22.10

The following updates were made for 22.10.

Added

Fields

Field Name ApiEntity Name Tag Name Comments
  ApiEntityCalcAssignmentSpread Spreads This is a new entity.
actualCapitalCostWorkspace1 ApiEntityProjectCashFlow Project  
actualCapitalCostWorkspace2 ApiEntityProjectCashFlow Project  
actualCapitalCostWorkspace3 ApiEntityProjectCashFlow Project  
actualCostWorkspace1 ApiEntityProjectCashFlow Project  
actualCostWorkspace2 ApiEntityProjectCashFlow Project  
actualCostWorkspace3 ApiEntityProjectCashFlow Project  
actualExpenseCostWorkspace1 ApiEntityProjectCashFlow Project  
actualExpenseCostWorkspace2 ApiEntityProjectCashFlow Project  
actualExpenseCostWorkspace3 ApiEntityProjectCashFlow Project  
actualForecastVarWorkspace1 ApiEntityProjectCashFlow Project  
actualForecastVarWorkspace2 ApiEntityProjectCashFlow Project  
actualForecastVarWorkspace3 ApiEntityProjectCashFlow Project  
atCompletionCostWorkspace1 ApiEntityProjectCashFlow Project  
atCompletionCostWorkspace2 ApiEntityProjectCashFlow Project  
atCompletionCostWorkspace3 ApiEntityProjectCashFlow Project  
benefitsWorkspace1 ApiEntityProjectCashFlow Project  
benefitsWorkspace2 ApiEntityProjectCashFlow Project  
benefitsWorkspace3 ApiEntityProjectCashFlow Project  
currentApprovedBudgetCapitalCostWorkspace1 ApiEntityProjectCashFlow Project  
currentApprovedBudgetCapitalCostWorkspace2 ApiEntityProjectCashFlow Project  
currentApprovedBudgetCapitalCostWorkspace3 ApiEntityProjectCashFlow Project  
currentApprovedBudgetExpenseCostWorkspace1 ApiEntityProjectCashFlow Project  
currentApprovedBudgetExpenseCostWorkspace2 ApiEntityProjectCashFlow Project  
currentApprovedBudgetExpenseCostWorkspace3 ApiEntityProjectCashFlow Project  
forecastCapitalCostWorkspace1 ApiEntityProjectCashFlow Project  
forecastCapitalCostWorkspace2 ApiEntityProjectCashFlow Project  
forecastCapitalCostWorkspace3 ApiEntityProjectCashFlow Project  
forecastCostWorkspace1 ApiEntityProjectCashFlow Project  
forecastCostWorkspace2 ApiEntityProjectCashFlow Project  
forecastCostWorkspace3 ApiEntityProjectCashFlow Project  
forecastExpenseCostWorkspace1 ApiEntityProjectCashFlow Project  
forecastExpenseCostWorkspace2 ApiEntityProjectCashFlow Project  
forecastExpenseCostWorkspace3 ApiEntityProjectCashFlow Project  
plannedBudgetCapitalWorkspace1 ApiEntityProjectCashFlow Project  
plannedBudgetCapitalWorkspace2 ApiEntityProjectCashFlow Project  
plannedBudgetCapitalWorkspace3 ApiEntityProjectCashFlow Project  
plannedBudgetExpenseWorkspace1 ApiEntityProjectCashFlow Project  
plannedBudgetExpenseWorkspace2 ApiEntityProjectCashFlow Project  
plannedBudgetExpenseWorkspace3 ApiEntityProjectCashFlow Project  
plannedBudgetWorkspace1 ApiEntityProjectCashFlow Project  
plannedBudgetWorkspace2 ApiEntityProjectCashFlow Project  
plannedBudgetWorkspace3 ApiEntityProjectCashFlow Project  
proposedBudgetCapitalCostWorkspace1 ApiEntityProjectCashFlow Project  
proposedBudgetCapitalCostWorkspace2 ApiEntityProjectCashFlow Project  
proposedBudgetCapitalCostWorkspace3 ApiEntityProjectCashFlow Project  
proposedBudgetExpenseCostWorkspace1 ApiEntityProjectCashFlow Project  
proposedBudgetExpenseCostWorkspace2 ApiEntityProjectCashFlow Project  
proposedBudgetExpenseCostWorkspace3 ApiEntityProjectCashFlow Project  
spendCostWorkspace1 ApiEntityProjectCashFlow Project  
spendCostWorkspace2 ApiEntityProjectCashFlow Project  
spendCostWorkspace3 ApiEntityProjectCashFlow Project  
