25.9

The following are no longer supported by the API as of 25.9.

Deprecated

Fields

Field Name Replacement Field Name (if any) ApiEntity Name Tag Name Comments
projectActualsCost   ApiEntityProjectActualsInput Project Actuals  
projectActualsCost   ApiEntityExternallySourcedProjectActualsInput Project Actuals  

Endpoints

Endpoint HTTP Method Replacement Endpoint (if any) Tag Name ApiEntity Name Comments
/configuredField/replicateObjectInWorkspaces/configuredField/{columnDefinitionId}/workspace/{workspaceId} POST PUT /configuredField/move Configured Fields ApiEntityConfiguredFieldMoveRequestInput  

Removed

Fields

Deprecated Field Name Replacement Field Name (If any) ApiEntity Name Tag Name Comment Deprecated Version
link ApiEntityBaselineInput Action 23.11
updateDate ApiEntityBaselineInput Action 23.11
link ApiEntityCapitalPlanSnapshotInput Action 23.11
snapshotCode ApiEntityCapitalPlanSnapshotInput Action 24.4
time ApiEntityCapitalPlanSnapshotInput Action 24.4
type ApiEntityCapitalPlanSnapshotInput Action 24.4
updateDate ApiEntityCapitalPlanSnapshotInput Action 23.11
link ApiEntityProjectScheduleInput Action 23.11
updateDate ApiEntityProjectScheduleInput Action 23.11
link ApiEntityProjectSnapshotInput Action 24.4
snapshotCode ApiEntityProjectSnapshotInput Action 24.4
time ApiEntityProjectSnapshotInput Action 24.4
type ApiEntityProjectSnapshotInput Action 24.4
updateDate ApiEntityProjectSnapshotInput Action 24.4
link ApiEntityReportOverridesInput Action 24.4
updateDate ApiEntityReportOverridesInput Action 24.4
activityId ApiEntityActivityConfiguredFieldValueInput Activity 23.11
costValue ApiEntityActivityConfiguredFieldValueInput Activity 23.11
costValueWorkspace1 ApiEntityActivityConfiguredFieldValueInput Activity 23.11
costValueWorkspace2 ApiEntityActivityConfiguredFieldValueInput Activity 23.11
costValueWorkspace3 ApiEntityActivityConfiguredFieldValueInput Activity 23.11
exceptionMessage ApiEntityActivityConfiguredFieldValueInput Activity 23.11
hasException ApiEntityActivityConfiguredFieldValueInput Activity 23.11
link ApiEntityActivityConfiguredFieldValueInput Activity 23.11
updateDate ApiEntityActivityConfiguredFieldValueInput Activity 23.11
actualThisPeriodTotalCost ApiEntityActivityFinancialInput Activity 23.11
actualThisPeriodTotalCostProject ApiEntityActivityFinancialInput Activity 23.11
actualTotalCost ApiEntityActivityFinancialInput Activity 23.11
actualTotalCostProject ApiEntityActivityFinancialInput Activity 23.11
atCompletionTotalCost ApiEntityActivityFinancialInput Activity 23.11
atCompletionTotalCostProject ApiEntityActivityFinancialInput Activity 23.11
atCompletionVariance ApiEntityActivityFinancialInput Activity 23.11
atCompletionVarianceProject ApiEntityActivityFinancialInput Activity 23.11
budgetAtCompletion ApiEntityActivityFinancialInput Activity 23.11
budgetAtCompletionProject ApiEntityActivityFinancialInput Activity 23.11
earnedValueCost ApiEntityActivityFinancialInput Activity 23.11
earnedValueCostProject ApiEntityActivityFinancialInput Activity 23.11
estimateAtCompletionCost ApiEntityActivityFinancialInput Activity 23.11
estimateAtCompletionCostProject ApiEntityActivityFinancialInput Activity 23.11
estimateToCompletionCost ApiEntityActivityFinancialInput Activity 23.11
estimateToCompletionCostProject ApiEntityActivityFinancialInput Activity 23.11
laborCostVariance ApiEntityActivityFinancialInput Activity 23.11
link ApiEntityActivityFinancialInput Activity 23.11
materialCostVariance ApiEntityActivityFinancialInput Activity 23.11
nonLaborCostVariance ApiEntityActivityFinancialInput Activity 23.11
plannedTotalCost ApiEntityActivityFinancialInput Activity 23.11
plannedTotalCostProject ApiEntityActivityFinancialInput Activity 23.11
plannedValueCost ApiEntityActivityFinancialInput Activity 23.11
plannedValueCostProject ApiEntityActivityFinancialInput Activity 23.11
priorActualLaborCost ApiEntityActivityFinancialInput Activity 23.11
priorActualLaborCostProject ApiEntityActivityFinancialInput Activity 23.11
priorActualMaterialCost ApiEntityActivityFinancialInput Activity 23.11
priorActualMaterialCostProject ApiEntityActivityFinancialInput Activity 23.11
priorActualNonLaborCost ApiEntityActivityFinancialInput Activity 23.11
priorActualNonLaborCostProject ApiEntityActivityFinancialInput Activity 23.11
priorActualTotalCost ApiEntityActivityFinancialInput Activity 23.11
priorActualTotalCostProject ApiEntityActivityFinancialInput Activity 23.11
project ApiEntityActivityFinancialInput Activity 23.11
remainingTotalCost ApiEntityActivityFinancialInput Activity 23.11
remainingTotalCostProject ApiEntityActivityFinancialInput Activity 23.11
scheduleVariance ApiEntityActivityFinancialInput Activity 23.11
scheduleVarianceProject ApiEntityActivityFinancialInput Activity 23.11
totalCostVariance ApiEntityActivityFinancialInput Activity 23.11
updateDate ApiEntityActivityFinancialInput Activity 23.11
varCost ApiEntityActivityFinancialInput Activity 23.11
varCostProject ApiEntityActivityFinancialInput Activity 23.11
activityWorkManagerTaskDateStatus ApiEntityActivityInput Activity 23.11
activityWorkManagerTaskStatus ApiEntityActivityInput Activity 23.11
activityWorkManagerTaskStatusIndicator ApiEntityActivityInput Activity 23.11
actualDuration ApiEntityActivityInput Activity 23.11
atCompletionBudgetLaborUnits ApiEntityActivityInput Activity 23.11
completedWeight ApiEntityActivityInput Activity 23.11
costPerformanceIndex ApiEntityActivityInput Activity 23.11
costPerformanceIndexLaborUnits ApiEntityActivityInput Activity 23.11
costVarianceIndex ApiEntityActivityInput Activity 23.11
costVarianceLaborUnits ApiEntityActivityInput Activity 23.11
costVarianceLaborUnitsIndex ApiEntityActivityInput Activity 23.11
critical ApiEntityActivityInput Activity 23.11
currentBaselineFields ApiEntityActivityInput Activity 23.11
danglingFinish ApiEntityActivityInput Activity 23.11
danglingStart ApiEntityActivityInput Activity 23.11
drivingPath ApiEntityActivityInput Activity 23.11
durationPercentComplete ApiEntityActivityInput Activity 23.11
durationPercentOfPlanned ApiEntityActivityInput Activity 23.11
earnedValueLaborUnits ApiEntityActivityInput Activity 23.11
estimateAtCompletionLaborUnits ApiEntityActivityInput Activity 23.11
estimateToCompletionLaborUnits ApiEntityActivityInput Activity 23.11
ffPredecessor ApiEntityActivityInput Activity 23.11
freeFloat ApiEntityActivityInput Activity 23.11
fsPredecessor ApiEntityActivityInput Activity 23.11
hardConstraint ApiEntityActivityInput Activity 23.11
invalidProgressDate ApiEntityActivityInput Activity 23.11
laborUnitsCompletePercent ApiEntityActivityInput Activity 23.11
largeDuration ApiEntityActivityInput Activity 23.11
largeFloat ApiEntityActivityInput Activity 23.11
lateActivity ApiEntityActivityInput Activity 23.11
link ApiEntityActivityInput Activity 23.11
negativeFloat ApiEntityActivityInput Activity 23.11
nonLaborUnitsCompletePercent ApiEntityActivityInput Activity 23.11
noPredecessor ApiEntityActivityInput Activity 23.11
noResource ApiEntityActivityInput Activity 23.11
noSuccessor ApiEntityActivityInput Activity 23.11
openEnds ApiEntityActivityInput Activity 23.11
originalBaselineFields ApiEntityActivityInput Activity 23.11
otherBaselineFields ApiEntityActivityInput Activity 23.11
performancePercentComplete ApiEntityActivityInput Activity 23.11
plannedValueLaborUnits ApiEntityActivityInput Activity 23.11
predecessorLag ApiEntityActivityInput Activity 23.11
predecessorNegativeLag ApiEntityActivityInput Activity 23.11
primaryResource ApiEntityActivityInput Activity 23.11
priorActualLaborUnits ApiEntityActivityInput Activity 23.11
priorActualNonLaborUnits ApiEntityActivityInput Activity 23.11
recordCount ApiEntityActivityInput Activity 23.11
remainingFloat ApiEntityActivityInput Activity 23.11
resourceCodeList ApiEntityActivityInput Activity 23.11
resourceNameList ApiEntityActivityInput Activity 23.11
roleCodeList ApiEntityActivityInput Activity 23.11
roleNameList ApiEntityActivityInput Activity 23.11
schedulePercentComplete ApiEntityActivityInput Activity 23.11
schedulePerfIndexLaborUnits ApiEntityActivityInput Activity 23.11
schedulePerformanceIndex ApiEntityActivityInput Activity 23.11
scheduleVarianceIndex ApiEntityActivityInput Activity 23.11
scheduleVarianceLaborUnits ApiEntityActivityInput Activity 23.11
scheduleVarIndexLaborUnits ApiEntityActivityInput Activity 23.11
scopePercentComplete ApiEntityActivityInput Activity 23.11
sfPredecessor ApiEntityActivityInput Activity 23.11
softConstraint ApiEntityActivityInput Activity 23.11
ssPredecessor ApiEntityActivityInput Activity 23.11
starred ApiEntityActivityInput Activity 23.11
toCompletePerformanceIndex ApiEntityActivityInput Activity 23.11
totalFloat ApiEntityActivityInput Activity 23.11
unitsPercentComplete ApiEntityActivityInput Activity 23.11
updateDate ApiEntityActivityInput Activity 23.11
userBaseline1Fields ApiEntityActivityInput Activity 23.11
userBaseline2Fields ApiEntityActivityInput Activity 23.11
userBaseline3Fields ApiEntityActivityInput Activity 23.11
varDuration ApiEntityActivityInput Activity 23.11
varFinishDate ApiEntityActivityInput Activity 23.11
varianceAtCompletionLaborUnits ApiEntityActivityInput Activity 23.11
varLaborUnits ApiEntityActivityInput Activity 23.11
varNonLaborUnits ApiEntityActivityInput Activity 23.11
varStartDate ApiEntityActivityInput Activity 23.11
weight ApiEntityActivityInput Activity 23.11
workManagerTaskCount ApiEntityActivityInput Activity 23.11
workManagerTaskPlannedCompleteCount ApiEntityActivityInput Activity 23.11
workManagerTaskPlannedNotCompleteCount ApiEntityActivityInput Activity 23.11
workManagerTaskPlannedOutsideCount ApiEntityActivityInput Activity 23.11
workManagerTaskUnplannedCount ApiEntityActivityInput Activity 23.11
activity ApiEntityActivityUncertaintyInput Activity 23.11
link ApiEntityActivityUncertaintyInput Activity 23.11
updateDate ApiEntityActivityUncertaintyInput Activity 23.11
codeTypeName ApiEntityCodeValueActivityInput Activity 23.11
link ApiEntityCodeValueActivityInput Activity 23.11
sequenceNumber ApiEntityCodeValueActivityInput Activity 23.11
updateDate ApiEntityCodeValueActivityInput Activity 23.11
link ApiEntityActivityFavoriteInput Activity Favorite 24.5
updateDate ApiEntityActivityFavoriteInput Activity Favorite 24.5
link ApiEntityActivityRiskInput Activity Risk 23.11
updateDate ApiEntityActivityRiskInput Activity Risk 23.11
link ApiEntityActivityRiskQuantifiedOtherImpactInput Activity Risk 23.11
updateDate ApiEntityActivityRiskQuantifiedOtherImpactInput Activity Risk 23.11
ldapGuid ApiEntityApplicationUserGroupInput Application User Group 24.4
link ApiEntityApplicationUserGroupInput Application User Group 23.11
updateDate ApiEntityApplicationUserGroupInput Application User Group 23.11
link ApiEntityAssignmentFavoriteInput Assignment Favorite 24.5
updateDate ApiEntityAssignmentFavoriteInput Assignment Favorite 24.5
calendarCode ApiEntityCalendarExceptionInput Calendar 24.4
link ApiEntityCalendarExceptionInput Calendar 24.4
updateDate ApiEntityCalendarExceptionInput Calendar 24.4
workspaceCode ApiEntityCalendarExceptionInput Calendar 24.4
associationType ApiEntityCalendarInput Calendar 24.4
link ApiEntityCalendarInput Calendar 24.4
updateDate ApiEntityCalendarInput Calendar 24.4
link ApiEntityCapitalPortfolioMemberInput Capital Portfolio Member 24.5
updateDate ApiEntityCapitalPortfolioMemberInput Capital Portfolio Member 24.5
copiedFromItem ApiEntityCBSSheetCodeInput CBS 23.1
costSheetRowCost ApiEntityCBSSheetCodeInput CBS 23.1
isTotalRow ApiEntityCBSSheetCodeInput CBS 23.1
link ApiEntityCBSSheetCodeInput CBS 23.1
sequenceNumber ApiEntityCBSSheetCodeInput CBS 23.1
updateDate ApiEntityCBSSheetCodeInput CBS 23.1
costValue ApiEntityCBSSheetRowConfiguredFieldValueInput CBS 23.1
costValueWorkspace1 ApiEntityCBSSheetRowConfiguredFieldValueInput CBS 23.1
costValueWorkspace2 ApiEntityCBSSheetRowConfiguredFieldValueInput CBS 23.1
costValueWorkspace3 ApiEntityCBSSheetRowConfiguredFieldValueInput CBS 23.1
exceptionMessage ApiEntityCBSSheetRowConfiguredFieldValueInput CBS 23.1
hasException ApiEntityCBSSheetRowConfiguredFieldValueInput CBS 23.1
link ApiEntityCBSSheetRowConfiguredFieldValueInput CBS 23.1
updateDate ApiEntityCBSSheetRowConfiguredFieldValueInput CBS 23.1
actualHoursToDate ApiEntityCBSSheetRowInput CBS 23.1
approvedChangedHours ApiEntityCBSSheetRowInput CBS 23.1
atCompletionHours ApiEntityCBSSheetRowInput CBS 23.1
bacHours ApiEntityCBSSheetRowInput CBS 23.1
baselineHours ApiEntityCBSSheetRowInput CBS 23.1
cbsSheetCodeId ApiEntityCBSSheetRowInput CBS 23.1
eacHours ApiEntityCBSSheetRowInput CBS 23.1
earnedHours ApiEntityCBSSheetRowInput CBS 23.1
etcAdjustedHours ApiEntityCBSSheetRowInput CBS 23.1
etcHours ApiEntityCBSSheetRowInput CBS 23.1
installedHours ApiEntityCBSSheetRowInput CBS 23.1
link ApiEntityCBSSheetRowInput CBS 23.1
pendingChangedHours ApiEntityCBSSheetRowInput CBS 23.1
plannedHours ApiEntityCBSSheetRowInput CBS 23.1
projectActualHours ApiEntityCBSSheetRowInput CBS 23.1
projectEarnedHours ApiEntityCBSSheetRowInput CBS 23.1
projectHPI ApiEntityCBSSheetRowInput CBS 23.1
remainingHours ApiEntityCBSSheetRowInput CBS 23.1
revisedHours ApiEntityCBSSheetRowInput CBS 23.1
updateDate ApiEntityCBSSheetRowInput CBS 23.1
link ApiEntityCBSSheetSegmentInput CBS 23.11
updateDate ApiEntityCBSSheetSegmentInput CBS 23.11
isCodeCopied ApiEntityCBSTemplateCodeInput CBS 23.11
isTotalRow ApiEntityCBSTemplateCodeInput CBS 23.11
link ApiEntityCBSTemplateCodeInput CBS 23.11
sequenceNumber ApiEntityCBSTemplateCodeInput CBS 23.11
templateRowCost ApiEntityCBSTemplateCodeInput CBS 23.11
updateDate ApiEntityCBSTemplateCodeInput CBS 23.11
costValue ApiEntityCBSTemplateRowConfiguredFieldValueInput CBS 23.11
costValueWorkspace1 ApiEntityCBSTemplateRowConfiguredFieldValueInput CBS 23.11
costValueWorkspace2 ApiEntityCBSTemplateRowConfiguredFieldValueInput CBS 23.11
costValueWorkspace3 ApiEntityCBSTemplateRowConfiguredFieldValueInput CBS 23.11
exceptionMessage ApiEntityCBSTemplateRowConfiguredFieldValueInput CBS 23.11
hasException ApiEntityCBSTemplateRowConfiguredFieldValueInput CBS 23.11
link ApiEntityCBSTemplateRowConfiguredFieldValueInput CBS 23.11
updateDate ApiEntityCBSTemplateRowConfiguredFieldValueInput CBS 23.11
actualHoursToDate ApiEntityCBSTemplateRowInput CBS 23.11
approvedChangedHours ApiEntityCBSTemplateRowInput CBS 23.11
atCompletionHours ApiEntityCBSTemplateRowInput CBS 23.11
bacHours ApiEntityCBSTemplateRowInput CBS 23.11
baselineHours ApiEntityCBSTemplateRowInput CBS 23.11
cbsTemplateCodeId ApiEntityCBSTemplateRowInput CBS 23.11
eacHours ApiEntityCBSTemplateRowInput CBS 23.11
earnedHours ApiEntityCBSTemplateRowInput CBS 23.11
etcAdjustedHours ApiEntityCBSTemplateRowInput CBS 23.11
etcHours ApiEntityCBSTemplateRowInput CBS 23.11
installedHours ApiEntityCBSTemplateRowInput CBS 23.11
link ApiEntityCBSTemplateRowInput CBS 23.11
pendingChangedHours ApiEntityCBSTemplateRowInput CBS 23.11
plannedHours ApiEntityCBSTemplateRowInput CBS 23.11
projectActualHours ApiEntityCBSTemplateRowInput CBS 23.11
projectEarnedHours ApiEntityCBSTemplateRowInput CBS 23.11
projectHPI ApiEntityCBSTemplateRowInput CBS 23.11
remainingHours ApiEntityCBSTemplateRowInput CBS 23.11
revisedHours ApiEntityCBSTemplateRowInput CBS 23.11
templateItemId ApiEntityCBSTemplateRowInput CBS 23.11
updateDate ApiEntityCBSTemplateRowInput CBS 23.11
copiedFromItem ApiEntityExternallySourcedCBSSheetCodeInput CBS 23.1
costSheetRowCost ApiEntityExternallySourcedCBSSheetCodeInput CBS 23.11
isTotalRow ApiEntityExternallySourcedCBSSheetCodeInput CBS 23.11
link ApiEntityExternallySourcedCBSSheetCodeInput CBS 23.11
sequenceNumber ApiEntityExternallySourcedCBSSheetCodeInput CBS 23.11
updateDate ApiEntityExternallySourcedCBSSheetCodeInput CBS 23.1
link ApiEntityProjectCostingSourceInput CBS 24.5
updateDate ApiEntityProjectCostingSourceInput CBS 24.5
link ApiEntityCodeEntityTypeInput Code Type 23.11
updateDate ApiEntityCodeEntityTypeInput Code Type 23.11
associationType ApiEntityCodeTypeInput Code Type 23.11
link ApiEntityCodeTypeInput Code Type 23.11
updateDate ApiEntityCodeTypeInput Code Type 23.11
link ApiEntityCodeValueInput Code Value 23.11
parentCodeValueCode ApiEntityCodeValueInput Code Value 24.3
updateDate ApiEntityCodeValueInput Code Value 23.11
costValue ApiEntityCompanyConfiguredFieldValueInput Company 23.11
costValueWorkspace1 ApiEntityCompanyConfiguredFieldValueInput Company 23.11
costValueWorkspace2 ApiEntityCompanyConfiguredFieldValueInput Company 23.11
costValueWorkspace3 ApiEntityCompanyConfiguredFieldValueInput Company 23.11
exceptionMessage ApiEntityCompanyConfiguredFieldValueInput Company 23.11
hasException ApiEntityCompanyConfiguredFieldValueInput Company 23.11
link ApiEntityCompanyConfiguredFieldValueInput Company 23.11
updateDate ApiEntityCompanyConfiguredFieldValueInput Company 23.11
link ApiEntityCompanyEnterpriseCertificationInput Company 23.11
updateDate ApiEntityCompanyEnterpriseCertificationInput Company 23.11
link ApiEntityCompanyLaborTypeInput Company 23.11
updateDate ApiEntityCompanyLaborTypeInput Company 23.11
link ApiEntityCompanyWorkTypeInput Company 23.11
updateDate ApiEntityCompanyWorkTypeInput Company 23.11
distance ApiEntityExternallySourcedCompanyInput Company 23.12
distanceMetric ApiEntityExternallySourcedCompanyInput Company 23.12
isTenantOwned ApiEntityExternallySourcedCompanyInput Company 23.12
link ApiEntityExternallySourcedCompanyInput Company 23.11
offices ApiEntityExternallySourcedCompanyInput Company 23.12
updateDate ApiEntityExternallySourcedCompanyInput Company 23.11
workspaceCode ApiEntityExternallySourcedCompanyInput Company 23.12
workspaceId ApiEntityExternallySourcedCompanyInput Company 23.12
associationType ApiEntityColumnDefinitionInput Configured Fields 24.3
link ApiEntityColumnDefinitionInput Configured Fields 23.11
updateDate ApiEntityColumnDefinitionInput Configured Fields 23.11
link ApiEntityColumnDefinitionLocalizationInput Configured Fields 23.11
updateDate ApiEntityColumnDefinitionLocalizationInput Configured Fields 23.11
link ApiEntityFlexListValueInput Configured Fields 23.11
