations
- A baseline that is valid in a previous release is not necessarily valid after an upgrade. For example, if you upgrade from a previous release, the study could contain RefNames that you could create in an earlier release but that you cannot create and are not valid in the current release. A study that contains such RefNames does not pass validation.
- You cannot download deployment packages that are created in Central Designer release 2.1.
- If you are deploying a study to InForm release 6.1.1 or later and the most recent baseline for the study was created in a Central Designer release prior to 2.1.2, you must recreate and deploy the deployment package for the study.
Copyright © 2013, 2016 Oracle and/or its affiliates. All rights reserved.