spendPlannedVarianceWorkspace1 ApiEntityProjectCashFlow Project  
spendPlannedVarianceWorkspace2 ApiEntityProjectCashFlow Project  
spendPlannedVarianceWorkspace3 ApiEntityProjectCashFlow Project  
yearEndForecastCostWorkspace1 ApiEntityProjectCashFlow Project  
yearEndForecastCostWorkspace2 ApiEntityProjectCashFlow Project  
yearEndForecastCostWorkspace3 ApiEntityProjectCashFlow Project  
ytdActualCostWorkspace1 ApiEntityProjectCashFlow Project  
ytdActualCostWorkspace2 ApiEntityProjectCashFlow Project  
ytdActualCostWorkspace3 ApiEntityProjectCashFlow Project  
actualCapitalCostDistributedWorkspace1 ApiEntityProjectFinancial Project  
actualCapitalCostDistributedWorkspace2 ApiEntityProjectFinancial Project  
actualCapitalCostDistributedWorkspace3 ApiEntityProjectFinancial Project  
actualCapitalCostPresentValueWorkspace1 ApiEntityProjectFinancial Project  
actualCapitalCostPresentValueWorkspace2 ApiEntityProjectFinancial Project  
actualCapitalCostPresentValueWorkspace3 ApiEntityProjectFinancial Project  
actualCapitalCostUnDistributedWorkspace1 ApiEntityProjectFinancial Project  
actualCapitalCostUnDistributedWorkspace2 ApiEntityProjectFinancial Project  
actualCapitalCostUnDistributedWorkspace3 ApiEntityProjectFinancial Project  
actualCapitalCostWorkspace1 ApiEntityProjectFinancial Project  
actualCapitalCostWorkspace2 ApiEntityProjectFinancial Project  
actualCapitalCostWorkspace3 ApiEntityProjectFinancial Project  
actualCostPresentValueWorkspace1 ApiEntityProjectFinancial Project  
actualCostPresentValueWorkspace2 ApiEntityProjectFinancial Project  
actualCostPresentValueWorkspace3 ApiEntityProjectFinancial Project  
actualCostWorkspace1 ApiEntityProjectFinancial Project  
actualCostWorkspace2 ApiEntityProjectFinancial Project  
actualCostWorkspace3 ApiEntityProjectFinancial Project  
actualExpenseCostDistributedWorkspace1 ApiEntityProjectFinancial Project  
actualExpenseCostDistributedWorkspace2 ApiEntityProjectFinancial Project  
actualExpenseCostDistributedWorkspace3 ApiEntityProjectFinancial Project  
actualExpenseCostPresentValueWorkspace1 ApiEntityProjectFinancial Project  
actualExpenseCostPresentValueWorkspace2 ApiEntityProjectFinancial Project  
actualExpenseCostPresentValueWorkspace3 ApiEntityProjectFinancial Project  
actualExpenseCostUnDistributedWorkspace1 ApiEntityProjectFinancial Project  
actualExpenseCostUnDistributedWorkspace2 ApiEntityProjectFinancial Project  
actualExpenseCostUnDistributedWorkspace3 ApiEntityProjectFinancial Project  
actualExpenseCostWorkspace1 ApiEntityProjectFinancial Project  
actualExpenseCostWorkspace2 ApiEntityProjectFinancial Project  
actualExpenseCostWorkspace3 ApiEntityProjectFinancial Project  
atCompletionCostWorkspace1 ApiEntityProjectFinancial Project  
atCompletionCostWorkspace2 ApiEntityProjectFinancial Project  
atCompletionCostWorkspace3 ApiEntityProjectFinancial Project  
benefitsDistributedWorkspace1 ApiEntityProjectFinancial Project  
benefitsDistributedWorkspace2 ApiEntityProjectFinancial Project  
benefitsDistributedWorkspace3 ApiEntityProjectFinancial Project  
benefitsPresentValueWorkspace1 ApiEntityProjectFinancial Project  
benefitsPresentValueWorkspace2 ApiEntityProjectFinancial Project  
benefitsPresentValueWorkspace3 ApiEntityProjectFinancial Project  
benefitsUndistributedWorkspace1 ApiEntityProjectFinancial Project  
benefitsUndistributedWorkspace2 ApiEntityProjectFinancial Project  