updateDate ApiEntityFlexListValueInput Configured Fields 23.11
link ApiEntityListValueNMInput Configured Fields 23.11
updateDate ApiEntityListValueNMInput Configured Fields 23.11
codeTypeName ApiEntityCodeValueConstraintInput Constraint 23.11
link ApiEntityCodeValueConstraintInput Constraint 23.11
sequenceNumber ApiEntityCodeValueConstraintInput Constraint 23.11
updateDate ApiEntityCodeValueConstraintInput Constraint 23.11
costValue ApiEntityConstraintConfiguredFieldValueInput Constraint 23.11
costValueWorkspace1 ApiEntityConstraintConfiguredFieldValueInput Constraint 23.11
costValueWorkspace2 ApiEntityConstraintConfiguredFieldValueInput Constraint 23.11
costValueWorkspace3 ApiEntityConstraintConfiguredFieldValueInput Constraint 23.11
exceptionMessage ApiEntityConstraintConfiguredFieldValueInput Constraint 23.11
hasException ApiEntityConstraintConfiguredFieldValueInput Constraint 23.11
link ApiEntityConstraintConfiguredFieldValueInput Constraint 23.11
updateDate ApiEntityConstraintConfiguredFieldValueInput Constraint 23.11
link ApiEntityConstraintInput Constraint 23.12
status ApiEntityConstraintInput Constraint 23.12
updateDate ApiEntityConstraintInput Constraint 23.12
link ApiEntityTaskConstraintInput Constraint 23.11
updateDate ApiEntityTaskConstraintInput Constraint 23.11
associationType ApiEntityCostCategoryInput Cost Category 24.5
link ApiEntityCostCategoryInput Cost Category 23.11
updateDate ApiEntityCostCategoryInput Cost Category 24.5
associationType ApiEntityCurrencyInput Currency 24.4
link ApiEntityCurrencyInput Currency 23.11
updateDate ApiEntityCurrencyInput Currency 24.4
link ApiEntityCurrencySeed Currency 24.4
updateDate ApiEntityCurrencySeed Curve 24.4
link ApiEntityCurveBucketInput Curve 24.5
updateDate ApiEntityCurveBucketInput Curve 24.5
associationType ApiEntityCurveInput Curve 24.5
link ApiEntityCurveInput Curve 24.5
updateDate ApiEntityCurveInput Curve 24.5
codeTypeName ApiEntityCodeValueCustomLogInput Custom Log Item 23.11
link ApiEntityCodeValueCustomLogInput Custom Log Item 23.11
sequenceNumber ApiEntityCodeValueCustomLogInput Custom Log Item 23.11
updateDate ApiEntityCodeValueCustomLogInput Custom Log Item 23.11
costValue ApiEntityCustomLogItemConfiguredFieldValueInput Custom Log Item 23.11
costValueWorkspace1 ApiEntityCustomLogItemConfiguredFieldValueInput Custom Log Item 23.11
costValueWorkspace2 ApiEntityCustomLogItemConfiguredFieldValueInput Custom Log Item 23.11
costValueWorkspace3 ApiEntityCustomLogItemConfiguredFieldValueInput Custom Log Item 23.11
exceptionMessage ApiEntityCustomLogItemConfiguredFieldValueInput Custom Log Item 23.11
hasException ApiEntityCustomLogItemConfiguredFieldValueInput Custom Log Item 23.11
link ApiEntityCustomLogItemConfiguredFieldValueInput Custom Log Item 23.11
updateDate ApiEntityCustomLogItemConfiguredFieldValueInput Custom Log Item 23.11
link ApiEntityCustomLogItemInput Custom Log Item 23.11
postedDate ApiEntityCustomLogItemInput Custom Log Item 23.12
updateDate ApiEntityCustomLogItemInput Custom Log Item 23.11
link ApiEntityCustomLogEntityTypeInput Custom Log Type Object 23.11
updateDate ApiEntityCustomLogEntityTypeInput Custom Log Type Object 23.11
link ApiEntityCustomLogTypeCodeTypeInput Custom Log Type Object 23.11
updateDate ApiEntityCustomLogTypeCodeTypeInput Custom Log Type Object 23.11
assignedWorkspaceCode ApiEntityCustomLogTypeObjectInput Custom Log Type Object 23.12
assignedWorkspaceId ApiEntityCustomLogTypeObjectInput Custom Log Type Object 23.12
associationType ApiEntityCustomLogTypeObjectInput Custom Log Type Object 23.12
link ApiEntityCustomLogTypeObjectInput Custom Log Type Object 23.11
ownershipType ApiEntityCustomLogTypeObjectInput Custom Log Type Object 23.12
securityGuid ApiEntityCustomLogTypeObjectInput Custom Log Type Object 23.12
sequenceNumber ApiEntityCustomLogTypeObjectInput Custom Log Type Object 23.12
updateDate ApiEntityCustomLogTypeObjectInput Custom Log Type Object 23.12
link ApiEntityCustomLogUdfInput Custom Log Type Object 23.11
updateDate ApiEntityCustomLogUdfInput Custom Log Type Object 23.11
codeTypeName ApiEntityCodeValueDocumentInput Document 23.11
createDate ApiEntityCodeValueDocumentInput Document 23.11
createUser ApiEntityCodeValueDocumentInput Document 23.11
link ApiEntityCodeValueDocumentInput Document 23.11
sequenceNumber ApiEntityCodeValueDocumentInput Document 23.11
updateDate ApiEntityCodeValueDocumentInput Document 23.11
updateUser ApiEntityCodeValueDocumentInput Document 23.11
costValue ApiEntityDocumentConfiguredFieldValueInput Document 23.11
costValueWorkspace1 ApiEntityDocumentConfiguredFieldValueInput Document 23.11
costValueWorkspace2 ApiEntityDocumentConfiguredFieldValueInput Document 23.11
costValueWorkspace3 ApiEntityDocumentConfiguredFieldValueInput Document 23.11
createDate ApiEntityDocumentConfiguredFieldValueInput Document 23.11
createUser ApiEntityDocumentConfiguredFieldValueInput Document 23.11
link ApiEntityDocumentConfiguredFieldValueInput Document 23.11
updateDate ApiEntityDocumentConfiguredFieldValueInput Document 23.11
updateUser ApiEntityDocumentConfiguredFieldValueInput Document 23.11
annotationCount ApiEntityDocumentInput Document 23.11
author ApiEntityDocumentInput Document 23.11
checkedOut ApiEntityDocumentInput Document 23.11
checkedOutBy ApiEntityDocumentInput Document 23.11
checkedOutDate ApiEntityDocumentInput Document 23.11
checkedOutUserId ApiEntityDocumentInput Document 23.11
createDate ApiEntityDocumentInput Document 23.11
createUser ApiEntityDocumentInput Document 23.11
hasChildren ApiEntityDocumentInput Document 23.11
isActualRoot ApiEntityDocumentInput Document 23.11
link ApiEntityDocumentInput Document 23.11
mimeType ApiEntityDocumentInput Document 23.11
parentType ApiEntityDocumentInput Document 23.11
scanStatus ApiEntityDocumentInput Document 23.11
size ApiEntityDocumentInput Document 23.11
type ApiEntityDocumentInput Document 23.11
updateDate ApiEntityDocumentInput Document 23.11
updateUser ApiEntityDocumentInput Document 23.11
url ApiEntityDocumentInput Document 23.11
version ApiEntityDocumentInput Document 23.11
associationType ApiEntityDocumentFolderStructureTemplateInput Document Folder Structure Template 24.4
link ApiEntityDocumentFolderStructureTemplateInput Document Folder Structure Template 24.4
pushDownType ApiEntityDocumentFolderStructureTemplateInput Document Folder Structure Template 24.4
systemGenerated ApiEntityDocumentFolderStructureTemplateInput Document Folder Structure Template 24.4
updateDate ApiEntityDocumentFolderStructureTemplateInput Document Folder Structure Template 24.4
link ApiEntityEvaluationRankInput Evaluation Categories 23.11
updateDate ApiEntityEvaluationRankInput Evaluation Categories 23.11
link ApiEntityExchangeRateInput Exchange Rate 23.11
updateDate ApiEntityExchangeRateInput Exchange Rate 23.11
fund ApiEntityFundAllocationSpreadRowInput Fund 23.12
costValue ApiEntityFundConfiguredFieldValueInput Fund 23.12
costValueWorkspace1 ApiEntityFundConfiguredFieldValueInput Fund 23.12
costValueWorkspace2 ApiEntityFundConfiguredFieldValueInput Fund 23.12
costValueWorkspace3 ApiEntityFundConfiguredFieldValueInput Fund 23.12
exceptionMessage ApiEntityFundConfiguredFieldValueInput Fund 23.12
hasException ApiEntityFundConfiguredFieldValueInput Fund 23.12
link ApiEntityFundConfiguredFieldValueInput Fund 23.12
updateDate ApiEntityFundConfiguredFieldValueInput Fund 23.12
assignedCost ApiEntityFundActualCostInput Fund Actual 24.5
assignedCostWorkspace1 ApiEntityFundActualCostInput Fund Actual 24.5
assignedCostWorkspace2 ApiEntityFundActualCostInput Fund Actual 24.5
assignedCostWorkspace3 ApiEntityFundActualCostInput Fund Actual 24.5
link ApiEntityFundActualCostInput Fund Actual 24.5
updateDate ApiEntityFundActualCostInput Fund Actual 24.5
link ApiEntityFundActualInput Fund Actual 24.5
updateDate ApiEntityFundActualInput Fund Actual 24.5
codeTypeName ApiEntityCodeValueFundInput Funds 23.11
link ApiEntityCodeValueFundInput Funds 23.11
sequenceNumber ApiEntityCodeValueFundInput Funds 23.11
updateDate ApiEntityCodeValueFundInput Funds 23.11
link ApiEntityHolidayGroupInput Holiday List 24.4
updateDate ApiEntityHolidayGroupInput Holiday List 24.4
holidayGroupName ApiEntityHolidayInput Holiday List 24.4
link ApiEntityHolidayInput Holiday List 24.4
updateDate ApiEntityHolidayInput Holiday List 24.4
workspaceCode ApiEntityHolidayInput Holiday List 24.4
codeTypeName ApiEntityCodeValueIdeaInput Idea 23.11
link ApiEntityCodeValueIdeaInput Idea 24.5
sequenceNumber ApiEntityCodeValueIdeaInput Idea 23.11
updateDate ApiEntityCodeValueIdeaInput Idea 24.5
costValue ApiEntityIdeaConfiguredFieldValueInput Idea 23.11
costValueWorkspace1 ApiEntityIdeaConfiguredFieldValueInput Idea 23.11
costValueWorkspace2 ApiEntityIdeaConfiguredFieldValueInput Idea 23.11
costValueWorkspace3 ApiEntityIdeaConfiguredFieldValueInput Idea 23.11
link ApiEntityIdeaConfiguredFieldValueInput Idea 24.5
updateDate ApiEntityIdeaConfiguredFieldValueInput Idea 24.5
createDate ApiEntityIdeaInput Idea 24.5
createUser ApiEntityIdeaInput Idea 24.5
link ApiEntityIdeaInput Idea 24.5
statusDate ApiEntityIdeaInput Idea 24.5
submitDate ApiEntityIdeaInput Idea 24.5
submitUser ApiEntityIdeaInput Idea 24.5
updateDate ApiEntityIdeaInput Idea 24.5
updateUser ApiEntityIdeaInput Idea 24.5
link ApiEntityIdeaProfileInput Idea 23.1
updateDate ApiEntityIdeaProfileInput Idea 23.1
link ApiEntityIdeaUserPermissions Idea 23.1
updateDate ApiEntityIdeaUserPermissions Idea 23.1
link ApiEntityIdeaUserPermissionsResponse Idea 23.1
updateDate ApiEntityIdeaUserPermissionsResponse Idea 23.1
associationType ApiEntityLocationInput Location 24.4
link ApiEntityLocationInput Location 24.4
updateDate ApiEntityLocationInput Location 24.4
associationType ApiEntityMeasureInput Measure 23.11
link ApiEntityMeasureInput Measure 23.11
updateDate ApiEntityMeasureInput Measure 23.11
link ApiEntityMeasureThresholdInput Measure Threshold 23.11
updateDate ApiEntityMeasureThresholdInput Measure Threshold 23.11
link ApiEntityMeasureThresholdItemInput Measure Threshold 23.11
updateDate ApiEntityMeasureThresholdItemInput Measure Threshold 23.11
impactingRisks risksImpactingProject ApiEntityMonteCarloProjectIterationValue Monte Carlo Project Iteration Values 24.3
samplingShape ApiEntityMonteCarloRunSettings Monte Carlo Run Settings 23.1
runMeanImpacted ApiEntityMonteCarloSettings Monte Carlo Settings 23.1
samplingShape ApiEntityMonteCarloSettings Monte Carlo Settings 23.1
link ApiEntityMonteCarloSettingsInput Monte Carlo Settings 23.1
runMeanImpacted ApiEntityMonteCarloSettingsInput Monte Carlo Settings 23.1
samplingShape ApiEntityMonteCarloSettingsInput Monte Carlo Settings 23.1
updateDate ApiEntityMonteCarloSettingsInput Monte Carlo Settings 23.1
link ApiEntityPBSInput PBS 24.5
updateDate ApiEntityPBSInput PBS 24.5
codeTypeName ApiEntityCodeValuePortfolioInput Portfolio 23.11
link ApiEntityCodeValuePortfolioInput Portfolio 23.11
sequenceNumber ApiEntityCodeValuePortfolioInput Portfolio 23.11
updateDate ApiEntityCodeValuePortfolioInput Portfolio 23.11
costValue ApiEntityPortfolioConfiguredFieldValueInput Portfolio 23.11
costValueWorkspace1 ApiEntityPortfolioConfiguredFieldValueInput Portfolio 23.11
costValueWorkspace2 ApiEntityPortfolioConfiguredFieldValueInput Portfolio 23.11
costValueWorkspace3 ApiEntityPortfolioConfiguredFieldValueInput Portfolio 23.11
exceptionMessage ApiEntityPortfolioConfiguredFieldValueInput Portfolio 23.11
hasException ApiEntityPortfolioConfiguredFieldValueInput Portfolio 23.11
link ApiEntityPortfolioConfiguredFieldValueInput Portfolio 23.11
updateDate ApiEntityPortfolioConfiguredFieldValueInput Portfolio 23.11
lastRefreshDate ApiEntityPortfolioInput Portfolio 23.12
link ApiEntityPortfolioInput Portfolio 23.11
projects ApiEntityPortfolioInput Portfolio 23.12
securityGuid ApiEntityPortfolioInput Portfolio 23.12
updateDate ApiEntityPortfolioInput Portfolio 23.11
link ApiEntityPortfolioProfileInput Portfolio 23.1
updateDate ApiEntityPortfolioProfileInput Portfolio 23.1
action ApiEntityPortfolioProgram Portfolio 23.12
link ApiEntityPortfolioProgramInput Portfolio 23.11
updateDate ApiEntityPortfolioProgramInput Portfolio 23.11
link ApiEntityPortfolioProjectInput Portfolio 23.11
updateDate ApiEntityPortfolioProjectInput Portfolio 23.11
link ApiEntityPortfolioUserPermissions Portfolio 23.1
updateDate ApiEntityPortfolioUserPermissions Portfolio 23.1
link ApiEntityPortfolioUserPermissionsResponse Portfolio 23.1
updateDate ApiEntityPortfolioUserPermissionsResponse Portfolio 23.1
link ApiEntityPortfolioMeasureInput Portfolio Measure 24.5
updateDate ApiEntityPortfolioMeasureInput Portfolio Measure 24.5
link ApiEntityPortfolioMeasureManualValueInput Portfolio Measure Manual Value 24.5
updateDate ApiEntityPortfolioMeasureManualValueInput Portfolio Measure Manual Value 24.5
link ApiEntityCodeValueProgramInput Program 23.11
updateDate ApiEntityCodeValueProgramInput Program 23.11
costValue ApiEntityProgramConfiguredFieldValueInput Program 23.11
costValueWorkspace1 ApiEntityProgramConfiguredFieldValueInput Program 23.11
costValueWorkspace2 ApiEntityProgramConfiguredFieldValueInput Program 23.11
costValueWorkspace3 ApiEntityProgramConfiguredFieldValueInput Program 23.11
exceptionMessage ApiEntityProgramConfiguredFieldValueInput Program 23.11
hasException ApiEntityProgramConfiguredFieldValueInput Program 23.11
link ApiEntityProgramConfiguredFieldValueInput Program 23.11
updateDate ApiEntityProgramConfiguredFieldValueInput Program 23.11
link ApiEntityProgramFilterInput Program 23.11
updateDate ApiEntityProgramFilterInput Program 23.11
benefitsOutOfSync ApiEntityProgramFinancialInput Program 23.11
forecastOutOfSync ApiEntityProgramFinancialInput Program 23.11
link ApiEntityProgramFinancialInput Program 23.11
plannedBudgetOutOfSync ApiEntityProgramFinancialInput Program 23.11
spendsOutOfSync ApiEntityProgramFinancialInput Program 23.11
updateDate ApiEntityProgramFinancialInput Program 23.11
link ApiEntityProgramInput Program 23.11
updateDate ApiEntityProgramInput Program 23.11
link ApiEntityProgramLinkedObjectInput Program 23.11
updateDate ApiEntityProgramLinkedObjectInput Program 23.11
link ApiEntityProgramPhaseFinancialInput Program 23.11
updateDate ApiEntityProgramPhaseFinancialInput Program 23.11
link ApiEntityProgramProfileInput Program 23.1
updateDate ApiEntityProgramProfileInput Program 23.1
link ApiEntityProgramSettingInput Program 23.11
updateDate ApiEntityProgramSettingInput Program 23.11
link ApiEntityProgramUserPermissions Program 23.1
updateDate ApiEntityProgramUserPermissions Program 23.1
link ApiEntityProgramUserPermissionsResponse Program 23.1
updateDate ApiEntityProgramUserPermissionsResponse Program 23.1
approveByUserId ApiEntityProgramBudgetInput Program Budget 23.11
approveByUserName ApiEntityProgramBudgetInput Program Budget 23.11
approveDate ApiEntityProgramBudgetInput Program Budget 23.11
budgetStatus ApiEntityProgramBudgetInput Program Budget 23.11
lastModifiedById ApiEntityProgramBudgetInput Program Budget 23.11
link ApiEntityProgramBudgetInput Program Budget 23.11
programBudgetId ApiEntityProgramBudgetInput Program Budget 23.11
rejectByUserId ApiEntityProgramBudgetInput Program Budget 23.11
rejectByUserName ApiEntityProgramBudgetInput Program Budget 23.11
rejectDate ApiEntityProgramBudgetInput Program Budget 23.11
submitByUserId ApiEntityProgramBudgetInput Program Budget 23.11
submitByUserName ApiEntityProgramBudgetInput Program Budget 23.11
submitDate ApiEntityProgramBudgetInput Program Budget 23.11
updateDate ApiEntityProgramBudgetInput Program Budget 23.11
withdrawApprovalByUserId ApiEntityProgramBudgetInput Program Budget 23.11
withdrawApprovalByUserName ApiEntityProgramBudgetInput Program Budget 23.11
withdrawApprovalDate ApiEntityProgramBudgetInput Program Budget 23.11
costValue ApiEntityProgramBudgetChangeConfiguredFieldValueInput Program Budget Change 23.11
costValueWorkspace1 ApiEntityProgramBudgetChangeConfiguredFieldValueInput Program Budget Change 23.11
costValueWorkspace2 ApiEntityProgramBudgetChangeConfiguredFieldValueInput Program Budget Change 23.11
costValueWorkspace3 ApiEntityProgramBudgetChangeConfiguredFieldValueInput Program Budget Change 23.11
exceptionMessage ApiEntityProgramBudgetChangeConfiguredFieldValueInput Program Budget Change 23.11
hasException ApiEntityProgramBudgetChangeConfiguredFieldValueInput Program Budget Change 23.11
link ApiEntityProgramBudgetChangeConfiguredFieldValueInput Program Budget Change 23.11
programBudgetChangeId ApiEntityProgramBudgetChangeConfiguredFieldValueInput Program Budget Change 23.11
updateDate ApiEntityProgramBudgetChangeConfiguredFieldValueInput Program Budget Change 23.11
costValue ApiEntityProgramBudgetTransactionConfiguredFieldValueInput Program Budget Change, Program Budget Transfer 23.11
costValueWorkspace1 ApiEntityProgramBudgetTransactionConfiguredFieldValueInput Program Budget Change, Program Budget Transfer 23.11
costValueWorkspace2 ApiEntityProgramBudgetTransactionConfiguredFieldValueInput Program Budget Change, Program Budget Transfer 23.11
costValueWorkspace3 ApiEntityProgramBudgetTransactionConfiguredFieldValueInput Program Budget Change, Program Budget Transfer 23.11
exceptionMessage ApiEntityProgramBudgetTransactionConfiguredFieldValueInput Program Budget Change, Program Budget Transfer 23.11
hasException ApiEntityProgramBudgetTransactionConfiguredFieldValueInput Program Budget Change, Program Budget Transfer 23.11
link ApiEntityProgramBudgetTransactionConfiguredFieldValueInput Program Budget Change, Program Budget Transfer 23.11
programBudgetTransactionId ApiEntityProgramBudgetTransactionConfiguredFieldValueInput Program Budget Change, Program Budget Transfer 23.11
updateDate ApiEntityProgramBudgetTransactionConfiguredFieldValueInput Program Budget Change, Program Budget Transfer 23.11
costValue ApiEntityProgramBudgetItemConfiguredFieldValueInput Program Budget Item 23.11
costValueWorkspace1 ApiEntityProgramBudgetItemConfiguredFieldValueInput Program Budget Item 23.11
costValueWorkspace2 ApiEntityProgramBudgetItemConfiguredFieldValueInput Program Budget Item 23.11
