View Cost Category Rows by Cost Category Name and Project
get
/api/restapi/costCategory/categoryRow/costCategory/{costCategoryName}/project/{projectId}
This endpoint returns cost category rows that meet the following requirements:
- The object belongs to a project with an ID value that matches the value of the {projectId} path parameter.
Request
Path Parameters
-
costCategoryName(required): string
The name of a cost category.
-
projectId(required): integer(int64)
Project Id for which cost category row has to be found.
There's no request body for this operation.
Back to TopResponse
Supported Media Types
- application/json
200 Response
Successful operation
Root Schema : List<ApiEntityCBSSheetCategoryRow>
Type:
array
Title:
Show Source
List<ApiEntityCBSSheetCategoryRow>
-
Array of:
object ApiEntityCBSSheetCategoryRow
Title:
ApiEntityCBSSheetCategoryRow
Nested Schema : ApiEntityCBSSheetCategoryRow
Type:
object
Title:
Show Source
ApiEntityCBSSheetCategoryRow
-
actualHoursToDate: number
(double)
The actual hours spent on the scope assignment. This tracks the VOWD (Value of Work Done).
-
approvedChangedHours: number
(double)
The sum of all approved change hours in the change and transfer records for the scope assignment.
-
atCompletionHours: number
(double)
The total hours expected for the scope assignment. Calculated as Revised Hours plus Adjusted Hours.
-
bacHours: number
(double)
The Revised Hours or At Completion Hours at the time the current baseline was set, depending on the selection for the Budget At Completion Method. The Revised Hours of the current project if no baseline is set.
-
baselineHours: number
(double)
The Revised Hours at the time the baseline was set.
-
categoryRowId: integer
(int64)
The unique identifier of a cost sheet row.
-
cbsSheetCodeId: integer
(int64)
The cost breakdown structure code is a code that is concatenated with its parent and child according to the segment definition
-
costCategory: integer
(int64)
The type of cost associated with the budget transfer line item.
-
costCategoryName: string
Minimum Length:
1
Maximum Length:255
The name of the cost category. -
eacHours: number
(double)
Calculated as ETC Hours plus Actual Hours to Date.
-
earnedHours: number
(double)
Calculated as Performance Percent Complete multiplied by BAC Hours.
-
etcHours: number
(double)
The estimated number of hours needed to complete the work. Calculated as BAC Hours minus Earned Hours.
-
installedHours: number
(double)
Hours spent on the scope assignment. Calculated as Installed Quantity multiplied by Revised Productivity Rate.
-
link: string
(url)
Read Only:
true
The self-link to the object. This field is populated only in the responses generated by the batch create APIs. -
pendingChangedHours: number
(double)
Calculated as the sum of all pending hour changes in the change records for the scope assignment.
-
plannedHours: number
(double)
The original expected hours needed to complete all the work required to install the material quantity on the scope assignment. Calculated as Original Quantity multiplied by Original Productivity Rate. Before the baseline is set, this field can be entered manually. A manual entry recalculates the Original Productivity Rate to equal Original Hours divided by Original Quantity.
-
projectActualHours: number
(double)
The actual hours spent on the scope assignment. This tracks the VOWD (Value of Work Done).
-
projectEarnedHours: number
(double)
Calculated as Performance Percent Complete multiplied by BAC Hours.
-
projectHPI: number
(double)
Calculated as the total of Project Earned Hours divided by Project Actual Hours.
-
projectId: integer
(int64)
The unique identifier for the project.
-
remainingHours: number
(double)
The number of hours left for the scope assignment. Calculated as Remaining Quantity multiplied by Revised Productivity Rate.
-
revisedHours: number
(double)
Original Hours before the baseline is set. After the baseline is set, Revised Hours is equal to Original Hours plus Approved Change Hours.
-
rowCost:
rowCost
The Cost Category Row service enables you to view cost category rows.
-
updateDate: string
(date-time)
Read Only:
true
Date when the record was last updated.
Nested Schema : rowCost
The Cost Category Row service enables you to view cost category rows.
Match All
Show Source
-
object
ApiEntityCBSSheetCategoryRowCost
Title:
ApiEntityCBSSheetCategoryRowCost
Nested Schema : ApiEntityCBSSheetCategoryRowCost
Type:
object
Title:
Show Source
ApiEntityCBSSheetCategoryRowCost
-
actualCostToDate: number
(double)
The actual costs incurred on the scope assignment. This tracks the VOWD (Value of Work Done). This field is in base currency and is calculated from actualCostToDateProject field based on the specified exchange rate.