benefitsUndistributedWorkspace3 ApiEntityProjectFinancial Project  
benefitsWorkspace1 ApiEntityProjectFinancial Project  
benefitsWorkspace2 ApiEntityProjectFinancial Project  
benefitsWorkspace3 ApiEntityProjectFinancial Project  
costVarianceWorkspace1 ApiEntityProjectFinancial Project  
costVarianceWorkspace2 ApiEntityProjectFinancial Project  
costVarianceWorkspace3 ApiEntityProjectFinancial Project  
currentApprovedBudgetCapitalCostDistributedWorkspace1 ApiEntityProjectFinancial Project  
currentApprovedBudgetCapitalCostDistributedWorkspace2 ApiEntityProjectFinancial Project  
currentApprovedBudgetCapitalCostDistributedWorkspace3 ApiEntityProjectFinancial Project  
currentApprovedBudgetCapitalCostPresentValueWorkspace1 ApiEntityProjectFinancial Project  
currentApprovedBudgetCapitalCostPresentValueWorkspace2 ApiEntityProjectFinancial Project  
currentApprovedBudgetCapitalCostPresentValueWorkspace3 ApiEntityProjectFinancial Project  
currentApprovedBudgetCapitalCostUnDistributedWorkspace1 ApiEntityProjectFinancial Project  
currentApprovedBudgetCapitalCostUnDistributedWorkspace2 ApiEntityProjectFinancial Project  
currentApprovedBudgetCapitalCostUnDistributedWorkspace3 ApiEntityProjectFinancial Project  
currentApprovedBudgetCapitalCostWorkspace1 ApiEntityProjectFinancial Project  
currentApprovedBudgetCapitalCostWorkspace2 ApiEntityProjectFinancial Project  
currentApprovedBudgetCapitalCostWorkspace3 ApiEntityProjectFinancial Project  
currentApprovedBudgetExpenseCostDistributedWorkspace1 ApiEntityProjectFinancial Project  
currentApprovedBudgetExpenseCostDistributedWorkspace2 ApiEntityProjectFinancial Project  
currentApprovedBudgetExpenseCostDistributedWorkspace3 ApiEntityProjectFinancial Project  
currentApprovedBudgetExpenseCostPresentValueWorkspace1 ApiEntityProjectFinancial Project  
currentApprovedBudgetExpenseCostPresentValueWorkspace2 ApiEntityProjectFinancial Project  
currentApprovedBudgetExpenseCostPresentValueWorkspace3 ApiEntityProjectFinancial Project  
currentApprovedBudgetExpenseCostUnDistributedWorkspace1 ApiEntityProjectFinancial Project  
currentApprovedBudgetExpenseCostUnDistributedWorkspace2 ApiEntityProjectFinancial Project  
currentApprovedBudgetExpenseCostUnDistributedWorkspace3 ApiEntityProjectFinancial Project  
currentApprovedBudgetExpenseCostWorkspace1 ApiEntityProjectFinancial Project  
currentApprovedBudgetExpenseCostWorkspace2 ApiEntityProjectFinancial Project  
currentApprovedBudgetExpenseCostWorkspace3 ApiEntityProjectFinancial Project  
earnedValueCostWorkspace1 ApiEntityProjectFinancial Project  
earnedValueCostWorkspace2 ApiEntityProjectFinancial Project  
earnedValueCostWorkspace3 ApiEntityProjectFinancial Project  
estAtCompleteCostWorkspace1 ApiEntityProjectFinancial Project  
estAtCompleteCostWorkspace2 ApiEntityProjectFinancial Project  
estAtCompleteCostWorkspace3 ApiEntityProjectFinancial Project  
estToCompleteCostWorkspace1 ApiEntityProjectFinancial Project  
estToCompleteCostWorkspace2 ApiEntityProjectFinancial Project  
estToCompleteCostWorkspace3 ApiEntityProjectFinancial Project  
forecastCapitalCostDistributedWorkspace1 ApiEntityProjectFinancial Project  
forecastCapitalCostDistributedWorkspace2 ApiEntityProjectFinancial Project  
forecastCapitalCostDistributedWorkspace3 ApiEntityProjectFinancial Project  
forecastCapitalCostPresentValueWorkspace1 ApiEntityProjectFinancial Project  