costValueWorkspace3 ApiEntityProgramBudgetItemConfiguredFieldValueInput Program Budget Item 23.11
exceptionMessage ApiEntityProgramBudgetItemConfiguredFieldValueInput Program Budget Item 23.11
hasException ApiEntityProgramBudgetItemConfiguredFieldValueInput Program Budget Item 23.11
link ApiEntityProgramBudgetItemConfiguredFieldValueInput Program Budget Item 23.11
programBudgetItemId ApiEntityProgramBudgetItemConfiguredFieldValueInput Program Budget Item 23.11
updateDate ApiEntityProgramBudgetItemConfiguredFieldValueInput Program Budget Item 23.11
costValue ApiEntityProgramBudgetTransferConfiguredFieldValueInput Program Budget Transfer 23.11
costValueWorkspace1 ApiEntityProgramBudgetTransferConfiguredFieldValueInput Program Budget Transfer 23.11
costValueWorkspace2 ApiEntityProgramBudgetTransferConfiguredFieldValueInput Program Budget Transfer 23.11
costValueWorkspace3 ApiEntityProgramBudgetTransferConfiguredFieldValueInput Program Budget Transfer 23.11
exceptionMessage ApiEntityProgramBudgetTransferConfiguredFieldValueInput Program Budget Transfer 23.11
hasException ApiEntityProgramBudgetTransferConfiguredFieldValueInput Program Budget Transfer 23.11
link ApiEntityProgramBudgetTransferConfiguredFieldValueInput Program Budget Transfer 23.11
programBudgetTransferId ApiEntityProgramBudgetTransferConfiguredFieldValueInput Program Budget Transfer 23.11
updateDate ApiEntityProgramBudgetTransferConfiguredFieldValueInput Program Budget Transfer 23.11
programBudgetItemName ApiEntityProgramBudgetTransferTransactionInput Program Budget Transfer 23.11
transferFromCBSId ApiEntityProgramBudgetTransferTransactionInput Program Budget Transfer 23.11
transferFromCostCategoryId ApiEntityProgramBudgetTransferTransactionInput Program Budget Transfer 23.11
transferToCBSId ApiEntityProgramBudgetTransferTransactionInput Program Budget Transfer 23.11
transferToCostCategoryId ApiEntityProgramBudgetTransferTransactionInput Program Budget Transfer 23.11
codeTypeName ApiEntityCodeValueProgramRiskInput Program Risk 23.11
link ApiEntityCodeValueProgramRiskInput Program Risk 23.11
sequenceNumber ApiEntityCodeValueProgramRiskInput Program Risk 23.11
updateDate ApiEntityCodeValueProgramRiskInput Program Risk 23.11
costValue ApiEntityProgramRiskConfiguredFieldValueInput Program Risk 23.11
costValueWorkspace1 ApiEntityProgramRiskConfiguredFieldValueInput Program Risk 23.11
costValueWorkspace2 ApiEntityProgramRiskConfiguredFieldValueInput Program Risk 23.11
costValueWorkspace3 ApiEntityProgramRiskConfiguredFieldValueInput Program Risk 23.11
exceptionMessage ApiEntityProgramRiskConfiguredFieldValueInput Program Risk 23.11
hasException ApiEntityProgramRiskConfiguredFieldValueInput Program Risk 23.11
link ApiEntityProgramRiskConfiguredFieldValueInput Program Risk 23.11
updateDate ApiEntityProgramRiskConfiguredFieldValueInput Program Risk 23.11
actualResponseCost ApiEntityProgramRiskFinancialInput Program Risk 23.11
actualResponseCostProject ApiEntityProgramRiskFinancialInput Program Risk 23.11
atCompletionTotalResponseCost ApiEntityProgramRiskFinancialInput Program Risk 23.11
link ApiEntityProgramRiskFinancialInput Program Risk 23.11
postActualResponseCost ApiEntityProgramRiskFinancialInput Program Risk 23.11
postAtCompletionTotalResponseCost ApiEntityProgramRiskFinancialInput Program Risk 23.11
postExposureCost ApiEntityProgramRiskFinancialInput Program Risk 23.11
postExposureCostProject ApiEntityProgramRiskFinancialInput Program Risk 23.11
postQuantifiedCostThreshold ApiEntityProgramRiskFinancialInput Program Risk 23.11
postRemainingTotalResponseCost ApiEntityProgramRiskFinancialInput Program Risk 23.11
postResponseExposureWorkspace1 ApiEntityProgramRiskFinancialInput Program Risk 23.11
postResponseExposureWorkspace2 ApiEntityProgramRiskFinancialInput Program Risk 23.11
postResponseExposureWorkspace3 ApiEntityProgramRiskFinancialInput Program Risk 23.11
preActualResponseCost ApiEntityProgramRiskFinancialInput Program Risk 23.11
preAtCompletionTotalResponseCost ApiEntityProgramRiskFinancialInput Program Risk 23.11
preExposureCost ApiEntityProgramRiskFinancialInput Program Risk 23.11
preExposureCostProject ApiEntityProgramRiskFinancialInput Program Risk 23.11
preQuantifiedCostThreshold ApiEntityProgramRiskFinancialInput Program Risk 23.11
preRemainingTotalResponseCost ApiEntityProgramRiskFinancialInput Program Risk 23.11
preResponseExposureWorkspace1 ApiEntityProgramRiskFinancialInput Program Risk 23.11
preResponseExposureWorkspace2 ApiEntityProgramRiskFinancialInput Program Risk 23.11
preResponseExposureWorkspace3 ApiEntityProgramRiskFinancialInput Program Risk 23.11
remainingTotalResponseCost ApiEntityProgramRiskFinancialInput Program Risk 23.11
updateDate ApiEntityProgramRiskFinancialInput Program Risk 23.11
link ApiEntityProgramRiskImpactInput Program Risk 23.11
riskCode ApiEntityProgramRiskImpactInput Program Risk 23.11
updateDate ApiEntityProgramRiskImpactInput Program Risk 23.11
workspaceCode ApiEntityProgramRiskImpactInput Program Risk 23.11
link ApiEntityProgramRiskInput Program Risk 23.11
postResponseMeanDelay ApiEntityProgramRiskInput Program Risk 23.11
postScore ApiEntityProgramRiskInput Program Risk 23.11
preResponseMeanDelay ApiEntityProgramRiskInput Program Risk 23.11
quantifiedPostResponseProbabilityThreshold ApiEntityProgramRiskInput Program Risk 23.11
quantifiedPostResponseScheduleThreshold ApiEntityProgramRiskInput Program Risk 23.11
quantifiedProbabilityThreshold ApiEntityProgramRiskInput Program Risk 23.11
quantifiedScheduleThreshold ApiEntityProgramRiskInput Program Risk 23.11
riskSourceType ApiEntityProgramRiskInput Program Risk 23.11
score ApiEntityProgramRiskInput Program Risk 23.11
updateDate ApiEntityProgramRiskInput Program Risk 23.11
link ApiEntityProgramRiskQuantifiedCostImpactInput Program Risk 23.11
postResponseMaximumProject ApiEntityProgramRiskQuantifiedCostImpactInput Program Risk 23.11
postResponseMaximumWorkspace1 ApiEntityProgramRiskQuantifiedCostImpactInput Program Risk 23.11
postResponseMaximumWorkspace2 ApiEntityProgramRiskQuantifiedCostImpactInput Program Risk 23.11
postResponseMaximumWorkspace3 ApiEntityProgramRiskQuantifiedCostImpactInput Program Risk 23.11
postResponseMinimumProject ApiEntityProgramRiskQuantifiedCostImpactInput Program Risk 23.11
postResponseMinimumWorkspace1 ApiEntityProgramRiskQuantifiedCostImpactInput Program Risk 23.11
postResponseMinimumWorkspace2 ApiEntityProgramRiskQuantifiedCostImpactInput Program Risk 23.11
postResponseMinimumWorkspace3 ApiEntityProgramRiskQuantifiedCostImpactInput Program Risk 23.11
postResponseMostLikelyProject ApiEntityProgramRiskQuantifiedCostImpactInput Program Risk 23.11
postResponseMostLikelyWorkspace1 ApiEntityProgramRiskQuantifiedCostImpactInput Program Risk 23.11
postResponseMostLikelyWorkspace2 ApiEntityProgramRiskQuantifiedCostImpactInput Program Risk 23.11
postResponseMostLikelyWorkspace3 ApiEntityProgramRiskQuantifiedCostImpactInput Program Risk 23.11
preResponseMaximumProject ApiEntityProgramRiskQuantifiedCostImpactInput Program Risk 23.11
preResponseMaximumWorkspace1 ApiEntityProgramRiskQuantifiedCostImpactInput Program Risk 23.11
preResponseMaximumWorkspace2 ApiEntityProgramRiskQuantifiedCostImpactInput Program Risk 23.11
preResponseMaximumWorkspace3 ApiEntityProgramRiskQuantifiedCostImpactInput Program Risk 23.11
preResponseMinimumProject ApiEntityProgramRiskQuantifiedCostImpactInput Program Risk 23.11
preResponseMinimumWorkspace1 ApiEntityProgramRiskQuantifiedCostImpactInput Program Risk 23.11
preResponseMinimumWorkspace2 ApiEntityProgramRiskQuantifiedCostImpactInput Program Risk 23.11
preResponseMinimumWorkspace3 ApiEntityProgramRiskQuantifiedCostImpactInput Program Risk 23.11
preResponseMostLikelyProject ApiEntityProgramRiskQuantifiedCostImpactInput Program Risk 23.11
preResponseMostLikelyWorkspace1 ApiEntityProgramRiskQuantifiedCostImpactInput Program Risk 23.11
preResponseMostLikelyWorkspace2 ApiEntityProgramRiskQuantifiedCostImpactInput Program Risk 23.11
preResponseMostLikelyWorkspace3 ApiEntityProgramRiskQuantifiedCostImpactInput Program Risk 23.11
updateDate ApiEntityProgramRiskQuantifiedCostImpactInput Program Risk 23.11
link ApiEntityProgramRiskQuantifiedOtherImpactInput Program Risk 23.11
updateDate ApiEntityProgramRiskQuantifiedOtherImpactInput Program Risk 23.11
atCompletionTotalCost ApiEntityProgramRiskMitigationFinancialInput Program Risk Mitigation 23.11
link ApiEntityProgramRiskMitigationFinancialInput Program Risk Mitigation 23.11
postResponseActualCost ApiEntityProgramRiskMitigationFinancialInput Program Risk Mitigation 23.11
postResponseAtCompletionTotalCost ApiEntityProgramRiskMitigationFinancialInput Program Risk Mitigation 23.11
postResponseRemainingTotalCost ApiEntityProgramRiskMitigationFinancialInput Program Risk Mitigation 23.11
preResponseActualCost ApiEntityProgramRiskMitigationFinancialInput Program Risk Mitigation 23.11
preResponseAtCompletionCost ApiEntityProgramRiskMitigationFinancialInput Program Risk Mitigation 23.11
preResponseRemainingTotalCost ApiEntityProgramRiskMitigationFinancialInput Program Risk Mitigation 23.11
updateDate ApiEntityProgramRiskMitigationFinancialInput Program Risk Mitigation 23.11
link ApiEntityProgramRiskMitigationInput Program Risk Mitigation 23.11
updateDate ApiEntityProgramRiskMitigationInput Program Risk Mitigation 23.11
link ApiEntityProgramRiskWeatherPeriodInput Program Risk Weather Period 24.4
updateDate ApiEntityProgramRiskWeatherPeriodInput Program Risk Weather Period 24.4
codeTypeName ApiEntityCodeValueProjectInput Project 23.11
link ApiEntityCodeValueProjectInput Project 23.11
sequenceNumber ApiEntityCodeValueProjectInput Project 23.11
updateDate ApiEntityCodeValueProjectInput Project 23.11
actualDuration ApiEntityExternallySourcedProjectInput Project 23.12
currentApprovedFinishDate ApiEntityExternallySourcedProjectInput Project 23.12
currentApprovedStartDate ApiEntityExternallySourcedProjectInput Project 23.12
danglingFinishActivityCount ApiEntityExternallySourcedProjectInput Project 23.12
danglingFinishActivityPercent ApiEntityExternallySourcedProjectInput Project 23.12
danglingStartActivityCount ApiEntityExternallySourcedProjectInput Project 23.12
danglingStartActivityPercent ApiEntityExternallySourcedProjectInput Project 23.12
evaluationMatrixId ApiEntityExternallySourcedProjectInput Project 23.12
evaluationScore ApiEntityExternallySourcedProjectInput Project 23.12
ffPredecessorActivityCount ApiEntityExternallySourcedProjectInput Project 23.12
ffPredecessorActivityPercent ApiEntityExternallySourcedProjectInput Project 23.12
finishDateVariance ApiEntityExternallySourcedProjectInput Project 23.12
fsPredecessorActivityCount ApiEntityExternallySourcedProjectInput Project 23.12
fsPredecessorActivityPercent ApiEntityExternallySourcedProjectInput Project 23.12
hardConstraintActivityCount ApiEntityExternallySourcedProjectInput Project 23.12
hardConstraintActivityPercent ApiEntityExternallySourcedProjectInput Project 23.12
image ApiEntityExternallySourcedProjectInput Project 23.12
invalidProgressDateActivityCount ApiEntityExternallySourcedProjectInput Project 23.12
invalidProgressDateActivityPercent ApiEntityExternallySourcedProjectInput Project 23.12
largeDurationActivityCount ApiEntityExternallySourcedProjectInput Project 23.12
largeDurationActivityPercent ApiEntityExternallySourcedProjectInput Project 23.12
largeFloatActivityCount ApiEntityExternallySourcedProjectInput Project 23.12
largeFloatActivityPercent ApiEntityExternallySourcedProjectInput Project 23.12
lastProjectEvaluationDate ApiEntityExternallySourcedProjectInput Project 23.12
lateActivityCount ApiEntityExternallySourcedProjectInput Project 23.12
lateActivityPercent ApiEntityExternallySourcedProjectInput Project 23.12
link ApiEntityExternallySourcedProjectInput Project 23.11
linkPlannedBudgetTo ApiEntityExternallySourcedProjectInput Project 23.12
negativeFloatActivityCount ApiEntityExternallySourcedProjectInput Project 23.12
negativeFloatActivityPercent ApiEntityExternallySourcedProjectInput Project 23.12
noPredecessorActivityCount ApiEntityExternallySourcedProjectInput Project 23.12
noPredecessorActivityPercent ApiEntityExternallySourcedProjectInput Project 23.12
noResourceActivityCount ApiEntityExternallySourcedProjectInput Project 23.12
noResourceActivityPercent ApiEntityExternallySourcedProjectInput Project 23.12
noSuccessorActivityCount ApiEntityExternallySourcedProjectInput Project 23.12
noSuccessorActivityPercent ApiEntityExternallySourcedProjectInput Project 23.12
openEndsActivityCount ApiEntityExternallySourcedProjectInput Project 23.12
openEndsActivityPercent ApiEntityExternallySourcedProjectInput Project 23.12
parentProject ApiEntityExternallySourcedProjectInput Project 23.12
percentCompleteWeightedBy ApiEntityExternallySourcedProjectInput Project 23.12
planDuration ApiEntityExternallySourcedProjectInput Project 23.12
predecessorLagActivityCount ApiEntityExternallySourcedProjectInput Project 23.12
predecessorLagActivityPercent ApiEntityExternallySourcedProjectInput Project 23.12
predecessorNegativeLagActivityCount ApiEntityExternallySourcedProjectInput Project 23.12
predecessorNegativeLagActivityPercent ApiEntityExternallySourcedProjectInput Project 23.12
projectAutoNumber ApiEntityExternallySourcedProjectInput Project 23.12
projectScheduleHealthPercent ApiEntityExternallySourcedProjectInput Project 23.12
projectTerm ApiEntityExternallySourcedProjectInput Project 23.12
proposedFinishDate ApiEntityExternallySourcedProjectInput Project 23.12
proposedStartDate ApiEntityExternallySourcedProjectInput Project 23.12
recordCount ApiEntityExternallySourcedProjectInput Project 23.12
remainingDuration ApiEntityExternallySourcedProjectInput Project 23.12
remainingFinishDate ApiEntityExternallySourcedProjectInput Project 23.12
remainingStartDate ApiEntityExternallySourcedProjectInput Project 23.12
reportCycleNamingBoundary ApiEntityExternallySourcedProjectInput Project 23.12
scheduledFinishDate ApiEntityExternallySourcedProjectInput Project 23.12
securityGuid ApiEntityExternallySourcedProjectInput Project 23.12
sfPredecessorActivityCount ApiEntityExternallySourcedProjectInput Project 23.12
sfPredecessorActivityPercent ApiEntityExternallySourcedProjectInput Project 23.12
softConstraintActivityCount ApiEntityExternallySourcedProjectInput Project 23.12
softConstraintActivityPercent ApiEntityExternallySourcedProjectInput Project 23.12
ssPredecessorActivityCount ApiEntityExternallySourcedProjectInput Project 23.12
ssPredecessorActivityPercent ApiEntityExternallySourcedProjectInput Project 23.12
startDateVariance ApiEntityExternallySourcedProjectInput Project 23.12
totalActivityCount ApiEntityExternallySourcedProjectInput Project 23.12
updateDate ApiEntityExternallySourcedProjectInput Project 23.11
link ApiEntityProjectAutoNumberInput Project 23.11
updateDate ApiEntityProjectAutoNumberInput Project 23.11
actualCapitalCost actualCapitalCostProject ApiEntityProjectCashFlowInput Project 23.12
actualCapitalCostWorkspace1 actualCapitalCostProject ApiEntityProjectCashFlowInput Project 23.12
actualCapitalCostWorkspace2 actualCapitalCostProject ApiEntityProjectCashFlowInput Project 23.12
actualCapitalCostWorkspace3 actualCapitalCostProject ApiEntityProjectCashFlowInput Project 23.12
actualCost ApiEntityProjectCashFlowInput Project 24.3
actualCostProject ApiEntityProjectCashFlowInput Project 24.3
actualCostWorkspace1 ApiEntityProjectCashFlowInput Project 23.12
actualCostWorkspace2 ApiEntityProjectCashFlowInput Project 23.12
actualCostWorkspace3 ApiEntityProjectCashFlowInput Project 23.12
actualExpenseCost actualExpenseCostProject ApiEntityProjectCashFlowInput Project 23.12
actualExpenseCostWorkspace1 actualExpenseCostProject ApiEntityProjectCashFlowInput Project 23.12
actualExpenseCostWorkspace2 actualExpenseCostProject ApiEntityProjectCashFlowInput Project 23.12
actualExpenseCostWorkspace3 actualExpenseCostProject ApiEntityProjectCashFlowInput Project 23.12
actualForecastVar ApiEntityProjectCashFlowInput Project 23.12
actualForecastVarProject ApiEntityProjectCashFlowInput Project 24.3
actualForecastVarWorkspace1 ApiEntityProjectCashFlowInput Project 23.12
actualForecastVarWorkspace2 ApiEntityProjectCashFlowInput Project 23.12
actualForecastVarWorkspace3 ApiEntityProjectCashFlowInput Project 23.12
atCompletionCost ApiEntityProjectCashFlowInput Project 23.12
atCompletionCostProject ApiEntityProjectCashFlowInput Project 24.3
atCompletionCostWorkspace1 ApiEntityProjectCashFlowInput Project 23.12
atCompletionCostWorkspace2 ApiEntityProjectCashFlowInput Project 23.12
atCompletionCostWorkspace3 ApiEntityProjectCashFlowInput Project 23.12
benefits benefitsProject ApiEntityProjectCashFlowInput Project 23.12
benefitsWorkspace1 benefitsProject ApiEntityProjectCashFlowInput Project 23.12
benefitsWorkspace2 benefitsProject ApiEntityProjectCashFlowInput Project 23.12
benefitsWorkspace3 benefitsProject ApiEntityProjectCashFlowInput Project 23.12
currentApprovedBudgetCapitalCost ApiEntityProjectCashFlowInput Project 23.12
currentApprovedBudgetCapitalCostProject ApiEntityProjectCashFlowInput Project 23.12
currentApprovedBudgetCapitalCostWorkspace1 ApiEntityProjectCashFlowInput Project 23.12
currentApprovedBudgetCapitalCostWorkspace2 ApiEntityProjectCashFlowInput Project 23.12
currentApprovedBudgetCapitalCostWorkspace3 ApiEntityProjectCashFlowInput Project 23.12
currentApprovedBudgetExpenseCost ApiEntityProjectCashFlowInput Project 23.12
currentApprovedBudgetExpenseCostProject ApiEntityProjectCashFlowInput Project 23.12
currentApprovedBudgetExpenseCostWorkspace1 ApiEntityProjectCashFlowInput Project 23.12
currentApprovedBudgetExpenseCostWorkspace2 ApiEntityProjectCashFlowInput Project 23.12
currentApprovedBudgetExpenseCostWorkspace3 ApiEntityProjectCashFlowInput Project 23.12
currentApprovedBudget ApiEntityProjectCashFlowInput Project 24.3
currentApprovedBudgetProject ApiEntityProjectCashFlowInput Project 24.3
currentApprovedBudgetWorkspace1 ApiEntityProjectCashFlowInput Project 23.12
currentApprovedBudgetWorkspace2 ApiEntityProjectCashFlowInput Project 23.12
