008000002

008000002: Unable to run the risk analysis for the project because it does not contain {0} or fewer activities and {1} or fewer risks.

Cause: An attempt was made to analyze a project with a total number of activities that exceeds the specified activity limit or a total number of Open, Active, and Proposed risks that exceeds the specified risk limit.

Resolution: Do one of the following: <ul><li>Reduce the number of activities to a maximum of 5000.</li><li>Reduce the number of Open, Active, and Proposed risks to a maximum of 300.</li></ul>