forecastCapitalCostPresentValueWorkspace2 ApiEntityProjectFinancial Project  
forecastCapitalCostPresentValueWorkspace3 ApiEntityProjectFinancial Project  
forecastCapitalCostUnDistributedWorkspace1 ApiEntityProjectFinancial Project  
forecastCapitalCostUnDistributedWorkspace2 ApiEntityProjectFinancial Project  
forecastCapitalCostUnDistributedWorkspace3 ApiEntityProjectFinancial Project  
forecastCapitalCostWorkspace1 ApiEntityProjectFinancial Project  
forecastCapitalCostWorkspace2 ApiEntityProjectFinancial Project  
forecastCapitalCostWorkspace3 ApiEntityProjectFinancial Project  
forecastCostDistributedWorkspace1 ApiEntityProjectFinancial Project  
forecastCostDistributedWorkspace2 ApiEntityProjectFinancial Project  
forecastCostDistributedWorkspace3 ApiEntityProjectFinancial Project  
forecastCostPresentValueWorkspace1 ApiEntityProjectFinancial Project  
forecastCostPresentValueWorkspace2 ApiEntityProjectFinancial Project  
forecastCostPresentValueWorkspace3 ApiEntityProjectFinancial Project  
forecastCostUndistributedWorkspace1 ApiEntityProjectFinancial Project  
forecastCostUndistributedWorkspace2 ApiEntityProjectFinancial Project  
forecastCostUndistributedWorkspace3 ApiEntityProjectFinancial Project  
forecastCostWorkspace1 ApiEntityProjectFinancial Project  
forecastCostWorkspace2 ApiEntityProjectFinancial Project  
forecastCostWorkspace3 ApiEntityProjectFinancial Project  
forecastExpenseCostDistributedWorkspace1 ApiEntityProjectFinancial Project  
forecastExpenseCostDistributedWorkspace2 ApiEntityProjectFinancial Project  
forecastExpenseCostDistributedWorkspace3 ApiEntityProjectFinancial Project  
forecastExpenseCostPresentValueWorkspace1 ApiEntityProjectFinancial Project  
forecastExpenseCostPresentValueWorkspace2 ApiEntityProjectFinancial Project  
forecastExpenseCostPresentValueWorkspace3 ApiEntityProjectFinancial Project  
forecastExpenseCostUnDistributedWorkspace1 ApiEntityProjectFinancial Project  
forecastExpenseCostUnDistributedWorkspace2 ApiEntityProjectFinancial Project  
forecastExpenseCostUnDistributedWorkspace3 ApiEntityProjectFinancial Project  
forecastExpenseCostWorkspace1 ApiEntityProjectFinancial Project  
forecastExpenseCostWorkspace2 ApiEntityProjectFinancial Project  
forecastExpenseCostWorkspace3 ApiEntityProjectFinancial Project  
netPresentValueWorkspace1 ApiEntityProjectFinancial Project  
netPresentValueWorkspace2 ApiEntityProjectFinancial Project  
netPresentValueWorkspace3 ApiEntityProjectFinancial Project  
plannedBudgetCapitalDistributedWorkspace1 ApiEntityProjectFinancial Project  
plannedBudgetCapitalDistributedWorkspace2 ApiEntityProjectFinancial Project  
plannedBudgetCapitalDistributedWorkspace3 ApiEntityProjectFinancial Project  
plannedBudgetCapitalPresentValueWorkspace1 ApiEntityProjectFinancial Project  
plannedBudgetCapitalPresentValueWorkspace2 ApiEntityProjectFinancial Project  
plannedBudgetCapitalPresentValueWorkspace3 ApiEntityProjectFinancial Project  
plannedBudgetCapitalUnDistributedWorkspace1 ApiEntityProjectFinancial Project  
plannedBudgetCapitalUnDistributedWorkspace2 ApiEntityProjectFinancial Project  
plannedBudgetCapitalUnDistributedWorkspace3 ApiEntityProjectFinancial Project  
plannedBudgetCapitalWorkspace1 ApiEntityProjectFinancial Project  
plannedBudgetCapitalWorkspace2 ApiEntityProjectFinancial Project  
plannedBudgetCapitalWorkspace3 ApiEntityProjectFinancial Project  
plannedBudgetDistributedWorkspace1 ApiEntityProjectFinancial Project  