-
actualCostToDateProject: number
(double)
The actual costs incurred on the scope assignment. This tracks the VOWD (Value of Work Done). This value is based on the project currency.
-
actualCostToDateWorkspace1: number
(double)
The actual costs incurred on the scope assignment. This tracks the VOWD (Value of Work Done). Calculated based on the workspace currency.
-
actualCostToDateWorkspace2: number
(double)
The actual costs incurred on the scope assignment. This tracks the VOWD (Value of Work Done). Calculated based on the workspace currency.
-
actualCostToDateWorkspace3: number
(double)
The actual costs incurred on the scope assignment. This tracks the VOWD (Value of Work Done). Calculated based on the workspace currency.
-
actualRiskResponse: number
(double)
The actual cost of responding to a risk. This field is in base currency and is calculated from actualRiskResponseProject field based on the specified exchange rate.
-
actualRiskResponseProject: number
(double)
The actual cost of implementing a response action. This value is based on the project currency.
-
actualRiskResponseWorkspace1: number
(double)
The actual cost of implementing a response action.
-
actualRiskResponseWorkspace2: number
(double)
The actual cost of implementing a response action.
-
actualRiskResponseWorkspace3: number
(double)
The actual cost of implementing a response action.
-
adjustedCost: number
(double)
The amount the scope assignment work that is not yet accounted for. For example, you might enter a value to represent pending change requests that are likely to be approved. This field is in base currency and is calculated from adjustedCostProject field based on the specified exchange rate.
-
adjustedCostProject: number
(double)
The amount the scope assignment work that is not yet accounted for. For example, you might enter a value to represent pending change requests that are likely to be approved. This value is based on the project currency.
-
adjustedCostWorkspace1: number
(double)
The amount of scope assignment work that is not yet accounted for, calculated based on the workspace currency.
-
adjustedCostWorkspace2: number
(double)
The amount of scope assignment work that is not yet accounted for, calculated based on the workspace currency.
-
adjustedCostWorkspace3: number
(double)
The amount of scope assignment work that is not yet accounted for, calculated based on the workspace currency.
-
approvedChangedCost: number
(double)
The sum of all approved cost changes in the change records for the scope assignment. This field is in base currency and is calculated from approvedChangedCostProject field based on the specified exchange rate.
-
approvedChangedCostProject: number
(double)
The sum of all approved cost changes in the change records for the scope assignment. This value is based on the project currency.
-
approvedChangedCostWorkspace1: number
(double)
The sum of all approved cost changes in the change records for the scope assignment, calculated based on the workspace currency.
-
approvedChangedCostWorkspace2: number
(double)
The sum of all approved cost changes in the change records for the scope assignment, calculated based on the workspace currency.
-
approvedChangedCostWorkspace3: number
(double)
The sum of all approved cost changes in the change records for the scope assignment, calculated based on the workspace currency.
-
approvedManualBudget: number
(double)
Calculated as the sum of all costs approved for the original manual budget. This field is in base currency and is calculated from approvedManualBudgetProject field based on the specified exchange rate.
-
approvedManualBudgetChanges: number
(double)
Calculated as the sum of all approved manual budget changes in the change records for the project budget. This field is in base currency and is calculated from approvedManualBudgetChangesProject field based on the specified exchange rate.
-
approvedManualBudgetChangesProject: number
(double)
The approved manual budget changes of a project. This value is based on the project currency.
-
approvedManualBudgetChangesWorkspace1: number
(double)
The approved manual budget changes of a workspace.
-
approvedManualBudgetChangesWorkspace2: number
(double)
The approved manual budget changes of a workspace.
-
approvedManualBudgetChangesWorkspace3: number
(double)
The approved manual budget changes of a workspace.
-
approvedManualBudgetProject: number
(double)
Calculated as the sum of all costs approved for the manual budget. This value is based on the project currency.
-
approvedManualBudgetTransfers: number
(double)
Calculated as the sum of all approved manual budget transfers for the project. This field is in base currency and is calculated from approvedManualBudgetTransfersProject field based on the specified exchange rate.
-
approvedManualBudgetTransfersProject: number
(double)
The approved manual budget transfers of a project. This value is based on the project currency.