currentApprovedBudgetWorkspace3 ApiEntityProjectCashFlowInput Project 23.12
currentApprovedSpendVariance ApiEntityProjectCashFlowInput Project 24.3
currentApprovedSpendVarianceProject ApiEntityProjectCashFlowInput Project 23.12
currentApprovedSpendVarianceWorkspace1 ApiEntityProjectCashFlowInput Project 23.12
currentApprovedSpendVarianceWorkspace2 ApiEntityProjectCashFlowInput Project 23.12
currentApprovedSpendVarianceWorkspace3 ApiEntityProjectCashFlowInput Project 23.12
forecastCapitalCost forecastCapitalCostProject ApiEntityProjectCashFlowInput Project 23.12
forecastCapitalCostWorkspace1 forecastCapitalCostProject ApiEntityProjectCashFlowInput Project 23.12
forecastCapitalCostWorkspace2 forecastCapitalCostProject ApiEntityProjectCashFlowInput Project 23.12
forecastCapitalCostWorkspace3 forecastCapitalCostProject ApiEntityProjectCashFlowInput Project 23.12
forecastCost forecastCostProject ApiEntityProjectCashFlowInput Project 23.12
forecastCostWorkspace1 forecastCostProject ApiEntityProjectCashFlowInput Project 23.12
forecastCostWorkspace2 forecastCostProject ApiEntityProjectCashFlowInput Project 23.12
forecastCostWorkspace3 forecastCostProject ApiEntityProjectCashFlowInput Project 23.12
forecastCurrApprVar ApiEntityProjectCashFlowInput Project 24.3
forecastCurrApprVarProject ApiEntityProjectCashFlowInput Project 23.12
forecastCurrApprVarWorkspace1 ApiEntityProjectCashFlowInput Project 23.12
forecastCurrApprVarWorkspace2 ApiEntityProjectCashFlowInput Project 23.12
forecastCurrApprVarWorkspace3 ApiEntityProjectCashFlowInput Project 23.12
forecastExpenseCost forecastExpenseCostProject ApiEntityProjectCashFlowInput Project 23.12
forecastExpenseCostWorkspace1 forecastExpenseCostProject ApiEntityProjectCashFlowInput Project 23.12
forecastExpenseCostWorkspace2 forecastExpenseCostProject ApiEntityProjectCashFlowInput Project 23.12
forecastExpenseCostWorkspace3 forecastExpenseCostProject ApiEntityProjectCashFlowInput Project 23.12
link ApiEntityProjectCashFlowInput Project 23.11
plannedBudgetCapital plannedBudgetCapitalProject ApiEntityProjectCashFlowInput Project 23.12
plannedBudgetCapitalWorkspace1 plannedBudgetCapitalProject ApiEntityProjectCashFlowInput Project 23.12
plannedBudgetCapitalWorkspace2 plannedBudgetCapitalProject ApiEntityProjectCashFlowInput Project 23.12
plannedBudgetCapitalWorkspace3 plannedBudgetCapitalProject ApiEntityProjectCashFlowInput Project 23.12
plannedBudgetExpense plannedBudgetExpenseProject ApiEntityProjectCashFlowInput Project 23.12
plannedBudgetExpenseWorkspace1 plannedBudgetExpenseProject ApiEntityProjectCashFlowInput Project 23.12
plannedBudgetExpenseWorkspace2 plannedBudgetExpenseProject ApiEntityProjectCashFlowInput Project 23.12
plannedBudgetExpenseWorkspace3 plannedBudgetExpenseProject ApiEntityProjectCashFlowInput Project 23.12
plannedBudget plannedBudgetProject ApiEntityProjectCashFlowInput Project 23.12
plannedBudgetWorkspace1 plannedBudgetProject ApiEntityProjectCashFlowInput Project 23.12
plannedBudgetWorkspace2 plannedBudgetProject ApiEntityProjectCashFlowInput Project 23.12
plannedBudgetWorkspace3 plannedBudgetProject ApiEntityProjectCashFlowInput Project 23.12
proposedBudgetCapitalCost ApiEntityProjectCashFlowInput Project 23.12
proposedBudgetCapitalCostProject ApiEntityProjectCashFlowInput Project 23.12
proposedBudgetCapitalCostWorkspace1 ApiEntityProjectCashFlowInput Project 23.12
proposedBudgetCapitalCostWorkspace2 ApiEntityProjectCashFlowInput Project 23.12
proposedBudgetCapitalCostWorkspace3 ApiEntityProjectCashFlowInput Project 23.12
proposedBudgetExpenseCost ApiEntityProjectCashFlowInput Project 23.12
proposedBudgetExpenseCostProject ApiEntityProjectCashFlowInput Project 23.12
proposedBudgetExpenseCostWorkspace1 ApiEntityProjectCashFlowInput Project 23.12
proposedBudgetExpenseCostWorkspace2 ApiEntityProjectCashFlowInput Project 23.12
proposedBudgetExpenseCostWorkspace3 ApiEntityProjectCashFlowInput Project 23.12
proposedBudget ApiEntityProjectCashFlowInput Project 24.3
proposedBudgetProject ApiEntityProjectCashFlowInput Project 23.12
proposedBudgetWorkspace1 ApiEntityProjectCashFlowInput Project 23.12
proposedBudgetWorkspace2 ApiEntityProjectCashFlowInput Project 23.12
proposedBudgetWorkspace3 ApiEntityProjectCashFlowInput Project 23.12
proposedForecastVariance ApiEntityProjectCashFlowInput Project 24.3
proposedForecastVarianceProject ApiEntityProjectCashFlowInput Project 23.12
proposedForecastVarianceWorkspace1 ApiEntityProjectCashFlowInput Project 23.12
proposedForecastVarianceWorkspace2 ApiEntityProjectCashFlowInput Project 23.12
proposedForecastVarianceWorkspace3 ApiEntityProjectCashFlowInput Project 23.12
proposedPlannedVar ApiEntityProjectCashFlowInput Project 24.3
proposedPlannedVarProject ApiEntityProjectCashFlowInput Project 23.12
proposedPlannedVarWorkspace1 ApiEntityProjectCashFlowInput Project 23.12
proposedPlannedVarWorkspace2 ApiEntityProjectCashFlowInput Project 23.12
proposedPlannedVarWorkspace3 ApiEntityProjectCashFlowInput Project 23.12
spendCost spendCostProject ApiEntityProjectCashFlowInput Project 23.12
spendCostWorkspace1 spendCostProject ApiEntityProjectCashFlowInput Project 23.12
spendCostWorkspace2 spendCostProject ApiEntityProjectCashFlowInput Project 23.12
spendCostWorkspace3 spendCostProject ApiEntityProjectCashFlowInput Project 23.12
spendPlannedVariance ApiEntityProjectCashFlowInput Project 23.12
spendPlannedVarianceProject ApiEntityProjectCashFlowInput Project 24.3
spendPlannedVarianceWorkspace1 ApiEntityProjectCashFlowInput Project 23.12
spendPlannedVarianceWorkspace2 ApiEntityProjectCashFlowInput Project 23.12
spendPlannedVarianceWorkspace3 ApiEntityProjectCashFlowInput Project 23.12
updateDate ApiEntityProjectCashFlowInput Project 23.11
yearEndForecastCost ApiEntityProjectCashFlowInput Project 23.12
yearEndForecastCostProject ApiEntityProjectCashFlowInput Project 24.3
yearEndForecastCostWorkspace1 ApiEntityProjectCashFlowInput Project 23.12
yearEndForecastCostWorkspace2 ApiEntityProjectCashFlowInput Project 23.12
yearEndForecastCostWorkspace3 ApiEntityProjectCashFlowInput Project 23.12
ytdActualCost ApiEntityProjectCashFlowInput Project 23.12
ytdActualCostProject ApiEntityProjectCashFlowInput Project 24.3
ytdActualCostWorkspace1 ApiEntityProjectCashFlowInput Project 23.12
ytdActualCostWorkspace2 ApiEntityProjectCashFlowInput Project 23.12
ytdActualCostWorkspace3 ApiEntityProjectCashFlowInput Project 23.12
costValue ApiEntityProjectConfiguredFieldValueInput Project 23.11
costValueWorkspace1 ApiEntityProjectConfiguredFieldValueInput Project 23.11
costValueWorkspace2 ApiEntityProjectConfiguredFieldValueInput Project 23.11
costValueWorkspace3 ApiEntityProjectConfiguredFieldValueInput Project 23.11
exceptionMessage ApiEntityProjectConfiguredFieldValueInput Project 23.11
hasException ApiEntityProjectConfiguredFieldValueInput Project 23.11
link ApiEntityProjectConfiguredFieldValueInput Project 23.11
updateDate ApiEntityProjectConfiguredFieldValueInput Project 23.11
actualCapitalCostDistributed ApiEntityProjectFinancialInput Project 23.12
actualCapitalCostDistributedProject ApiEntityProjectFinancialInput Project 23.12
actualCapitalCostDistributedWorkspace1 ApiEntityProjectFinancialInput Project 23.12
actualCapitalCostDistributedWorkspace2 ApiEntityProjectFinancialInput Project 23.12
actualCapitalCostDistributedWorkspace3 ApiEntityProjectFinancialInput Project 23.12
actualCapitalCostPresentValue ApiEntityProjectFinancialInput Project 23.12
actualCapitalCostPresentValueProject ApiEntityProjectFinancialInput Project 23.12
actualCapitalCostPresentValueWorkspace1 ApiEntityProjectFinancialInput Project 23.12
actualCapitalCostPresentValueWorkspace2 ApiEntityProjectFinancialInput Project 23.12
actualCapitalCostPresentValueWorkspace3 ApiEntityProjectFinancialInput Project 23.12
actualCapitalCostUnDistributed ApiEntityProjectFinancialInput Project 23.12
actualCapitalCostUnDistributedProject ApiEntityProjectFinancialInput Project 23.12
actualCapitalCostUnDistributedWorkspace1 ApiEntityProjectFinancialInput Project 23.12
actualCapitalCostUnDistributedWorkspace2 ApiEntityProjectFinancialInput Project 23.12
actualCapitalCostUnDistributedWorkspace3 ApiEntityProjectFinancialInput Project 23.12
actualCapitalCost actualCapitalCostProject ApiEntityProjectFinancialInput Project 23.12
actualCapitalCostWorkspace1 actualCapitalCostProject ApiEntityProjectFinancialInput Project 23.12
actualCapitalCostWorkspace2 actualCapitalCostProject ApiEntityProjectFinancialInput Project 23.12
actualCapitalCostWorkspace3 actualCapitalCostProject ApiEntityProjectFinancialInput Project 23.12
actualCostDistributed ApiEntityProjectFinancialInput Project 23.12
actualCostDistributedProject ApiEntityProjectFinancialInput Project 23.12
actualCostPresentValue ApiEntityProjectFinancialInput Project 23.12
actualCostPresentValueProject ApiEntityProjectFinancialInput Project 23.12
actualCostPresentValueWorkspace1 ApiEntityProjectFinancialInput Project 23.12
actualCostPresentValueWorkspace2 ApiEntityProjectFinancialInput Project 23.12
actualCostPresentValueWorkspace3 ApiEntityProjectFinancialInput Project 23.12
actualCostUnDistributed ApiEntityProjectFinancialInput Project 23.12
actualCostUnDistributedProject ApiEntityProjectFinancialInput Project 23.12
actualCost actualCostProject ApiEntityProjectFinancialInput Project 23.12
actualCostWorkspace1 actualCostProject ApiEntityProjectFinancialInput Project 23.12
actualCostWorkspace2 actualCostProject ApiEntityProjectFinancialInput Project 23.12
actualCostWorkspace3 actualCostProject ApiEntityProjectFinancialInput Project 23.12
actualExpenseCostDistributed ApiEntityProjectFinancialInput Project 23.12
actualExpenseCostDistributedProject ApiEntityProjectFinancialInput Project 23.12
actualExpenseCostDistributedWorkspace1 ApiEntityProjectFinancialInput Project 23.12
actualExpenseCostDistributedWorkspace2 ApiEntityProjectFinancialInput Project 23.12
actualExpenseCostDistributedWorkspace3 ApiEntityProjectFinancialInput Project 23.12
actualExpenseCostPresentValue ApiEntityProjectFinancialInput Project 23.12
actualExpenseCostPresentValueProject ApiEntityProjectFinancialInput Project 23.12
actualExpenseCostPresentValueWorkspace1 ApiEntityProjectFinancialInput Project 23.12
actualExpenseCostPresentValueWorkspace2 ApiEntityProjectFinancialInput Project 23.12
actualExpenseCostPresentValueWorkspace3 ApiEntityProjectFinancialInput Project 23.12
actualExpenseCostUnDistributed ApiEntityProjectFinancialInput Project 23.12
actualExpenseCostUnDistributedProject ApiEntityProjectFinancialInput Project 23.12
actualExpenseCostUnDistributedWorkspace1 ApiEntityProjectFinancialInput Project 23.12
actualExpenseCostUnDistributedWorkspace2 ApiEntityProjectFinancialInput Project 23.12
actualExpenseCostUnDistributedWorkspace3 ApiEntityProjectFinancialInput Project 23.12
actualExpenseCost actualExpenseCostProject ApiEntityProjectFinancialInput Project 23.12
actualExpenseCostWorkspace1 actualExpenseCostProject ApiEntityProjectFinancialInput Project 23.12
actualExpenseCostWorkspace2 actualExpenseCostProject ApiEntityProjectFinancialInput Project 23.12
actualExpenseCostWorkspace3 actualExpenseCostProject ApiEntityProjectFinancialInput Project 23.12
allocatedFundApprovedBudgetVariance ApiEntityProjectFinancialInput Project 23.12
allocatedFundApprovedBudgetVarianceProject ApiEntityProjectFinancialInput Project 23.12
allocatedFundApprovedBudgetVarianceWorkspace1 ApiEntityProjectFinancialInput Project 23.12
allocatedFundApprovedBudgetVarianceWorkspace2 ApiEntityProjectFinancialInput Project 23.12
allocatedFundApprovedBudgetVarianceWorkspace3 ApiEntityProjectFinancialInput Project 23.12
allocatedFundForecastVariance ApiEntityProjectFinancialInput Project 23.12
allocatedFundForecastVarianceProject ApiEntityProjectFinancialInput Project 23.12
allocatedFundForecastVarianceWorkspace1 ApiEntityProjectFinancialInput Project 23.12
allocatedFundForecastVarianceWorkspace2 ApiEntityProjectFinancialInput Project 23.12
allocatedFundForecastVarianceWorkspace3 ApiEntityProjectFinancialInput Project 23.12
allocatedFundPlannedBudgetVariance ApiEntityProjectFinancialInput Project 23.12
allocatedFundPlannedBudgetVarianceProject ApiEntityProjectFinancialInput Project 23.12
allocatedFundPlannedBudgetVarianceWorkspace1 ApiEntityProjectFinancialInput Project 23.12
allocatedFundPlannedBudgetVarianceWorkspace2 ApiEntityProjectFinancialInput Project 23.12
allocatedFundPlannedBudgetVarianceWorkspace3 ApiEntityProjectFinancialInput Project 23.12
atCompletionCost ApiEntityProjectFinancialInput Project 23.12
atCompletionCostProject ApiEntityProjectFinancialInput Project 24.3
atCompletionCostWorkspace1 ApiEntityProjectFinancialInput Project 23.12
atCompletionCostWorkspace2 ApiEntityProjectFinancialInput Project 23.12
atCompletionCostWorkspace3 ApiEntityProjectFinancialInput Project 23.12
benefitsDistributed ApiEntityProjectFinancialInput Project 23.12
benefitsDistributedProject ApiEntityProjectFinancialInput Project 23.12
benefitsDistributedWorkspace1 ApiEntityProjectFinancialInput Project 23.12
benefitsDistributedWorkspace2 ApiEntityProjectFinancialInput Project 23.12
benefitsDistributedWorkspace3 ApiEntityProjectFinancialInput Project 23.12
benefitsPresentValue ApiEntityProjectFinancialInput Project 23.12
benefitsPresentValueProject ApiEntityProjectFinancialInput Project 23.12
benefitsPresentValueWorkspace1 ApiEntityProjectFinancialInput Project 23.12
benefitsPresentValueWorkspace2 ApiEntityProjectFinancialInput Project 23.12
benefitsPresentValueWorkspace3 ApiEntityProjectFinancialInput Project 23.12
benefitsUndistributed ApiEntityProjectFinancialInput Project 23.12
benefitsUndistributedProject ApiEntityProjectFinancialInput Project 23.12
benefitsUndistributedWorkspace1 ApiEntityProjectFinancialInput Project 23.12
benefitsUndistributedWorkspace2 ApiEntityProjectFinancialInput Project 23.12
benefitsUndistributedWorkspace3 ApiEntityProjectFinancialInput Project 23.12
benefits benefitsProject ApiEntityProjectFinancialInput Project 23.12
benefitsWorkspace1 benefitsProject ApiEntityProjectFinancialInput Project 23.12
benefitsWorkspace2 benefitsProject ApiEntityProjectFinancialInput Project 23.12
benefitsWorkspace3 benefitsProject ApiEntityProjectFinancialInput Project 23.12
budgetCurrentCost ApiEntityProjectFinancialInput Project 23.12
budgetCurrentCostProject ApiEntityProjectFinancialInput Project 23.12
budgetCurrentCostWorkspace1 ApiEntityProjectFinancialInput Project 23.12
budgetCurrentCostWorkspace2 ApiEntityProjectFinancialInput Project 23.12
budgetCurrentCostWorkspace3 ApiEntityProjectFinancialInput Project 23.12
budgetOriginalCost ApiEntityProjectFinancialInput Project 23.12
budgetOriginalCostProject ApiEntityProjectFinancialInput Project 23.12
budgetOriginalCostWorkspace1 ApiEntityProjectFinancialInput Project 23.12
budgetOriginalCostWorkspace2 ApiEntityProjectFinancialInput Project 23.12
budgetOriginalCostWorkspace3 ApiEntityProjectFinancialInput Project 23.12
constructionValue constructionValueProject ApiEntityProjectFinancialInput Project 23.12
constructionValueWorkspace1 constructionValueProject ApiEntityProjectFinancialInput Project 23.12
constructionValueWorkspace2 constructionValueProject ApiEntityProjectFinancialInput Project 23.12
constructionValueWorkspace3 constructionValueProject ApiEntityProjectFinancialInput Project 23.12
costVariance costVarianceProject ApiEntityProjectFinancialInput Project 23.12
costVarianceWorkspace1 costVarianceProject ApiEntityProjectFinancialInput Project 23.12
costVarianceWorkspace2 costVarianceProject ApiEntityProjectFinancialInput Project 23.12
costVarianceWorkspace3 costVarianceProject ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetBaseDistributed ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetBaseDistributedProject ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetBaseDistributedWorkspace1 ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetBaseDistributedWorkspace2 ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetBaseDistributedWorkspace3 ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetBasePresentValue ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetBasePresentValueProject ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetBasePresentValueWorkspace1 ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetBasePresentValueWorkspace2 ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetBasePresentValueWorkspace3 ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetBaseUndistributed ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetBaseUndistributedProject ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetBaseUndistributedWorkspace1 ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetBaseUndistributedWorkspace2 ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetBaseUndistributedWorkspace3 ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetCapitalCostDistributed ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetCapitalCostDistributedProject ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetCapitalCostDistributedWorkspace1 ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetCapitalCostDistributedWorkspace2 ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetCapitalCostDistributedWorkspace3 ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetCapitalCostPresentValue ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetCapitalCostPresentValueProject ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetCapitalCostPresentValueWorkspace1 ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetCapitalCostPresentValueWorkspace2 ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetCapitalCostPresentValueWorkspace3 ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetCapitalCostUnDistributed ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetCapitalCostUnDistributedProject ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetCapitalCostUnDistributedWorkspace1 ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetCapitalCostUnDistributedWorkspace2 ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetCapitalCostUnDistributedWorkspace3 ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetCapitalCost ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetCapitalCostProject ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetCapitalCostWorkspace1 ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetCapitalCostWorkspace2 ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetCapitalCostWorkspace3 ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetExpenseCostDistributed ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetExpenseCostDistributedProject ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetExpenseCostDistributedWorkspace1 ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetExpenseCostDistributedWorkspace2 ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetExpenseCostDistributedWorkspace3 ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetExpenseCostPresentValue ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetExpenseCostPresentValueProject ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetExpenseCostPresentValueWorkspace1 ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetExpenseCostPresentValueWorkspace2 ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetExpenseCostPresentValueWorkspace3 ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetExpenseCostUnDistributed ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetExpenseCostUnDistributedProject ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetExpenseCostUnDistributedWorkspace1 ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetExpenseCostUnDistributedWorkspace2 ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetExpenseCostUnDistributedWorkspace3 ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetExpenseCost ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetExpenseCostProject ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetExpenseCostWorkspace1 ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetExpenseCostWorkspace2 ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetExpenseCostWorkspace3 ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudget ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetProject ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetWorkspace1 ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetWorkspace2 ApiEntityProjectFinancialInput Project 23.12