plannedBudgetDistributedWorkspace2 ApiEntityProjectFinancial Project  
plannedBudgetDistributedWorkspace3 ApiEntityProjectFinancial Project  
plannedBudgetExpenseDistributedWorkspace1 ApiEntityProjectFinancial Project  
plannedBudgetExpenseDistributedWorkspace2 ApiEntityProjectFinancial Project  
plannedBudgetExpenseDistributedWorkspace3 ApiEntityProjectFinancial Project  
plannedBudgetExpensePresentValueWorkspace1 ApiEntityProjectFinancial Project  
plannedBudgetExpensePresentValueWorkspace2 ApiEntityProjectFinancial Project  
plannedBudgetExpensePresentValueWorkspace3 ApiEntityProjectFinancial Project  
plannedBudgetExpenseUnDistributedWorkspace1 ApiEntityProjectFinancial Project  
plannedBudgetExpenseUnDistributedWorkspace2 ApiEntityProjectFinancial Project  
plannedBudgetExpenseUnDistributedWorkspace3 ApiEntityProjectFinancial Project  
plannedBudgetExpenseWorkspace1 ApiEntityProjectFinancial Project  
plannedBudgetExpenseWorkspace2 ApiEntityProjectFinancial Project  
plannedBudgetExpenseWorkspace3 ApiEntityProjectFinancial Project  
plannedBudgetPresentValueWorkspace1 ApiEntityProjectFinancial Project  
plannedBudgetPresentValueWorkspace2 ApiEntityProjectFinancial Project  
plannedBudgetPresentValueWorkspace3 ApiEntityProjectFinancial Project  
plannedBudgetUndistributedWorkspace1 ApiEntityProjectFinancial Project  
plannedBudgetUndistributedWorkspace2 ApiEntityProjectFinancial Project  
plannedBudgetUndistributedWorkspace3 ApiEntityProjectFinancial Project  
plannedBudgetWorkspace1 ApiEntityProjectFinancial Project  
plannedBudgetWorkspace2 ApiEntityProjectFinancial Project  
plannedBudgetWorkspace3 ApiEntityProjectFinancial Project  
plannedValueCostWorkspace1 ApiEntityProjectFinancial Project  
plannedValueCostWorkspace2 ApiEntityProjectFinancial Project  
plannedValueCostWorkspace3 ApiEntityProjectFinancial Project  
proposedBudgetCapitalCostDistributedWorkspace1 ApiEntityProjectFinancial Project  
proposedBudgetCapitalCostDistributedWorkspace2 ApiEntityProjectFinancial Project  
proposedBudgetCapitalCostDistributedWorkspace3 ApiEntityProjectFinancial Project  
proposedBudgetCapitalCostPresentValueWorkspace1 ApiEntityProjectFinancial Project  
proposedBudgetCapitalCostPresentValueWorkspace2 ApiEntityProjectFinancial Project  
proposedBudgetCapitalCostPresentValueWorkspace3 ApiEntityProjectFinancial Project  
proposedBudgetCapitalCostUnDistributedWorkspace1 ApiEntityProjectFinancial Project  
proposedBudgetCapitalCostUnDistributedWorkspace2 ApiEntityProjectFinancial Project  
proposedBudgetCapitalCostUnDistributedWorkspace3 ApiEntityProjectFinancial Project  
proposedBudgetCapitalCostWorkspace1 ApiEntityProjectFinancial Project  
proposedBudgetCapitalCostWorkspace2 ApiEntityProjectFinancial Project  
proposedBudgetCapitalCostWorkspace3 ApiEntityProjectFinancial Project  
proposedBudgetExpenseCostDistributedWorkspace1 ApiEntityProjectFinancial Project  
proposedBudgetExpenseCostDistributedWorkspace2 ApiEntityProjectFinancial Project  
proposedBudgetExpenseCostDistributedWorkspace3 ApiEntityProjectFinancial Project  
proposedBudgetExpenseCostPresentValueWorkspace1 ApiEntityProjectFinancial Project  
proposedBudgetExpenseCostPresentValueWorkspace2 ApiEntityProjectFinancial Project  
proposedBudgetExpenseCostPresentValueWorkspace3 ApiEntityProjectFinancial Project  
proposedBudgetExpenseCostUnDistributedWorkspace1 ApiEntityProjectFinancial Project  
