003015135
003015135: An activity with a triangle Distribution Shape must have a Minimum Duration less than or equal to the Most Likely Duration. The Most Likely Duration must be less than or equal to the Maximum Duration.
Cause: An invalid duration was entered for an activity with a triangle Distribution Shape.
Resolution: Enter a Minimum Duration less than or equal to the Most Likely Duration, and enter a Most Likely Duration less than or equal to the Maximum Duration.