currentApprovedBudgetWorkspace3 ApiEntityProjectFinancialInput Project 23.12
currentApprovedSpendVariance ApiEntityProjectFinancialInput Project 23.12
currentApprovedSpendVarianceProject ApiEntityProjectFinancialInput Project 23.12
currentApprovedSpendVarianceWorkspace1 ApiEntityProjectFinancialInput Project 23.12
currentApprovedSpendVarianceWorkspace2 ApiEntityProjectFinancialInput Project 23.12
currentApprovedSpendVarianceWorkspace3 ApiEntityProjectFinancialInput Project 23.12
earnedValueCost earnedValueCostProject ApiEntityProjectFinancialInput Project 23.12
earnedValueCostWorkspace1 earnedValueCostProject ApiEntityProjectFinancialInput Project 23.12
earnedValueCostWorkspace2 earnedValueCostProject ApiEntityProjectFinancialInput Project 23.12
earnedValueCostWorkspace3 earnedValueCostProject ApiEntityProjectFinancialInput Project 23.12
estAtCompleteCost estAtCompleteCostProject ApiEntityProjectFinancialInput Project 23.12
estAtCompleteCostWorkspace1 estAtCompleteCostProject ApiEntityProjectFinancialInput Project 23.12
estAtCompleteCostWorkspace2 estAtCompleteCostProject ApiEntityProjectFinancialInput Project 23.12
estAtCompleteCostWorkspace3 estAtCompleteCostProject ApiEntityProjectFinancialInput Project 23.12
estToCompleteCost estToCompleteCostProject ApiEntityProjectFinancialInput Project 23.12
estToCompleteCostWorkspace1 estToCompleteCostProject ApiEntityProjectFinancialInput Project 23.12
estToCompleteCostWorkspace2 estToCompleteCostProject ApiEntityProjectFinancialInput Project 23.12
estToCompleteCostWorkspace3 estToCompleteCostProject ApiEntityProjectFinancialInput Project 23.12
forecastCapitalCostDistributed ApiEntityProjectFinancialInput Project 23.12
forecastCapitalCostDistributedProject ApiEntityProjectFinancialInput Project 23.12
forecastCapitalCostDistributedWorkspace1 ApiEntityProjectFinancialInput Project 23.12
forecastCapitalCostDistributedWorkspace2 ApiEntityProjectFinancialInput Project 23.12
forecastCapitalCostDistributedWorkspace3 ApiEntityProjectFinancialInput Project 23.12
forecastCapitalCostPresentValue ApiEntityProjectFinancialInput Project 23.12
forecastCapitalCostPresentValueProject ApiEntityProjectFinancialInput Project 23.12
forecastCapitalCostPresentValueWorkspace1 ApiEntityProjectFinancialInput Project 23.12
forecastCapitalCostPresentValueWorkspace2 ApiEntityProjectFinancialInput Project 23.12
forecastCapitalCostPresentValueWorkspace3 ApiEntityProjectFinancialInput Project 23.12
forecastCapitalCostUnDistributed ApiEntityProjectFinancialInput Project 23.12
forecastCapitalCostUnDistributedProject ApiEntityProjectFinancialInput Project 23.12
forecastCapitalCostUnDistributedWorkspace1 ApiEntityProjectFinancialInput Project 23.12
forecastCapitalCostUnDistributedWorkspace2 ApiEntityProjectFinancialInput Project 23.12
forecastCapitalCostUnDistributedWorkspace3 ApiEntityProjectFinancialInput Project 23.12
forecastCapitalCost forecastCapitalCostProject ApiEntityProjectFinancialInput Project 23.12
forecastCapitalCostWorkspace1 forecastCapitalCostProject ApiEntityProjectFinancialInput Project 23.12
forecastCapitalCostWorkspace2 forecastCapitalCostProject ApiEntityProjectFinancialInput Project 23.12
forecastCapitalCostWorkspace3 forecastCapitalCostProject ApiEntityProjectFinancialInput Project 23.12
forecastCostDistributed ApiEntityProjectFinancialInput Project 23.12
forecastCostDistributedProject ApiEntityProjectFinancialInput Project 23.12
forecastCostDistributedWorkspace1 ApiEntityProjectFinancialInput Project 23.12
forecastCostDistributedWorkspace2 ApiEntityProjectFinancialInput Project 23.12
forecastCostDistributedWorkspace3 ApiEntityProjectFinancialInput Project 23.12
forecastCostPresentValue ApiEntityProjectFinancialInput Project 23.12
forecastCostPresentValueProject ApiEntityProjectFinancialInput Project 23.12
forecastCostPresentValueWorkspace1 ApiEntityProjectFinancialInput Project 23.12
forecastCostPresentValueWorkspace2 ApiEntityProjectFinancialInput Project 23.12
forecastCostPresentValueWorkspace3 ApiEntityProjectFinancialInput Project 23.12
forecastCostUndistributed ApiEntityProjectFinancialInput Project 23.12
forecastCostUndistributedProject ApiEntityProjectFinancialInput Project 23.12
forecastCostUndistributedWorkspace1 ApiEntityProjectFinancialInput Project 23.12
forecastCostUndistributedWorkspace2 ApiEntityProjectFinancialInput Project 23.12
forecastCostUndistributedWorkspace3 ApiEntityProjectFinancialInput Project 23.12
forecastCost forecastCostProject ApiEntityProjectFinancialInput Project 23.12
forecastCostWorkspace1 forecastCostProject ApiEntityProjectFinancialInput Project 23.12
forecastCostWorkspace2 forecastCostProject ApiEntityProjectFinancialInput Project 23.12
forecastCostWorkspace3 forecastCostProject ApiEntityProjectFinancialInput Project 23.12
forecastCurrApprVar ApiEntityProjectFinancialInput Project 23.12
forecastCurrApprVarProject ApiEntityProjectFinancialInput Project 23.12
forecastCurrApprVarWorkspace1 ApiEntityProjectFinancialInput Project 23.12
forecastCurrApprVarWorkspace2 ApiEntityProjectFinancialInput Project 23.12
forecastCurrApprVarWorkspace3 ApiEntityProjectFinancialInput Project 23.12
forecastExpenseCostDistributed ApiEntityProjectFinancialInput Project 23.12
forecastExpenseCostDistributedProject ApiEntityProjectFinancialInput Project 23.12
forecastExpenseCostDistributedWorkspace1 ApiEntityProjectFinancialInput Project 23.12
forecastExpenseCostDistributedWorkspace2 ApiEntityProjectFinancialInput Project 23.12
forecastExpenseCostDistributedWorkspace3 ApiEntityProjectFinancialInput Project 23.12
forecastExpenseCostPresentValue ApiEntityProjectFinancialInput Project 23.12
forecastExpenseCostPresentValueProject ApiEntityProjectFinancialInput Project 23.12
forecastExpenseCostPresentValueWorkspace1 ApiEntityProjectFinancialInput Project 23.12
forecastExpenseCostPresentValueWorkspace2 ApiEntityProjectFinancialInput Project 23.12
forecastExpenseCostPresentValueWorkspace3 ApiEntityProjectFinancialInput Project 23.12
forecastExpenseCostUnDistributed ApiEntityProjectFinancialInput Project 23.12
forecastExpenseCostUnDistributedProject ApiEntityProjectFinancialInput Project 23.12
forecastExpenseCostUnDistributedWorkspace1 ApiEntityProjectFinancialInput Project 23.12
forecastExpenseCostUnDistributedWorkspace2 ApiEntityProjectFinancialInput Project 23.12
forecastExpenseCostUnDistributedWorkspace3 ApiEntityProjectFinancialInput Project 23.12
forecastExpenseCost forecastExpenseCostProject ApiEntityProjectFinancialInput Project 23.12
forecastExpenseCostWorkspace1 forecastExpenseCostProject ApiEntityProjectFinancialInput Project 23.12
forecastExpenseCostWorkspace2 forecastExpenseCostProject ApiEntityProjectFinancialInput Project 23.12
forecastExpenseCostWorkspace3 forecastExpenseCostProject ApiEntityProjectFinancialInput Project 23.12
link ApiEntityProjectFinancialInput Project 23.11
netPresentValue netPresentValueProject ApiEntityProjectFinancialInput Project 23.12
netPresentValueWorkspace1 netPresentValueProject ApiEntityProjectFinancialInput Project 23.12
netPresentValueWorkspace2 netPresentValueProject ApiEntityProjectFinancialInput Project 23.12
netPresentValueWorkspace3 netPresentValueProject ApiEntityProjectFinancialInput Project 23.12
plannedBudgetCapital ApiEntityProjectFinancialInput Project 23.12
plannedBudgetCapitalDistributed ApiEntityProjectFinancialInput Project 23.12
plannedBudgetCapitalDistributedProject ApiEntityProjectFinancialInput Project 23.12
plannedBudgetCapitalDistributedWorkspace1 ApiEntityProjectFinancialInput Project 23.12
plannedBudgetCapitalDistributedWorkspace2 ApiEntityProjectFinancialInput Project 23.12
plannedBudgetCapitalDistributedWorkspace3 ApiEntityProjectFinancialInput Project 23.12
plannedBudgetCapitalPresentValue ApiEntityProjectFinancialInput Project 23.12
plannedBudgetCapitalPresentValueProject ApiEntityProjectFinancialInput Project 23.12
plannedBudgetCapitalPresentValueWorkspace1 ApiEntityProjectFinancialInput Project 23.12
plannedBudgetCapitalPresentValueWorkspace2 ApiEntityProjectFinancialInput Project 23.12
plannedBudgetCapitalPresentValueWorkspace3 ApiEntityProjectFinancialInput Project 23.12
plannedBudgetCapitalUnDistributed ApiEntityProjectFinancialInput Project 23.12
plannedBudgetCapitalUnDistributedProject ApiEntityProjectFinancialInput Project 23.12
plannedBudgetCapitalUnDistributedWorkspace1 ApiEntityProjectFinancialInput Project 23.12
plannedBudgetCapitalUnDistributedWorkspace2 ApiEntityProjectFinancialInput Project 23.12
plannedBudgetCapitalUnDistributedWorkspace3 ApiEntityProjectFinancialInput Project 23.12
plannedBudgetCapitalWorkspace1 ApiEntityProjectFinancialInput Project 23.12
plannedBudgetCapitalWorkspace2 ApiEntityProjectFinancialInput Project 23.12
plannedBudgetCapitalWorkspace3 ApiEntityProjectFinancialInput Project 23.12
plannedBudgetDistributed ApiEntityProjectFinancialInput Project 23.12
plannedBudgetDistributedProject ApiEntityProjectFinancialInput Project 23.12
plannedBudgetDistributedWorkspace1 ApiEntityProjectFinancialInput Project 23.12
plannedBudgetDistributedWorkspace2 ApiEntityProjectFinancialInput Project 23.12
plannedBudgetDistributedWorkspace3 ApiEntityProjectFinancialInput Project 23.12
plannedBudgetExpenseDistributed ApiEntityProjectFinancialInput Project 23.12
plannedBudgetExpenseDistributedProject ApiEntityProjectFinancialInput Project 23.12
plannedBudgetExpenseDistributedWorkspace1 ApiEntityProjectFinancialInput Project 23.12
plannedBudgetExpenseDistributedWorkspace2 ApiEntityProjectFinancialInput Project 23.12
plannedBudgetExpenseDistributedWorkspace3 ApiEntityProjectFinancialInput Project 23.12
plannedBudgetExpensePresentValue ApiEntityProjectFinancialInput Project 23.12
plannedBudgetExpensePresentValueProject ApiEntityProjectFinancialInput Project 23.12
plannedBudgetExpensePresentValueWorkspace1 ApiEntityProjectFinancialInput Project 23.12
plannedBudgetExpensePresentValueWorkspace2 ApiEntityProjectFinancialInput Project 23.12
plannedBudgetExpensePresentValueWorkspace3 ApiEntityProjectFinancialInput Project 23.12
plannedBudgetExpenseUnDistributed ApiEntityProjectFinancialInput Project 23.12
plannedBudgetExpenseUnDistributedProject ApiEntityProjectFinancialInput Project 23.12
plannedBudgetExpenseUnDistributedWorkspace1 ApiEntityProjectFinancialInput Project 23.12
plannedBudgetExpenseUnDistributedWorkspace2 ApiEntityProjectFinancialInput Project 23.12
plannedBudgetExpenseUnDistributedWorkspace3 ApiEntityProjectFinancialInput Project 23.12
plannedBudgetExpense ApiEntityProjectFinancialInput Project 23.12
plannedBudgetExpenseWorkspace1 ApiEntityProjectFinancialInput Project 23.12
plannedBudgetExpenseWorkspace2 ApiEntityProjectFinancialInput Project 23.12
plannedBudgetExpenseWorkspace3 ApiEntityProjectFinancialInput Project 23.12
plannedBudgetPresentValue ApiEntityProjectFinancialInput Project 23.12
plannedBudgetPresentValueProject ApiEntityProjectFinancialInput Project 23.12
plannedBudgetPresentValueWorkspace1 ApiEntityProjectFinancialInput Project 23.12
plannedBudgetPresentValueWorkspace2 ApiEntityProjectFinancialInput Project 23.12
plannedBudgetPresentValueWorkspace3 ApiEntityProjectFinancialInput Project 23.12
plannedBudgetUndistributed ApiEntityProjectFinancialInput Project 23.12
plannedBudgetUndistributedProject ApiEntityProjectFinancialInput Project 23.12
plannedBudgetUndistributedWorkspace1 ApiEntityProjectFinancialInput Project 23.12
plannedBudgetUndistributedWorkspace2 ApiEntityProjectFinancialInput Project 23.12
plannedBudgetUndistributedWorkspace3 ApiEntityProjectFinancialInput Project 23.12
plannedBudget plannedBudgetProject ApiEntityProjectFinancialInput Project 23.12
plannedBudgetWorkspace1 plannedBudgetProject ApiEntityProjectFinancialInput Project 23.12
plannedBudgetWorkspace2 plannedBudgetProject ApiEntityProjectFinancialInput Project 23.12
plannedBudgetWorkspace3 plannedBudgetProject ApiEntityProjectFinancialInput Project 23.12
plannedValueCost plannedValueCostProject ApiEntityProjectFinancialInput Project 23.12
plannedValueCostWorkspace1 plannedValueCostProject ApiEntityProjectFinancialInput Project 23.12
plannedValueCostWorkspace2 plannedValueCostProject ApiEntityProjectFinancialInput Project 23.12
plannedValueCostWorkspace3 plannedValueCostProject ApiEntityProjectFinancialInput Project 23.12
proposedBudgetBaseDistributed ApiEntityProjectFinancialInput Project 23.12
proposedBudgetBaseDistributedProject ApiEntityProjectFinancialInput Project 23.12
proposedBudgetBaseDistributedWorkspace1 ApiEntityProjectFinancialInput Project 23.12
proposedBudgetBaseDistributedWorkspace2 ApiEntityProjectFinancialInput Project 23.12
proposedBudgetBaseDistributedWorkspace3 ApiEntityProjectFinancialInput Project 23.12
proposedBudgetBasePresentValue ApiEntityProjectFinancialInput Project 23.12
proposedBudgetBasePresentValueProject ApiEntityProjectFinancialInput Project 23.12
proposedBudgetBasePresentValueWorkspace1 ApiEntityProjectFinancialInput Project 23.12
proposedBudgetBasePresentValueWorkspace2 ApiEntityProjectFinancialInput Project 23.12
proposedBudgetBasePresentValueWorkspace3 ApiEntityProjectFinancialInput Project 23.12
proposedBudgetBaseUndistributed ApiEntityProjectFinancialInput Project 23.12
proposedBudgetBaseUndistributedProject ApiEntityProjectFinancialInput Project 23.12
proposedBudgetBaseUndistributedWorkspace1 ApiEntityProjectFinancialInput Project 23.12
proposedBudgetBaseUndistributedWorkspace2 ApiEntityProjectFinancialInput Project 23.12
proposedBudgetBaseUndistributedWorkspace3 ApiEntityProjectFinancialInput Project 23.12
proposedBudgetCapitalCostDistributed ApiEntityProjectFinancialInput Project 23.12
proposedBudgetCapitalCostDistributedProject ApiEntityProjectFinancialInput Project 23.12
proposedBudgetCapitalCostDistributedWorkspace1 ApiEntityProjectFinancialInput Project 23.12
proposedBudgetCapitalCostDistributedWorkspace2 ApiEntityProjectFinancialInput Project 23.12
proposedBudgetCapitalCostDistributedWorkspace3 ApiEntityProjectFinancialInput Project 23.12
proposedBudgetCapitalCostPresentValue ApiEntityProjectFinancialInput Project 23.12
proposedBudgetCapitalCostPresentValueProject ApiEntityProjectFinancialInput Project 23.12
proposedBudgetCapitalCostPresentValueWorkspace1 ApiEntityProjectFinancialInput Project 23.12
proposedBudgetCapitalCostPresentValueWorkspace2 ApiEntityProjectFinancialInput Project 23.12
proposedBudgetCapitalCostPresentValueWorkspace3 ApiEntityProjectFinancialInput Project 23.12
proposedBudgetCapitalCostUnDistributed ApiEntityProjectFinancialInput Project 23.12
proposedBudgetCapitalCostUnDistributedProject ApiEntityProjectFinancialInput Project 23.12
proposedBudgetCapitalCostUnDistributedWorkspace1 ApiEntityProjectFinancialInput Project 23.12
proposedBudgetCapitalCostUnDistributedWorkspace2 ApiEntityProjectFinancialInput Project 23.12
proposedBudgetCapitalCostUnDistributedWorkspace3 ApiEntityProjectFinancialInput Project 23.12
proposedBudgetCapitalCost ApiEntityProjectFinancialInput Project 23.12
proposedBudgetCapitalCostProject ApiEntityProjectFinancialInput Project 23.12
proposedBudgetCapitalCostWorkspace1 ApiEntityProjectFinancialInput Project 23.12
proposedBudgetCapitalCostWorkspace2 ApiEntityProjectFinancialInput Project 23.12
proposedBudgetCapitalCostWorkspace3 ApiEntityProjectFinancialInput Project 23.12
proposedBudgetExpenseCostDistributed ApiEntityProjectFinancialInput Project 23.12
proposedBudgetExpenseCostDistributedProject ApiEntityProjectFinancialInput Project 23.12
proposedBudgetExpenseCostDistributedWorkspace1 ApiEntityProjectFinancialInput Project 23.12
proposedBudgetExpenseCostDistributedWorkspace2 ApiEntityProjectFinancialInput Project 23.12
proposedBudgetExpenseCostDistributedWorkspace3 ApiEntityProjectFinancialInput Project 23.12