proposedBudgetExpenseCostUnDistributedWorkspace2 ApiEntityProjectFinancial Project  
proposedBudgetExpenseCostUnDistributedWorkspace3 ApiEntityProjectFinancial Project  
proposedBudgetExpenseCostWorkspace1 ApiEntityProjectFinancial Project  
proposedBudgetExpenseCostWorkspace2 ApiEntityProjectFinancial Project  
proposedBudgetExpenseCostWorkspace3 ApiEntityProjectFinancial Project  
scheduleVarianceWorkspace1 ApiEntityProjectFinancial Project  
scheduleVarianceWorkspace2 ApiEntityProjectFinancial Project  
scheduleVarianceWorkspace3 ApiEntityProjectFinancial Project  
spendCostWorkspace1 ApiEntityProjectFinancial Project  
spendCostWorkspace2 ApiEntityProjectFinancial Project  
spendCostWorkspace3 ApiEntityProjectFinancial Project  
spendForecastVarWorkspace1 ApiEntityProjectFinancial Project  
spendForecastVarWorkspace2 ApiEntityProjectFinancial Project  
spendForecastVarWorkspace3 ApiEntityProjectFinancial Project  
spendPlannedVarianceWorkspace1 ApiEntityProjectFinancial Project  
spendPlannedVarianceWorkspace2 ApiEntityProjectFinancial Project  
spendPlannedVarianceWorkspace3 ApiEntityProjectFinancial Project  
yearEndForecastCostWorkspace1 ApiEntityProjectFinancial Project  
yearEndForecastCostWorkspace2 ApiEntityProjectFinancial Project  
yearEndForecastCostWorkspace3 ApiEntityProjectFinancial Project  
ytdSpendCostWorkspace1 ApiEntityProjectFinancial Project  
ytdSpendCostWorkspace2 ApiEntityProjectFinancial Project  
ytdSpendCostWorkspace3 ApiEntityProjectFinancial Project  
isMissingActivityAssignment ApiEntityWorkManagerTask Work Manager Task  

Endpoints

Endpoint HTTP Method Tag Name ApiEntity Name Comments
/action/assignmentspread/calculate POST Spreads ApiEntityCalcAssignmentSpread  
/action/spreadResult/{jobId} GET Spreads    
/util/testConnection GET Util    

Modified

Fields

Field Name ApiEntity Name Tag Name Comments
jobType ApiEntityJobDetail Action CALCULATE_ASSIGNMENT_SPREADS, IMPORT_XER_FROM_P6, WORK_RATE_SYNC_WORKSPACE, WORK_RATE_SYNC_TENANT were added to the list of allowed values for the field.
description ApiEntityPreExecutionValidationProblem Workflow CP_INTEGRATION_SOURCE_NOT_SET, WORK_RATE_SYNC_TENANT_ERROR, CALCULATE_ASSIGNMENT_SPREADS_REQUEST_DETAILS_HEADER_SUCCESS, CP_INTEGRATION_SUBCURVE_DATA_ROLLUP, CP_INTEGRATION_SUBCURVE_DATA_IGNORED, CALCULATE_ASSIGNMENT_SPREADS_REQUEST_DETAILS_HEADER_FAILED, CALCULATE_SPREADS_FAILED_ERROR_PREFIX, WORK_RATE_SYNC_WORKSPACE_ERROR, CALCULATE_ASSIGNMENT_SPREADS_REQUEST_DETAILS_HEADER_WARNING, CALCULATE_SPREADS_COST_ITEMS_IGNORED_WARNING, CP_INTEGRATION_SUMMARY_DATA_IGNORED, CALCULATE_SPREADS_REQUEST_SETTINGS_ERROR, PROJECT_CALENDAR_COUNT_FAILED, WORK_RATE_SYNC_SUCCESS were added to the list of allowed values for the field.
type ApiEntityPreExecutionValidationProblem Workflow CP_INTEGRATION_SOURCE_NOT_SET, WORK_RATE_SYNC_TENANT_ERROR, CALCULATE_ASSIGNMENT_SPREADS_REQUEST_DETAILS_HEADER_SUCCESS, CP_INTEGRATION_SUBCURVE_DATA_ROLLUP, CP_INTEGRATION_SUBCURVE_DATA_IGNORED, CALCULATE_ASSIGNMENT_SPREADS_REQUEST_DETAILS_HEADER_FAILED, CALCULATE_SPREADS_FAILED_ERROR_PREFIX, WORK_RATE_SYNC_WORKSPACE_ERROR, CALCULATE_ASSIGNMENT_SPREADS_REQUEST_DETAILS_HEADER_WARNING, CALCULATE_SPREADS_COST_ITEMS_IGNORED_WARNING, CP_INTEGRATION_SUMMARY_DATA_IGNORED, CALCULATE_SPREADS_REQUEST_SETTINGS_ERROR, PROJECT_CALENDAR_COUNT_FAILED, WORK_RATE_SYNC_SUCCESS were added to the list of allowed values for the field.