proposedBudgetExpenseCostPresentValue ApiEntityProjectFinancialInput Project 23.12
proposedBudgetExpenseCostPresentValueProject ApiEntityProjectFinancialInput Project 23.12
proposedBudgetExpenseCostPresentValueWorkspace1 ApiEntityProjectFinancialInput Project 23.12
proposedBudgetExpenseCostPresentValueWorkspace2 ApiEntityProjectFinancialInput Project 23.12
proposedBudgetExpenseCostPresentValueWorkspace3 ApiEntityProjectFinancialInput Project 23.12
proposedBudgetExpenseCostUnDistributed ApiEntityProjectFinancialInput Project 23.12
proposedBudgetExpenseCostUnDistributedProject ApiEntityProjectFinancialInput Project 23.12
proposedBudgetExpenseCostUnDistributedWorkspace1 ApiEntityProjectFinancialInput Project 23.12
proposedBudgetExpenseCostUnDistributedWorkspace2 ApiEntityProjectFinancialInput Project 23.12
proposedBudgetExpenseCostUnDistributedWorkspace3 ApiEntityProjectFinancialInput Project 23.12
proposedBudgetExpenseCost ApiEntityProjectFinancialInput Project 23.12
proposedBudgetExpenseCostProject ApiEntityProjectFinancialInput Project 23.12
proposedBudgetExpenseCostWorkspace1 ApiEntityProjectFinancialInput Project 23.12
proposedBudgetExpenseCostWorkspace2 ApiEntityProjectFinancialInput Project 23.12
proposedBudgetExpenseCostWorkspace3 ApiEntityProjectFinancialInput Project 23.12
proposedBudget ApiEntityProjectFinancialInput Project 23.12
proposedBudgetProject ApiEntityProjectFinancialInput Project 23.12
proposedBudgetWorkspace1 ApiEntityProjectFinancialInput Project 23.12
proposedBudgetWorkspace2 ApiEntityProjectFinancialInput Project 23.12
proposedBudgetWorkspace3 ApiEntityProjectFinancialInput Project 23.12
proposedForecastVariance ApiEntityProjectFinancialInput Project 23.12
proposedForecastVarianceProject ApiEntityProjectFinancialInput Project 23.12
proposedForecastVarianceWorkspace1 ApiEntityProjectFinancialInput Project 23.12
proposedForecastVarianceWorkspace2 ApiEntityProjectFinancialInput Project 23.12
proposedForecastVarianceWorkspace3 ApiEntityProjectFinancialInput Project 23.12
proposedPlannedVar ApiEntityProjectFinancialInput Project 23.12
proposedPlannedVarProject ApiEntityProjectFinancialInput Project 23.12
proposedPlannedVarWorkspace1 ApiEntityProjectFinancialInput Project 23.12
proposedPlannedVarWorkspace2 ApiEntityProjectFinancialInput Project 23.12
proposedPlannedVarWorkspace3 ApiEntityProjectFinancialInput Project 23.12
scheduleVariance scheduleVarianceProject ApiEntityProjectFinancialInput Project 23.12
scheduleVarianceWorkspace1 scheduleVarianceProject ApiEntityProjectFinancialInput Project 23.12
scheduleVarianceWorkspace2 scheduleVarianceProject ApiEntityProjectFinancialInput Project 23.12
scheduleVarianceWorkspace3 scheduleVarianceProject ApiEntityProjectFinancialInput Project 23.12
spendCost spendCostProject ApiEntityProjectFinancialInput Project 23.12
spendCostWorkspace1 spendCostProject ApiEntityProjectFinancialInput Project 23.12
spendCostWorkspace2 spendCostProject ApiEntityProjectFinancialInput Project 23.12
spendCostWorkspace3 spendCostProject ApiEntityProjectFinancialInput Project 23.12
spendForecastVar ApiEntityProjectFinancialInput Project 23.12
spendForecastVarProject ApiEntityProjectFinancialInput Project 23.12
spendForecastVarWorkspace1 ApiEntityProjectFinancialInput Project 23.12
spendForecastVarWorkspace2 ApiEntityProjectFinancialInput Project 23.12
spendForecastVarWorkspace3 ApiEntityProjectFinancialInput Project 23.12
spendPlannedVariance ApiEntityProjectFinancialInput Project 23.12
spendPlannedVarianceProject ApiEntityProjectFinancialInput Project 23.12
spendPlannedVarianceWorkspace1 ApiEntityProjectFinancialInput Project 23.12
spendPlannedVarianceWorkspace2 ApiEntityProjectFinancialInput Project 23.12
spendPlannedVarianceWorkspace3 ApiEntityProjectFinancialInput Project 23.12
updateDate ApiEntityProjectFinancialInput Project 23.11
yearEndForecastCost ApiEntityProjectFinancialInput Project 23.12
yearEndForecastCostProject ApiEntityProjectFinancialInput Project 23.12
yearEndForecastCostWorkspace1 ApiEntityProjectFinancialInput Project 23.12
yearEndForecastCostWorkspace2 ApiEntityProjectFinancialInput Project 23.12
yearEndForecastCostWorkspace3 ApiEntityProjectFinancialInput Project 23.12
ytdSpendCost ApiEntityProjectFinancialInput Project 23.12
ytdSpendCostProject ApiEntityProjectFinancialInput Project 23.12
ytdSpendCostWorkspace1 ApiEntityProjectFinancialInput Project 23.12
ytdSpendCostWorkspace2 ApiEntityProjectFinancialInput Project 23.12
ytdSpendCostWorkspace3 ApiEntityProjectFinancialInput Project 23.12
link ApiEntityProjectImageInput Project 23.11
updateDate ApiEntityProjectImageInput Project 23.11
actualDuration ApiEntityProjectInput Project 23.12
currentApprovedFinishDate ApiEntityProjectInput Project 23.12
currentApprovedStartDate ApiEntityProjectInput Project 23.12
danglingFinishActivityCount ApiEntityProjectInput Project 23.12
danglingFinishActivityPercent ApiEntityProjectInput Project 23.12
danglingStartActivityCount ApiEntityProjectInput Project 23.12
danglingStartActivityPercent ApiEntityProjectInput Project 23.12
evaluationMatrixId ApiEntityProjectInput Project 23.12
evaluationScore ApiEntityProjectInput Project 23.12
ffPredecessorActivityCount ApiEntityProjectInput Project 23.12
ffPredecessorActivityPercent ApiEntityProjectInput Project 23.12
finishDateVariance ApiEntityProjectInput Project 23.12
fsPredecessorActivityCount ApiEntityProjectInput Project 23.12
fsPredecessorActivityPercent ApiEntityProjectInput Project 23.12
hardConstraintActivityCount ApiEntityProjectInput Project 23.12
hardConstraintActivityPercent ApiEntityProjectInput Project 23.12
image ApiEntityProjectInput Project 23.12
invalidProgressDateActivityCount ApiEntityProjectInput Project 23.12
invalidProgressDateActivityPercent ApiEntityProjectInput Project 23.12
largeDurationActivityCount ApiEntityProjectInput Project 23.12
largeDurationActivityPercent ApiEntityProjectInput Project 23.12
largeFloatActivityCount ApiEntityProjectInput Project 23.12
largeFloatActivityPercent ApiEntityProjectInput Project 23.12
lastProjectEvaluationDate ApiEntityProjectInput Project 23.12
lateActivityCount ApiEntityProjectInput Project 23.12
lateActivityPercent ApiEntityProjectInput Project 23.12
link ApiEntityProjectInput Project 23.11
linkPlannedBudgetTo ApiEntityProjectInput Project 23.12
negativeFloatActivityCount ApiEntityProjectInput Project 23.12
negativeFloatActivityPercent ApiEntityProjectInput Project 23.12
noPredecessorActivityCount ApiEntityProjectInput Project 23.12
noPredecessorActivityPercent ApiEntityProjectInput Project 23.12
noResourceActivityCount ApiEntityProjectInput Project 23.12
noResourceActivityPercent ApiEntityProjectInput Project 23.12
noSuccessorActivityCount ApiEntityProjectInput Project 23.12
noSuccessorActivityPercent ApiEntityProjectInput Project 23.12
openEndsActivityCount ApiEntityProjectInput Project 23.12
openEndsActivityPercent ApiEntityProjectInput Project 23.12
parentProject ApiEntityProjectInput Project 23.12
percentCompleteWeightedBy ApiEntityProjectInput Project 23.12
planDuration ApiEntityProjectInput Project 23.12
predecessorLagActivityCount ApiEntityProjectInput Project 23.12
predecessorLagActivityPercent ApiEntityProjectInput Project 23.12
predecessorNegativeLagActivityCount ApiEntityProjectInput Project 23.12
predecessorNegativeLagActivityPercent ApiEntityProjectInput Project 23.12
projectAutoNumber ApiEntityProjectInput Project 23.12
projectScheduleHealthPercent ApiEntityProjectInput Project 23.12
projectTerm ApiEntityProjectInput Project 23.12
proposedFinishDate ApiEntityProjectInput Project 23.12
proposedStartDate ApiEntityProjectInput Project 23.12
recordCount ApiEntityProjectInput Project 23.12
remainingDuration ApiEntityProjectInput Project 23.12
remainingFinishDate ApiEntityProjectInput Project 23.12
remainingStartDate ApiEntityProjectInput Project 23.12
reportCycleNamingBoundary ApiEntityProjectInput Project 23.12
scheduledFinishDate ApiEntityProjectInput Project 23.12
securityGuid ApiEntityProjectInput Project 23.12
sfPredecessorActivityCount ApiEntityProjectInput Project 23.12
sfPredecessorActivityPercent ApiEntityProjectInput Project 23.12
softConstraintActivityCount ApiEntityProjectInput Project 23.12
softConstraintActivityPercent ApiEntityProjectInput Project 23.12
ssPredecessorActivityCount ApiEntityProjectInput Project 23.12
ssPredecessorActivityPercent ApiEntityProjectInput Project 23.12
startDateVariance ApiEntityProjectInput Project 23.12
totalActivityCount ApiEntityProjectInput Project 23.12
updateDate ApiEntityProjectInput Project 23.11
link ApiEntityProjectIntegrationSourceInput Project 23.11
updateDate ApiEntityProjectIntegrationSourceInput Project 23.11
link ApiEntityProjectSettingInput Project 23.11
updateDate ApiEntityProjectSettingInput Project 23.11
approvedByUserId ApiEntityExternallySourcedProjectActualsInput Project Actuals 23.11
approvedDate ApiEntityExternallySourcedProjectActualsInput Project Actuals 23.11
confirmedByEmailAddress ApiEntityExternallySourcedProjectActualsInput Project Actuals 23.11
link ApiEntityExternallySourcedProjectActualsInput Project Actuals 23.11
totalHours ApiEntityExternallySourcedProjectActualsInput Project Actuals 23.11
updateDate ApiEntityExternallySourcedProjectActualsInput Project Actuals 23.11
withdrawByUserId ApiEntityExternallySourcedProjectActualsInput Project Actuals 23.11
withdrawConfirmedByEmailAddress ApiEntityExternallySourcedProjectActualsInput Project Actuals 23.11
withdrawDate ApiEntityExternallySourcedProjectActualsInput Project Actuals 23.11
costValue ApiEntityProjectActualsConfiguredFieldValueInput Project Actuals 23.11
costValueProject ApiEntityProjectActualsConfiguredFieldValueInput Project Actuals 23.11
costValueWorkspace1 ApiEntityProjectActualsConfiguredFieldValueInput Project Actuals 23.11
costValueWorkspace2 ApiEntityProjectActualsConfiguredFieldValueInput Project Actuals 23.11
costValueWorkspace3 ApiEntityProjectActualsConfiguredFieldValueInput Project Actuals 23.11
exceptionMessage ApiEntityProjectActualsConfiguredFieldValueInput Project Actuals 23.11
hasException ApiEntityProjectActualsConfiguredFieldValueInput Project Actuals 23.11
link ApiEntityProjectActualsConfiguredFieldValueInput Project Actuals 23.11
updateDate ApiEntityProjectActualsConfiguredFieldValueInput Project Actuals 23.11
link ApiEntityProjectActualsCostInput Project Actuals 23.11
totalAmount ApiEntityProjectActualsCostInput Project Actuals 23.11
totalAmountProject ApiEntityProjectActualsCostInput Project Actuals 23.11
totalAmountWorkspace1 ApiEntityProjectActualsCostInput Project Actuals 23.11
totalAmountWorkspace2 ApiEntityProjectActualsCostInput Project Actuals 23.11
totalAmountWorkspace3 ApiEntityProjectActualsCostInput Project Actuals 23.11
totalAmountProjectActuals ApiEntityProjectActualsCostInput Project Actuals 23.11
updateDate ApiEntityProjectActualsCostInput Project Actuals 23.11
approvedByUserId ApiEntityProjectActualsInput Project Actuals 23.11
approvedDate ApiEntityProjectActualsInput Project Actuals 23.11
confirmedByEmailAddress ApiEntityProjectActualsInput Project Actuals 23.11
link ApiEntityProjectActualsInput Project Actuals 23.11
totalHours ApiEntityProjectActualsInput Project Actuals 23.11
updateDate ApiEntityProjectActualsInput Project Actuals 23.11
withdrawByUserId ApiEntityProjectActualsInput Project Actuals 23.11
withdrawConfirmedByEmailAddress ApiEntityProjectActualsInput Project Actuals 23.11
withdrawDate ApiEntityProjectActualsInput Project Actuals 23.11
itemSuffix ApiEntityExternallySourcedProjectActualsLineItemInput Project Actuals Line Item 23.11
link ApiEntityExternallySourcedProjectActualsLineItemInput Project Actuals Line Item 23.11
updateDate ApiEntityExternallySourcedProjectActualsLineItemInput Project Actuals Line Item 23.11
link ApiEntityProjectActualsLineItemCostInput Project Actuals Line Item 23.11
total ApiEntityProjectActualsLineItemCostInput Project Actuals Line Item 23.11
totalProject ApiEntityProjectActualsLineItemCostInput Project Actuals Line Item 23.11
totalWorkspace1 ApiEntityProjectActualsLineItemCostInput Project Actuals Line Item 23.11
totalWorkspace2 ApiEntityProjectActualsLineItemCostInput Project Actuals Line Item 23.11
totalWorkspace3 ApiEntityProjectActualsLineItemCostInput Project Actuals Line Item 23.11
unitPrice ApiEntityProjectActualsLineItemCostInput Project Actuals Line Item 23.11
unitPriceProject ApiEntityProjectActualsLineItemCostInput Project Actuals Line Item 23.11
unitPriceWorkspace1 ApiEntityProjectActualsLineItemCostInput Project Actuals Line Item 23.11
unitPriceWorkspace2 ApiEntityProjectActualsLineItemCostInput Project Actuals Line Item 23.11
unitPriceWorkspace3 ApiEntityProjectActualsLineItemCostInput Project Actuals Line Item 23.11
updateDate ApiEntityProjectActualsLineItemCostInput Project Actuals Line Item 23.11
itemSuffix ApiEntityProjectActualsLineItemInput Project Actuals Line Item 23.11
link ApiEntityProjectActualsLineItemInput Project Actuals Line Item 23.11
updateDate ApiEntityProjectActualsLineItemInput Project Actuals Line Item 23.11
costValue ApiEntityBudgetChangeConfiguredFieldValueInput Project Budget Change 23.11
costValueWorkspace1 ApiEntityBudgetChangeConfiguredFieldValueInput Project Budget Change 23.11
costValueWorkspace2 ApiEntityBudgetChangeConfiguredFieldValueInput Project Budget Change 23.11
costValueWorkspace3 ApiEntityBudgetChangeConfiguredFieldValueInput Project Budget Change 23.11
exceptionMessage ApiEntityBudgetChangeConfiguredFieldValueInput Project Budget Change 23.11
hasException ApiEntityBudgetChangeConfiguredFieldValueInput Project Budget Change 23.11
link ApiEntityBudgetChangeConfiguredFieldValueInput Project Budget Change 23.11
updateDate ApiEntityBudgetChangeConfiguredFieldValueInput Project Budget Change 23.11
approveByUserId ApiEntityBudgetChangeInput Project Budget Change 23.11
approveByUserName ApiEntityBudgetChangeInput Project Budget Change 23.11
approveDate ApiEntityBudgetChangeInput Project Budget Change 23.11
budgetChangeCost ApiEntityBudgetChangeInput Project Budget Change 23.11
lastModifiedById ApiEntityBudgetChangeInput Project Budget Change 23.11
link ApiEntityBudgetChangeInput Project Budget Change 23.11
rejectByUserId ApiEntityBudgetChangeInput Project Budget Change 23.11
rejectByUserName ApiEntityBudgetChangeInput Project Budget Change 23.11
rejectDate ApiEntityBudgetChangeInput Project Budget Change 23.11
submitByUserId ApiEntityBudgetChangeInput Project Budget Change 23.11
submitByUserName ApiEntityBudgetChangeInput Project Budget Change 23.11
submitDate ApiEntityBudgetChangeInput Project Budget Change 23.11
updateDate ApiEntityBudgetChangeInput Project Budget Change 23.11
withdrawApprovalByUserId ApiEntityBudgetChangeInput Project Budget Change 23.11
withdrawApprovalByUserName ApiEntityBudgetChangeInput Project Budget Change 23.11
withdrawApprovalDate ApiEntityBudgetChangeInput Project Budget Change 23.11
approveDate ApiEntityBudgetChangeTransactionInput Project Budget Change 23.11
budgetHours ApiEntityBudgetChangeTransactionInput Project Budget Change 23.11
changeMode ApiEntityBudgetChangeTransactionInput Project Budget Change 23.11
itemCodeSuffix ApiEntityBudgetChangeTransactionInput Project Budget Change 23.11
link ApiEntityBudgetChangeTransactionInput Project Budget Change 23.11
transactionType ApiEntityBudgetChangeTransactionInput Project Budget Change 23.11
updateDate ApiEntityBudgetChangeTransactionInput Project Budget Change 23.11
budgetTransactionId ApiEntityBudgetTransactionConfiguredFieldValueInput Project Budget Change, Project Budget Transfer 23.11
costValue ApiEntityBudgetTransactionConfiguredFieldValueInput Project Budget Change, Project Budget Transfer 23.11
costValueWorkspace1 ApiEntityBudgetTransactionConfiguredFieldValueInput Project Budget Change, Project Budget Transfer 23.11
costValueWorkspace2 ApiEntityBudgetTransactionConfiguredFieldValueInput Project Budget Change, Project Budget Transfer 23.11
costValueWorkspace3 ApiEntityBudgetTransactionConfiguredFieldValueInput Project Budget Change, Project Budget Transfer 23.11
exceptionMessage ApiEntityBudgetTransactionConfiguredFieldValueInput Project Budget Change, Project Budget Transfer 23.11
hasException ApiEntityBudgetTransactionConfiguredFieldValueInput Project Budget Change, Project Budget Transfer 23.11
link ApiEntityBudgetTransactionConfiguredFieldValueInput Project Budget Change, Project Budget Transfer 23.11
updateDate ApiEntityBudgetTransactionConfiguredFieldValueInput Project Budget Change, Project Budget Transfer 23.11
amountCost amountCostProject ApiEntityBudgetTransactionCostInput Project Budget Change, Project Budget Transfer 23.11
amountCostWorkspace1 amountCostProject ApiEntityBudgetTransactionCostInput Project Budget Change, Project Budget Transfer 23.11
amountCostWorkspace2 amountCostProject ApiEntityBudgetTransactionCostInput Project Budget Change, Project Budget Transfer 23.11
amountCostWorkspace3 amountCostProject ApiEntityBudgetTransactionCostInput Project Budget Change, Project Budget Transfer 23.11
currentCost ApiEntityBudgetTransactionCostInput Project Budget Change, Project Budget Transfer 23.11
currentCostProject ApiEntityBudgetTransactionCostInput Project Budget Change, Project Budget Transfer 23.11
currentCostWorkspace1 ApiEntityBudgetTransactionCostInput Project Budget Change, Project Budget Transfer 23.11
currentCostWorkspace2 ApiEntityBudgetTransactionCostInput Project Budget Change, Project Budget Transfer 23.11
currentCostWorkspace3 ApiEntityBudgetTransactionCostInput Project Budget Change, Project Budget Transfer 23.11
laborRate laborRateProject ApiEntityBudgetTransactionCostInput Project Budget Change, Project Budget Transfer 23.11
laborRateWorkspace1 laborRateProject ApiEntityBudgetTransactionCostInput Project Budget Change, Project Budget Transfer 23.11
laborRateWorkspace2 laborRateProject ApiEntityBudgetTransactionCostInput Project Budget Change, Project Budget Transfer 23.11
laborRateWorkspace3 laborRateProject ApiEntityBudgetTransactionCostInput Project Budget Change, Project Budget Transfer 23.11
link ApiEntityBudgetTransactionCostInput Project Budget Change, Project Budget Transfer 23.11
unitRate unitRateProject ApiEntityBudgetTransactionCostInput Project Budget Change, Project Budget Transfer 23.11
unitRateWorkspace1 unitRateProject ApiEntityBudgetTransactionCostInput Project Budget Change, Project Budget Transfer 23.11
unitRateWorkspace2 unitRateProject ApiEntityBudgetTransactionCostInput Project Budget Change, Project Budget Transfer 23.11
unitRateWorkspace3 unitRateProject ApiEntityBudgetTransactionCostInput Project Budget Change, Project Budget Transfer 23.11
updateDate ApiEntityBudgetTransactionCostInput Project Budget Change, Project Budget Transfer 23.11
costValue ApiEntityBudgetItemConfiguredFieldValueInput Project Budget Item 23.11
costValueWorkspace1 ApiEntityBudgetItemConfiguredFieldValueInput Project Budget Item 23.11
costValueWorkspace2 ApiEntityBudgetItemConfiguredFieldValueInput Project Budget Item 23.11
costValueWorkspace3 ApiEntityBudgetItemConfiguredFieldValueInput Project Budget Item 23.11
exceptionMessage ApiEntityBudgetItemConfiguredFieldValueInput Project Budget Item 23.11
hasException ApiEntityBudgetItemConfiguredFieldValueInput Project Budget Item 23.11
link ApiEntityBudgetItemConfiguredFieldValueInput Project Budget Item 23.11
updateDate ApiEntityBudgetItemConfiguredFieldValueInput Project Budget Item 23.11
currentCost ApiEntityBudgetItemCostInput Project Budget Item 23.11
currentCostProject ApiEntityBudgetItemCostInput Project Budget Item 23.11
currentCostWorkspace1 ApiEntityBudgetItemCostInput Project Budget Item 23.11
currentCostWorkspace2 ApiEntityBudgetItemCostInput Project Budget Item 23.11
currentCostWorkspace3 ApiEntityBudgetItemCostInput Project Budget Item 23.11
laborRate laborRateProject ApiEntityBudgetItemCostInput Project Budget Item 23.11
laborRateWorkspace1 laborRateProject ApiEntityBudgetItemCostInput Project Budget Item 23.11
laborRateWorkspace2 laborRateProject ApiEntityBudgetItemCostInput Project Budget Item 23.11
laborRateWorkspace3 laborRateProject ApiEntityBudgetItemCostInput Project Budget Item 23.11
link ApiEntityBudgetItemCostInput Project Budget Item 23.11
originalCost originalCostProject ApiEntityBudgetItemCostInput Project Budget Item 23.11
originalCostWorkspace1 originalCostProject ApiEntityBudgetItemCostInput Project Budget Item 23.11
originalCostWorkspace2 originalCostProject ApiEntityBudgetItemCostInput Project Budget Item 23.11
originalCostWorkspace3 originalCostProject ApiEntityBudgetItemCostInput Project Budget Item 23.11
unitRate unitRateProject ApiEntityBudgetItemCostInput Project Budget Item 23.11
unitRateWorkspace1 unitRateProject ApiEntityBudgetItemCostInput Project Budget Item 23.11
unitRateWorkspace2 unitRateProject ApiEntityBudgetItemCostInput Project Budget Item 23.11
unitRateWorkspace3 unitRateProject ApiEntityBudgetItemCostInput Project Budget Item 23.11
updateDate ApiEntityBudgetItemCostInput Project Budget Item 23.11
budgetChangeId ApiEntityBudgetItemInput Project Budget Item 23.11
budgetHours ApiEntityBudgetItemInput Project Budget Item 23.11
itemSuffix ApiEntityBudgetItemInput Project Budget Item 23.11
link ApiEntityBudgetItemInput Project Budget Item 23.11
updateDate ApiEntityBudgetItemInput Project Budget Item 23.11
budgetChangeId ApiEntityExternallySourcedBudgetItemInput Project Budget Item 23.11
budgetHours ApiEntityExternallySourcedBudgetItemInput Project Budget Item 23.11
itemSuffix ApiEntityExternallySourcedBudgetItemInput Project Budget Item 23.11
link ApiEntityExternallySourcedBudgetItemInput Project Budget Item 23.11
updateDate ApiEntityExternallySourcedBudgetItemInput Project Budget Item 23.11
costValue ApiEntityBudgetTransferConfiguredFieldValueInput Project Budget Transfer 23.11
costValueWorkspace1 ApiEntityBudgetTransferConfiguredFieldValueInput Project Budget Transfer 23.11
costValueWorkspace2 ApiEntityBudgetTransferConfiguredFieldValueInput Project Budget Transfer 23.11
costValueWorkspace3 ApiEntityBudgetTransferConfiguredFieldValueInput Project Budget Transfer 23.11
exceptionMessage ApiEntityBudgetTransferConfiguredFieldValueInput Project Budget Transfer 23.11
hasException ApiEntityBudgetTransferConfiguredFieldValueInput Project Budget Transfer 23.11
link ApiEntityBudgetTransferConfiguredFieldValueInput Project Budget Transfer 23.11
updateDate ApiEntityBudgetTransferConfiguredFieldValueInput Project Budget Transfer 23.11
approveByUserId ApiEntityBudgetTransferInput Project Budget Transfer 23.11
approveByUserName ApiEntityBudgetTransferInput Project Budget Transfer 23.11
approveDate ApiEntityBudgetTransferInput Project Budget Transfer 23.11
itemPrefix ApiEntityBudgetTransferInput Project Budget Transfer 23.11
itemSuffix ApiEntityBudgetTransferInput Project Budget Transfer 23.11
lastModifiedById ApiEntityBudgetTransferInput Project Budget Transfer 23.11
link ApiEntityBudgetTransferInput Project Budget Transfer 23.11
rejectByUserId ApiEntityBudgetTransferInput Project Budget Transfer 23.11
rejectByUserName ApiEntityBudgetTransferInput Project Budget Transfer 23.11
rejectDate ApiEntityBudgetTransferInput Project Budget Transfer 23.11
submitByUserId ApiEntityBudgetTransferInput Project Budget Transfer 23.11
submitByUserName ApiEntityBudgetTransferInput Project Budget Transfer 23.11
submitDate ApiEntityBudgetTransferInput Project Budget Transfer 23.11
updateDate ApiEntityBudgetTransferInput Project Budget Transfer 23.11
withdrawApprovalByUserId ApiEntityBudgetTransferInput Project Budget Transfer 23.11
withdrawApprovalByUserName ApiEntityBudgetTransferInput Project Budget Transfer 23.11
withdrawApprovalDate ApiEntityBudgetTransferInput Project Budget Transfer 23.11
approveDate ApiEntityBudgetTransferTransactionInput Project Budget Transfer 23.11
budgetCbsSheetCodeId ApiEntityBudgetTransferTransactionInput Project Budget Transfer 23.11
budgetCostCategoryId ApiEntityBudgetTransferTransactionInput Project Budget Transfer 23.11
budgetHours ApiEntityBudgetTransferTransactionInput Project Budget Transfer 23.11
budgetItemName ApiEntityBudgetTransferTransactionInput Project Budget Transfer 23.11
itemCodeSuffix ApiEntityBudgetTransferTransactionInput Project Budget Transfer 23.11
link ApiEntityBudgetTransferTransactionInput Project Budget Transfer 23.11
status ApiEntityBudgetTransferTransactionInput Project Budget Transfer 23.11
transferFromCBSId ApiEntityBudgetTransferTransactionInput Project Budget Transfer 23.11
transferFromCostCategoryId ApiEntityBudgetTransferTransactionInput Project Budget Transfer 23.11
transferToCBSId ApiEntityBudgetTransferTransactionInput Project Budget Transfer 23.11
transferToCostCategoryId ApiEntityBudgetTransferTransactionInput Project Budget Transfer 23.11
updateDate ApiEntityBudgetTransferTransactionInput Project Budget Transfer 23.11
link ApiEntityProjectCompanyInput Project Company 24.5
updateDate ApiEntityProjectCompanyInput Project Company 24.5
link ApiEntityProjectDependencyInput Project Dependency 24.5
updateDate ApiEntityProjectDependencyInput Project Dependency 24.5
categoryScore ApiEntityProjectRankInput Project Rank 23.11
link ApiEntityProjectRankInput Project Rank 23.11
subCategoryScore ApiEntityProjectRankInput Project Rank 23.11
updateDate ApiEntityProjectRankInput Project Rank 23.11
link ApiEntityProjectResourceWorkRateCostInput Project Resource Work Rate 23.11
pricePerUnit1 ApiEntityProjectResourceWorkRateCostInput Project Resource Work Rate 23.11
pricePerUnit2 ApiEntityProjectResourceWorkRateCostInput Project Resource Work Rate 23.11
pricePerUnit3 ApiEntityProjectResourceWorkRateCostInput Project Resource Work Rate 23.11
pricePerUnit4 ApiEntityProjectResourceWorkRateCostInput Project Resource Work Rate 23.11
pricePerUnit5 ApiEntityProjectResourceWorkRateCostInput Project Resource Work Rate 23.11
projectResourceWorkRateId ApiEntityProjectResourceWorkRateCostInput Project Resource Work Rate 23.11
updateDate ApiEntityProjectResourceWorkRateCostInput Project Resource Work Rate 23.11
link ApiEntityProjectResourceWorkRateInput Project Resource Work Rate 23.11
updateDate ApiEntityProjectResourceWorkRateInput Project Resource Work Rate 23.11
codeTypeName ApiEntityCodeValueRiskInput Project Risk 23.11
link ApiEntityCodeValueRiskInput Project Risk 23.11
sequenceNumber ApiEntityCodeValueRiskInput Project Risk 23.11
updateDate ApiEntityCodeValueRiskInput Project Risk 23.11
cbsCodes ApiEntityProjectRisk Project Risk 23.11
costValue ApiEntityProjectRiskConfiguredFieldValueInput Project Risk 23.11
costValueWorkspace1 ApiEntityProjectRiskConfiguredFieldValueInput Project Risk 23.11
costValueWorkspace2 ApiEntityProjectRiskConfiguredFieldValueInput Project Risk 23.11
costValueWorkspace3 ApiEntityProjectRiskConfiguredFieldValueInput Project Risk 23.11
exceptionMessage ApiEntityProjectRiskConfiguredFieldValueInput Project Risk 23.11
hasException ApiEntityProjectRiskConfiguredFieldValueInput Project Risk 23.11
link ApiEntityProjectRiskConfiguredFieldValueInput Project Risk 23.11
updateDate ApiEntityProjectRiskConfiguredFieldValueInput Project Risk 23.11
actualResponseCost ApiEntityProjectRiskFinancialInput Project Risk 23.11
actualResponseCostProject ApiEntityProjectRiskFinancialInput Project Risk 23.11
atCompletionTotalResponseCost ApiEntityProjectRiskFinancialInput Project Risk 23.11
link ApiEntityProjectRiskFinancialInput Project Risk 23.11
postActualResponseCost ApiEntityProjectRiskFinancialInput Project Risk 23.11
postAtCompletionTotalResponseCost ApiEntityProjectRiskFinancialInput Project Risk 23.11
postExposureCost ApiEntityProjectRiskFinancialInput Project Risk 23.11
postExposureCostProject ApiEntityProjectRiskFinancialInput Project Risk 23.11
postQuantifiedCostThreshold ApiEntityProjectRiskFinancialInput Project Risk 23.11
postRemainingTotalResponseCost ApiEntityProjectRiskFinancialInput Project Risk 23.11
postResponseExposureWorkspace1 ApiEntityProjectRiskFinancialInput Project Risk 23.11
postResponseExposureWorkspace2 ApiEntityProjectRiskFinancialInput Project Risk 23.11
postResponseExposureWorkspace3 ApiEntityProjectRiskFinancialInput Project Risk 23.11
preActualResponseCost ApiEntityProjectRiskFinancialInput Project Risk 23.11
preAtCompletionTotalResponseCost ApiEntityProjectRiskFinancialInput Project Risk 23.11
preExposureCost ApiEntityProjectRiskFinancialInput Project Risk 23.11
preExposureCostProject ApiEntityProjectRiskFinancialInput Project Risk 23.11
preQuantifiedCostThreshold ApiEntityProjectRiskFinancialInput Project Risk 23.11
preRemainingTotalResponseCost ApiEntityProjectRiskFinancialInput Project Risk 23.11
preResponseExposureWorkspace1 ApiEntityProjectRiskFinancialInput Project Risk 23.11
preResponseExposureWorkspace2 ApiEntityProjectRiskFinancialInput Project Risk 23.11
preResponseExposureWorkspace3 ApiEntityProjectRiskFinancialInput Project Risk 23.11
remainingTotalResponseCost ApiEntityProjectRiskFinancialInput Project Risk 23.11
updateDate ApiEntityProjectRiskFinancialInput Project Risk 23.11
activityImpactQuantified ApiEntityProjectRiskInput Project Risk 23.11
exposureFinishDate ApiEntityProjectRiskInput Project Risk 23.11
exposureStartDate ApiEntityProjectRiskInput Project Risk 23.11
link ApiEntityProjectRiskInput Project Risk 23.11
postResponseMeanCostImpact ApiEntityProjectRiskInput Project Risk 23.11
postResponseMeanDelay ApiEntityProjectRiskInput Project Risk 23.11
postResponsePessimisticCostDeltaAbs ApiEntityProjectRiskInput Project Risk 23.11
postResponsePessimisticFinishDeltaAbs ApiEntityProjectRiskInput Project Risk 23.11
postScore ApiEntityProjectRiskInput Project Risk 23.11
preResponseMeanCostImpact ApiEntityProjectRiskInput Project Risk 23.11
preResponseMeanDelay ApiEntityProjectRiskInput Project Risk 23.11
preResponsePessimisticCostDeltaAbs ApiEntityProjectRiskInput Project Risk 23.11
preResponsePessimisticFinishDeltaAbs ApiEntityProjectRiskInput Project Risk 23.11
quantifiedPostResponseProbabilityThreshold ApiEntityProjectRiskInput Project Risk 23.11
quantifiedPostResponseScheduleThreshold ApiEntityProjectRiskInput Project Risk 23.11
quantifiedProbabilityThreshold ApiEntityProjectRiskInput Project Risk 23.11
quantifiedScheduleThreshold ApiEntityProjectRiskInput Project Risk 23.11
riskSourceType ApiEntityProjectRiskInput Project Risk 23.11
score ApiEntityProjectRiskInput Project Risk 23.11
updateDate ApiEntityProjectRiskInput Project Risk 23.11
link ApiEntityRiskImpactInput Project Risk 23.11
projectCode ApiEntityRiskImpactInput Project Risk 23.11
riskCode ApiEntityRiskImpactInput Project Risk 23.11
updateDate ApiEntityRiskImpactInput Project Risk 23.11
workspaceCode ApiEntityRiskImpactInput Project Risk 23.11
link ApiEntityRiskQuantifiedCostImpactInput Project Risk 23.11
postResponseMaximumProject postResponseMaximum ApiEntityRiskQuantifiedCostImpactInput Project Risk 23.11
postResponseMaximumWorkspace1 postResponseMaximum ApiEntityRiskQuantifiedCostImpactInput Project Risk 23.11
postResponseMaximumWorkspace2 postResponseMaximum ApiEntityRiskQuantifiedCostImpactInput Project Risk 23.11
postResponseMaximumWorkspace3 postResponseMaximum ApiEntityRiskQuantifiedCostImpactInput Project Risk 23.11
postResponseMinimumProject postResponseMinimum ApiEntityRiskQuantifiedCostImpactInput Project Risk 23.11
postResponseMinimumWorkspace1 postResponseMinimum ApiEntityRiskQuantifiedCostImpactInput Project Risk 23.11
postResponseMinimumWorkspace2 postResponseMinimum ApiEntityRiskQuantifiedCostImpactInput Project Risk 23.11
postResponseMinimumWorkspace3 postResponseMinimum ApiEntityRiskQuantifiedCostImpactInput Project Risk 23.11
postResponseMostLikelyProject postResponseMostLikely ApiEntityRiskQuantifiedCostImpactInput Project Risk 23.11
postResponseMostLikelyWorkspace1 postResponseMostLikely ApiEntityRiskQuantifiedCostImpactInput Project Risk 23.11
postResponseMostLikelyWorkspace2 postResponseMostLikely ApiEntityRiskQuantifiedCostImpactInput Project Risk 23.11
postResponseMostLikelyWorkspace3 postResponseMostLikely ApiEntityRiskQuantifiedCostImpactInput Project Risk 23.11
preResponseMaximumProject preResponseMaximum ApiEntityRiskQuantifiedCostImpactInput Project Risk 23.11
preResponseMaximumWorkspace1 preResponseMaximum ApiEntityRiskQuantifiedCostImpactInput Project Risk 23.11
preResponseMaximumWorkspace2 preResponseMaximum ApiEntityRiskQuantifiedCostImpactInput Project Risk 23.11
preResponseMaximumWorkspace3 preResponseMaximum ApiEntityRiskQuantifiedCostImpactInput Project Risk 23.11
preResponseMinimumProject preResponseMinimum ApiEntityRiskQuantifiedCostImpactInput Project Risk 23.11
preResponseMinimumWorkspace1 preResponseMinimum ApiEntityRiskQuantifiedCostImpactInput Project Risk 23.11
preResponseMinimumWorkspace2 preResponseMinimum ApiEntityRiskQuantifiedCostImpactInput Project Risk 23.11
preResponseMinimumWorkspace3 preResponseMinimum ApiEntityRiskQuantifiedCostImpactInput Project Risk 23.11
preResponseMostLikelyProject preResponseMostLikely ApiEntityRiskQuantifiedCostImpactInput Project Risk 23.11
preResponseMostLikelyWorkspace1 preResponseMostLikely ApiEntityRiskQuantifiedCostImpactInput Project Risk 23.11
preResponseMostLikelyWorkspace2 preResponseMostLikely ApiEntityRiskQuantifiedCostImpactInput Project Risk 23.11
preResponseMostLikelyWorkspace3 preResponseMostLikely ApiEntityRiskQuantifiedCostImpactInput Project Risk 23.11
updateDate ApiEntityRiskQuantifiedCostImpactInput Project Risk 23.11
link ApiEntityRiskQuantifiedOtherImpactInput Project Risk 23.11
updateDate ApiEntityRiskQuantifiedOtherImpactInput Project Risk 23.11
atCompletionTotalCost ApiEntityRiskMitigationFinancialInput Project Risk Mitigation 23.11
link ApiEntityRiskMitigationFinancialInput Project Risk Mitigation 23.11
postResponseActualCost ApiEntityRiskMitigationFinancialInput Project Risk Mitigation 23.11
postResponseAtCompletionTotalCost ApiEntityRiskMitigationFinancialInput Project Risk Mitigation 23.11
postResponseRemainingTotalCost ApiEntityRiskMitigationFinancialInput Project Risk Mitigation 23.11
preResponseActualCost ApiEntityRiskMitigationFinancialInput Project Risk Mitigation 23.11
preResponseAtCompletionCost ApiEntityRiskMitigationFinancialInput Project Risk Mitigation 23.11
preResponseRemainingTotalCost ApiEntityRiskMitigationFinancialInput Project Risk Mitigation 23.11
updateDate ApiEntityRiskMitigationFinancialInput Project Risk Mitigation 23.11
link ApiEntityRiskMitigationInput Project Risk Mitigation 23.11
projectName ApiEntityRiskMitigationInput Project Risk Mitigation 23.11
updateDate ApiEntityRiskMitigationInput Project Risk Mitigation 23.11
link ApiEntityRiskWeatherPeriodInput Project Risk Weather Period 24.4
updateDate ApiEntityRiskWeatherPeriodInput Project Risk Weather Period 24.4
associationType ApiEntityReasonInput Reason 23.12
link ApiEntityReasonInput Reason 23.11
updateDate ApiEntityReasonInput Reason 23.11
link ApiEntityEntityReferenceInput Related Items 24.4
updateDate ApiEntityEntityReferenceInput Related Items 24.4
link ApiEntityRelationshipInput Relationship 23.11
updateDate ApiEntityRelationshipInput Relationship 23.11
associationType ApiEntityReportCycleInput Report Cycle 24.4
link ApiEntityReportCycleInput Report Cycle 24.4
updateDate ApiEntityReportCycleInput Report Cycle 24.4
codeTypeName ApiEntityCodeValueResourceInput Resource 23.11
link ApiEntityCodeValueResourceInput Resource 23.11
sequenceNumber ApiEntityCodeValueResourceInput Resource 23.11
updateDate ApiEntityCodeValueResourceInput Resource 23.11
associationType ApiEntityExternallySourcedResourceInput Resource 24.4
calendarName ApiEntityExternallySourcedResourceInput Resource 24.4
link ApiEntityExternallySourcedResourceInput Resource 23.11
projectAssociationType ApiEntityExternallySourcedResourceInput Resource 24.4
updateDate ApiEntityExternallySourcedResourceInput Resource 24.4
workspaceName ApiEntityExternallySourcedResourceInput Resource 24.4
associationType ApiEntityResourceInput Resource 24.4
calendarName ApiEntityResourceInput Resource 24.4
link ApiEntityResourceInput Resource 23.11
projectAssociationType ApiEntityResourceInput Resource 24.4
updateDate ApiEntityResourceInput Resource 24.4
workspaceName ApiEntityResourceInput Resource 24.4
link ApiEntityResourceDemandCostInput Resource Demand 23.11
updateDate ApiEntityResourceDemandCostInput Resource Demand 23.11
link ApiEntityResourceDemandDataCostInput Resource Demand 23.11
updateDate ApiEntityResourceDemandDataCostInput Resource Demand 23.11
link ApiEntityResourceDemandDataInput Resource Demand 23.11
resourceDemandDataCost ApiEntityResourceDemandDataInput Resource Demand 24.4
updateDate ApiEntityResourceDemandDataInput Resource Demand 23.11
link ApiEntityResourceDemandInput Resource Demand 23.11
resourceDemandCost ApiEntityResourceDemandInput Resource Demand 24.4
updateDate ApiEntityResourceDemandInput Resource Demand 23.11
link ApiEntityResourceRoleAssignmentInput Resource Role Assignment 23.11
updateDate ApiEntityResourceRoleAssignmentInput Resource Role Assignment 23.11
link ApiEntityResourceWorkRateCostInput Resource Work Rate 23.11
updateDate ApiEntityResourceWorkRateCostInput Resource Work Rate 23.11
link ApiEntityResourceWorkRateInput Resource Work Rate 23.11
updateDate ApiEntityResourceWorkRateInput Resource Work Rate 23.11
associationType ApiEntityRiskMatrixInput Risk Matrix 24.4
impactLevels ApiEntityRiskMatrixInput Risk Matrix 24.4
link ApiEntityRiskMatrixInput Risk Matrix 24.4
probabilityLevels ApiEntityRiskMatrixInput Risk Matrix 24.4
referencedRiskMatrixId ApiEntityRiskMatrixInput Risk Matrix 24.4
updateDate ApiEntityRiskMatrixInput Risk Matrix 24.4
link ApiEntityRiskMatrixScoreInput Risk Matrix 24.4
matrixName ApiEntityRiskMatrixScoreInput Risk Matrix 24.4
updateDate ApiEntityRiskMatrixScoreInput Risk Matrix 24.4
link ApiEntityRiskMatrixScoreTypeInput Risk Matrix 24.4
matrixName ApiEntityRiskMatrixScoreTypeInput Risk Matrix 24.4
riskScoreType ApiEntityRiskMatrixScoreTypeInput Risk Matrix 24.4
updateDate ApiEntityRiskMatrixScoreTypeInput Risk Matrix 24.4
link ApiEntityRiskMatrixToleranceInput Risk Matrix 24.4
riskMatrixName ApiEntityRiskMatrixToleranceInput Risk Matrix 24.4
updateDate ApiEntityRiskMatrixToleranceInput Risk Matrix 24.4
link ApiEntityRiskScoreThresholdInput Risk Score Type 24.4
riskScoreTypeName ApiEntityRiskScoreThresholdInput Risk Score Type 24.4
updateDate ApiEntityRiskScoreThresholdInput Risk Score Type 24.4
associationType ApiEntityRiskScoreTypeInput Risk Score Type 24.4
link ApiEntityRiskScoreTypeInput Risk Score Type 24.4
referencedScoreTypeId ApiEntityRiskScoreTypeInput Risk Score Type 24.4
updateDate ApiEntityRiskScoreTypeInput Risk Score Type 24.4
associationType ApiEntityRuleOfCreditInput Rule Of Credit 23.12
link ApiEntityRuleOfCreditInput Rule Of Credit 23.11
updateDate ApiEntityRuleOfCreditInput Rule Of Credit 23.11
link ApiEntityRuleOfCreditMilestoneInput Rule Of Credit 23.12
updateDate ApiEntityRuleOfCreditMilestoneInput Rule Of Credit 23.12
actualsCost ApiEntityScopeAssignmentActualsTimePhasedCostDataInput Scope Assignment Actuals Time Phased Data 24.5
link ApiEntityScopeAssignmentActualsTimePhasedCostDataInput Scope Assignment Actuals Time Phased Data 24.5
updateDate ApiEntityScopeAssignmentActualsTimePhasedCostDataInput Scope Assignment Actuals Time Phased Data 24.5
link ApiEntityScopeAssignmentActualsTimePhasedDataInput Scope Assignment Actuals Time Phased Data 24.5
updateDate ApiEntityScopeAssignmentActualsTimePhasedDataInput Scope Assignment Actuals Time Phased Data 24.5
installedCost ApiEntityScopeAssignmentInstalledTimePhasedCostDataInput Scope Assignment Installed Time Phased Data 24.5
link ApiEntityScopeAssignmentInstalledTimePhasedCostDataInput Scope Assignment Installed Time Phased Data 24.5
updateDate ApiEntityScopeAssignmentInstalledTimePhasedCostDataInput Scope Assignment Installed Time Phased Data 24.5
link ApiEntityScopeAssignmentInstalledTimePhasedDataInput Scope Assignment Installed Time Phased Data 24.5
updateDate ApiEntityScopeAssignmentInstalledTimePhasedDataInput Scope Assignment Installed Time Phased Data 24.5
link ApiEntityScopeAssignmentTimePhasedMilestoneInput Scope Assignment Installed Time Phased Data 24.5
updateDate ApiEntityScopeAssignmentTimePhasedMilestoneInput Scope Assignment Installed Time Phased Data 24.5
link ApiEntityScopeAssignmentPlannedTimePhasedCostDataInput Scope Assignment Planned Time Phased Data 24.5
updateDate ApiEntityScopeAssignmentPlannedTimePhasedCostDataInput Scope Assignment Planned Time Phased Data 24.5
link ApiEntityScopeAssignmentPlannedTimePhasedDataInput Scope Assignment Planned Time Phased Data 24.5
updateDate ApiEntityScopeAssignmentPlannedTimePhasedDataInput Scope Assignment Planned Time Phased Data 24.5
codeTypeName ApiEntityCodeValueScopeItemInput Scope Item 23.11
link ApiEntityCodeValueScopeItemInput Scope Item 23.11
sequenceNumber ApiEntityCodeValueScopeItemInput Scope Item 23.11
updateDate ApiEntityCodeValueScopeItemInput Scope Item 23.11
cbsCodes ApiEntityScopeItem Scope Item 23.11
pbsCodeHierarchy ApiEntityScopeItem Scope Item 23.11
costValue ApiEntityScopeItemConfiguredFieldValueInput Scope Item 23.11
costValueWorkspace1 ApiEntityScopeItemConfiguredFieldValueInput Scope Item 23.11
costValueWorkspace2 ApiEntityScopeItemConfiguredFieldValueInput Scope Item 23.11
costValueWorkspace3 ApiEntityScopeItemConfiguredFieldValueInput Scope Item 23.11
exceptionMessage ApiEntityScopeItemConfiguredFieldValueInput Scope Item 23.11
hasException ApiEntityScopeItemConfiguredFieldValueInput Scope Item 23.11
link ApiEntityScopeItemConfiguredFieldValueInput Scope Item 23.11
updateDate ApiEntityScopeItemConfiguredFieldValueInput Scope Item 23.11
costCategoryType ApiEntityScopeItemInput Scope Item 23.11
link ApiEntityScopeItemInput Scope Item 23.11
pbsCode ApiEntityScopeItemInput Scope Item 23.11
updateDate ApiEntityScopeItemInput Scope Item 23.11
codeTypeName ApiEntityCodeValueScopeItemAssignmentInput Scope Item Assignment 23.11
link ApiEntityCodeValueScopeItemAssignmentInput Scope Item Assignment 23.11
sequenceNumber ApiEntityCodeValueScopeItemAssignmentInput Scope Item Assignment 23.11
updateDate ApiEntityCodeValueScopeItemAssignmentInput Scope Item Assignment 23.11
cbsCodes ApiEntityScopeItemAssignment Scope Item Assignment 23.11
costValue ApiEntityScopeItemAssignmentConfiguredFieldValueInput Scope Item Assignment 23.11
costValueWorkspace1 ApiEntityScopeItemAssignmentConfiguredFieldValueInput Scope Item Assignment 23.11
costValueWorkspace2 ApiEntityScopeItemAssignmentConfiguredFieldValueInput Scope Item Assignment 23.11
costValueWorkspace3 ApiEntityScopeItemAssignmentConfiguredFieldValueInput Scope Item Assignment 23.11
exceptionMessage ApiEntityScopeItemAssignmentConfiguredFieldValueInput Scope Item Assignment 23.11
hasException ApiEntityScopeItemAssignmentConfiguredFieldValueInput Scope Item Assignment 23.11
link ApiEntityScopeItemAssignmentConfiguredFieldValueInput Scope Item Assignment 23.11
updateDate ApiEntityScopeItemAssignmentConfiguredFieldValueInput Scope Item Assignment 23.11
actualCostToDate ApiEntityScopeItemAssignmentCostInput Scope Item Assignment 23.11
adjustedCost ApiEntityScopeItemAssignmentCostInput Scope Item Assignment 23.11
approvedChangedCost ApiEntityScopeItemAssignmentCostInput Scope Item Assignment 23.11
atCompletionCost ApiEntityScopeItemAssignmentCostInput Scope Item Assignment 23.11
bacCost ApiEntityScopeItemAssignmentCostInput Scope Item Assignment 23.11
baselineCost ApiEntityScopeItemAssignmentCostInput Scope Item Assignment 23.11
currentRate ApiEntityScopeItemAssignmentCostInput Scope Item Assignment 23.11
eacCost ApiEntityScopeItemAssignmentCostInput Scope Item Assignment 23.11
earnedCost ApiEntityScopeItemAssignmentCostInput Scope Item Assignment 23.11
etcCost ApiEntityScopeItemAssignmentCostInput Scope Item Assignment 23.11
installedCost ApiEntityScopeItemAssignmentCostInput Scope Item Assignment 23.11
link ApiEntityScopeItemAssignmentCostInput Scope Item Assignment 23.11
pendingChangedCost ApiEntityScopeItemAssignmentCostInput Scope Item Assignment 23.11
plannedCost ApiEntityScopeItemAssignmentCostInput Scope Item Assignment 23.11
rate ApiEntityScopeItemAssignmentCostInput Scope Item Assignment 23.11
remainingCost ApiEntityScopeItemAssignmentCostInput Scope Item Assignment 23.11
revisedCost ApiEntityScopeItemAssignmentCostInput Scope Item Assignment 23.11
updateDate ApiEntityScopeItemAssignmentCostInput Scope Item Assignment 23.11
costCategoryType ApiEntityScopeItemAssignmentInput Scope Item Assignment 23.11
link ApiEntityScopeItemAssignmentInput Scope Item Assignment 23.11
updateDate ApiEntityScopeItemAssignmentInput Scope Item Assignment 23.11
link ApiEntityScopeItemAssignmentMilestoneInput Scope Item Assignment 23.11
updateDate ApiEntityScopeItemAssignmentMilestoneInput Scope Item Assignment 23.11
link ApiEntityScopeItemAssignmentActivityInput Scope Item Assignment Activity 24.5
updateDate ApiEntityScopeItemAssignmentActivityInput Scope Item Assignment Activity 24.5
link ApiEntityCalcActivitySpreadInput Spreads 23.11
updateDate ApiEntityCalcActivitySpreadInput Spreads 23.11
link ApiEntityCalcAssignmentSpreadInput Spreads 23.11
updateDate ApiEntityCalcAssignmentSpreadInput Spreads 23.11
codeTypeName ApiEntityCodeValueStrategyInput Strategy 23.11
link ApiEntityCodeValueStrategyInput Strategy 23.11
sequenceNumber ApiEntityCodeValueStrategyInput Strategy 23.11
updateDate ApiEntityCodeValueStrategyInput Strategy 23.11
costValue ApiEntityStrategyConfiguredFieldValueInput Strategy 23.11
costValueWorkspace1 ApiEntityStrategyConfiguredFieldValueInput Strategy 23.11
costValueWorkspace2 ApiEntityStrategyConfiguredFieldValueInput Strategy 23.11
costValueWorkspace3 ApiEntityStrategyConfiguredFieldValueInput Strategy 23.11
link ApiEntityStrategyConfiguredFieldValueInput Strategy 23.11
updateDate ApiEntityStrategyConfiguredFieldValueInput Strategy 23.11
link ApiEntityStrategyInput Strategy 23.11
securityGuid ApiEntityStrategyInput Strategy 23.12
updateDate ApiEntityStrategyInput Strategy 23.11
link ApiEntityStrategyMeasureValueXReferenceInput Strategy Measure Manual Value 23.11
updateDate ApiEntityStrategyMeasureValueXReferenceInput Strategy Measure Manual Value 23.11
link ApiEntityStrategyProjectInput Strategy Project 23.11
projectName ApiEntityStrategyProjectInput Strategy Project 23.12
updateDate ApiEntityStrategyProjectInput Strategy Project 23.11
associationType ApiEntityStrategyTypeInput Strategy Type 23.12
link ApiEntityStrategyTypeInput Strategy Type 23.11
updateDate ApiEntityStrategyTypeInput Strategy Type 23.11
link ApiEntityThresholdInput Threshold 23.11
updateDate ApiEntityThresholdInput Threshold 23.11
associationType ApiEntityUnitsOfMeasureInput Unit of Measure 24.5
link ApiEntityUnitsOfMeasureInput Unit of Measure 24.5
updateDate ApiEntityUnitsOfMeasureInput Unit of Measure 24.5
codeTypeName ApiEntityCodeValueWBSInput WBS 23.11
link ApiEntityCodeValueWBSInput WBS 23.11
sequenceNumber ApiEntityCodeValueWBSInput WBS 23.11
updateDate ApiEntityCodeValueWBSInput WBS 23.11
costValue ApiEntityWBSConfiguredFieldValueInput WBS 23.11
costValueWorkspace1 ApiEntityWBSConfiguredFieldValueInput WBS 23.11
costValueWorkspace2 ApiEntityWBSConfiguredFieldValueInput WBS 23.11
costValueWorkspace3 ApiEntityWBSConfiguredFieldValueInput WBS 23.11
exceptionMessage ApiEntityWBSConfiguredFieldValueInput WBS 23.11
hasException ApiEntityWBSConfiguredFieldValueInput WBS 23.11
link ApiEntityWBSConfiguredFieldValueInput WBS 23.11
updateDate ApiEntityWBSConfiguredFieldValueInput WBS 23.11
isDelete ApiEntityWBSInput WBS 23.11
link ApiEntityWBSInput WBS 23.11
parentCode ApiEntityWBSInput WBS 23.11
updateDate ApiEntityWBSInput WBS 23.11
wbsPath ApiEntityWBSInput WBS 23.11
codeTypeName ApiEntityCodeValueWorkManagerTaskInput Work Manager Task 23.11
link ApiEntityCodeValueWorkManagerTaskInput Work Manager Task 23.11
sequenceNumber ApiEntityCodeValueWorkManagerTaskInput Work Manager Task 23.11
updateDate ApiEntityCodeValueWorkManagerTaskInput Work Manager Task 23.11
costValue ApiEntityWorkManagerTaskConfiguredFieldValueInput Work Manager Task 23.11
costValueWorkspace1 ApiEntityWorkManagerTaskConfiguredFieldValueInput Work Manager Task 23.11
costValueWorkspace2 ApiEntityWorkManagerTaskConfiguredFieldValueInput Work Manager Task 23.11
costValueWorkspace3 ApiEntityWorkManagerTaskConfiguredFieldValueInput Work Manager Task 23.11
exceptionMessage ApiEntityWorkManagerTaskConfiguredFieldValueInput Work Manager Task 23.11
hasException ApiEntityWorkManagerTaskConfiguredFieldValueInput Work Manager Task 23.11
link ApiEntityWorkManagerTaskConfiguredFieldValueInput Work Manager Task 23.11
updateDate ApiEntityWorkManagerTaskConfiguredFieldValueInput Work Manager Task 23.11
activityCode ApiEntityWorkManagerTaskInput Work Manager Task 23.12
activityCompleteStatus ApiEntityWorkManagerTaskInput Work Manager Task 23.12
activityDateStatus ApiEntityWorkManagerTaskInput Work Manager Task 23.12
commitmentCount ApiEntityWorkManagerTaskInput Work Manager Task 23.12
constraintCount ApiEntityWorkManagerTaskInput Work Manager Task 23.12
hasCommitments ApiEntityWorkManagerTaskInput Work Manager Task 23.12
hasConstraints ApiEntityWorkManagerTaskInput Work Manager Task 23.12
hasSlack ApiEntityWorkManagerTaskInput Work Manager Task 23.12
isDueThisWeek ApiEntityWorkManagerTaskInput Work Manager Task 23.12
isMissingActivityAssignment ApiEntityWorkManagerTaskInput Work Manager Task 23.12
isOutsideActivity ApiEntityWorkManagerTaskInput Work Manager Task 23.12
isOverdue ApiEntityWorkManagerTaskInput Work Manager Task 23.12
isPending ApiEntityWorkManagerTaskInput Work Manager Task 23.12
isSchNonWorkDays ApiEntityWorkManagerTaskInput Work Manager Task 23.12
isUnassigned ApiEntityWorkManagerTaskInput Work Manager Task 23.12
isUnplanned ApiEntityWorkManagerTaskInput Work Manager Task 23.12
latestCommitmentDueDate ApiEntityWorkManagerTaskInput Work Manager Task 23.12
link ApiEntityWorkManagerTaskInput Work Manager Task 23.11
originalCommitmentDueDate ApiEntityWorkManagerTaskInput Work Manager Task 23.12
predecessorCount ApiEntityWorkManagerTaskInput Work Manager Task 23.12
sequenceNumber ApiEntityWorkManagerTaskInput Work Manager Task 23.12
slack ApiEntityWorkManagerTaskInput Work Manager Task 23.12
startDate ApiEntityWorkManagerTaskInput Work Manager Task 23.12
successorCount ApiEntityWorkManagerTaskInput Work Manager Task 23.12
updateDate ApiEntityWorkManagerTaskInput Work Manager Task 23.11
workManagerTaskCommitments ApiEntityWorkManagerTaskInput Work Manager Task 23.12
activityCode ApiEntityWorkManagerTaskCommitmentInput Work Manager Task Commitment 23.12
addByUserId ApiEntityWorkManagerTaskCommitmentInput Work Manager Task Commitment 23.12
applicationUserId ApiEntityWorkManagerTaskCommitmentInput Work Manager Task Commitment 23.12
createDate ApiEntityWorkManagerTaskCommitmentInput Work Manager Task Commitment 23.12
link ApiEntityWorkManagerTaskCommitmentInput Work Manager Task Commitment 23.11
status ApiEntityWorkManagerTaskCommitmentInput Work Manager Task Commitment 23.12
taskName ApiEntityWorkManagerTaskCommitmentInput Work Manager Task Commitment 23.12
timezoneDateAdded ApiEntityWorkManagerTaskCommitmentInput Work Manager Task Commitment 23.12
updateDate ApiEntityWorkManagerTaskCommitmentInput Work Manager Task Commitment 23.11
codeTypeName ApiEntityCodeValueWorkPackageInput Work Package 23.11
link ApiEntityCodeValueWorkPackageInput Work Package 23.11
sequenceNumber ApiEntityCodeValueWorkPackageInput Work Package 23.11
updateDate ApiEntityCodeValueWorkPackageInput Work Package 23.11
wbsCodes ApiEntityWorkPackage Work Package 23.12
costValue ApiEntityWorkPackageConfiguredFieldValueInput Work Package 23.11
costValueWorkspace1 ApiEntityWorkPackageConfiguredFieldValueInput Work Package 23.11
costValueWorkspace2 ApiEntityWorkPackageConfiguredFieldValueInput Work Package 23.11
costValueWorkspace3 ApiEntityWorkPackageConfiguredFieldValueInput Work Package 23.11
exceptionMessage ApiEntityWorkPackageConfiguredFieldValueInput Work Package 23.11
hasException ApiEntityWorkPackageConfiguredFieldValueInput Work Package 23.11
link ApiEntityWorkPackageConfiguredFieldValueInput Work Package 23.11
updateDate ApiEntityWorkPackageConfiguredFieldValueInput Work Package 23.11
link ApiEntityWorkPackageInput Work Package 23.11
updateDate ApiEntityWorkPackageInput Work Package 23.11
workPackageCost ApiEntityWorkPackageInput Work Package 23.12
link ApiEntityWorkspaceAutonumSettingInput Workspace 23.11
updateDate ApiEntityWorkspaceAutonumSettingInput Workspace 23.11
defaultCurrencyExchangeRate ApiEntityWorkspaceCurrencySettingInput Workspace 23.11
link ApiEntityWorkspaceCurrencySettingInput Workspace 23.11
updateDate ApiEntityWorkspaceCurrencySettingInput Workspace 23.11
workspaceCurrency1ExchangeRate ApiEntityWorkspaceCurrencySettingInput Workspace 23.11
workspaceCurrency1Id ApiEntityWorkspaceCurrencySettingInput Workspace 23.11
workspaceCurrency2ExchangeRate ApiEntityWorkspaceCurrencySettingInput Workspace 23.11
workspaceCurrency2Id ApiEntityWorkspaceCurrencySettingInput Workspace 23.11
workspaceCurrency3ExchangeRate ApiEntityWorkspaceCurrencySettingInput Workspace 23.11
workspaceCurrency3Id ApiEntityWorkspaceCurrencySettingInput Workspace 23.11
workspaceId ApiEntityWorkspaceCurrencySettingInput Workspace 23.11
image ApiEntityWorkspaceInput Workspace 23.11
isProduction ApiEntityWorkspaceInput Workspace 23.11
isSysGenerated ApiEntityWorkspaceInput Workspace 23.11
link ApiEntityWorkspaceInput Workspace 23.11
securityGuid ApiEntityWorkspaceInput Workspace 23.11
sequenceNumber ApiEntityWorkspaceInput Workspace 23.11
updateDate ApiEntityWorkspaceInput Workspace 23.11
workspaceAutonumSettings ApiEntityWorkspaceInput Workspace 23.11
link ApiEntityWorkspaceSettingInput Workspace 23.11
updateDate ApiEntityWorkspaceSettingInput Workspace 23.11
workspaceId ApiEntityWorkspaceSettingInput Workspace 23.11

Entities

ApiEntity Name Tag Name Comments
ApiEntityPortfolioProjectInput Portfolio Project  
ApiEntityProjectAutoNumberInput Project  
ApiEntityProjectImageInput Project  
ApiEntityResourceDemandCostInput Resource Demand  
ApiEntityResourceDemandDataCostInput Resource Demand  
ApiEntityWorkPackageCostInput Work Package  
ApiEntityWorkspaceAutonumSettingInput Workspace