-
approvedManualBudgetTransfersWorkspace1: number
(double)
The approved manual budget transfers of a workspace.
-
approvedManualBudgetTransfersWorkspace2: number
(double)
The approved manual budget transfers of a workspace.
-
approvedManualBudgetTransfersWorkspace3: number
(double)
The approved manual budget transfers of a workspace.
-
approvedManualBudgetWorkspace1: number
(double)
Calculated as the sum of all costs approved for the manual budget.
-
approvedManualBudgetWorkspace2: number
(double)
Calculated as the sum of all costs approved for the manual budget.
-
approvedManualBudgetWorkspace3: number
(double)
Calculated as the sum of all costs approved for the manual budget.
-
approvedManualCurrentBudget: number
(double)
The total approved current manual budget of a project. Calculated as the sum of Approved Original Manual Budget plus Approved Manual Budget Changes plus Approved Manual Budget Transfers. This field is in base currency and is calculated from approvedManualCurrentBudgetProject field based on the specified exchange rate.
-
approvedManualCurrentBudgetProject: number
(double)
The approved current manual budget of a project. This value is based on the project currency.
-
approvedManualCurrentBudgetWorkspace1: number
(double)
The approved current manual budget of a workspace.
-
approvedManualCurrentBudgetWorkspace2: number
(double)
The approved current manual budget of a workspace.
-
approvedManualCurrentBudgetWorkspace3: number
(double)
The approved current manual budget of a workspace.
-
approvedProjectActuals: number
(double)
Actuals that have been confirmed. This field is in base currency and is calculated from approvedProjectActualsProject field based on the specified exchange rate.
-
approvedProjectActualsProject: number
(double)
The total amount of confirmed actuals for a project. This value is based on the project currency.
-
approvedProjectActualsWorkspace1: number
(double)
The total amount of confirmed actuals for a workspace.
-
approvedProjectActualsWorkspace2: number
(double)
The total amount of confirmed actuals for a workspace.
-
approvedProjectActualsWorkspace3: number
(double)
The total amount of confirmed actuals for a workspace.
-
atCompletionCost: number
(double)
The total cost at the completion of the scope assignment. Calculated as Revised Cost plus Adjusted Cost. This field is in base currency and is calculated from atCompletionCostProject field based on the specified exchange rate.
-
atCompletionCostProject: number
(double)
The total cost at the completion of the scope assignment. Calculated as Revised Cost plus Adjusted Cost. This value is based on the project currency.
-
atCompletionCostWorkspace1: number
(double)
The total cost at the completion of the scope assignment.
Calculated as Revised Cost plus Adjusted Cost. Calculated based on the workspace currency. -
atCompletionCostWorkspace2: number
(double)
The total cost at the completion of the scope assignment.
Calculated as Revised Cost plus Adjusted Cost. Calculated based on the workspace currency. -
atCompletionCostWorkspace3: number
(double)
The total cost at the completion of the scope assignment.
Calculated as Revised Cost plus Adjusted Cost. Calculated based on the workspace currency. -
bacCost: number
(double)
The Revised Cost or At Completion Cost at the time the current baseline was set, depending on the selection for the Budget at Completion Method. The Revised Cost of the current project if no baseline is set. This field is in base currency and is calculated from bacCostProject field based on the specified exchange rate.
-
bacCostProject: number
(double)
The Revised Cost or At Completion Cost at the time the current baseline was set, depending on the selection for the Budget at Completion Method. The Revised Cost of the current project if no baseline is set. This value is based on the project currency.
-
bacCostWorkspace1: number
(double)
The Revised Cost or At Completion Cost at the time the current baseline was set, depending on the selection for the Budget at Completion Method. The Revised Cost of the current project if no baseline is set, calculated based on the workspace currency.
-
bacCostWorkspace2: number
(double)
The Revised Cost or At Completion Cost at the time the current baseline was set, depending on the selection for the Budget at Completion Method. The Revised Cost of the current project if no baseline is set, calculated based on the workspace currency.
-
bacCostWorkspace3: number
(double)
The Revised Cost or At Completion Cost at the time the current baseline was set, depending on the selection for the Budget at Completion Method. The Revised Cost of the current project if no baseline is set, calculated based on the workspace currency.
-
baselineCost: number
(double)
The Revised Cost at the time the current baseline was set. This field is in base currency and is calculated from baselineCostProject field based on the specified exchange rate.
-
baselineCostProject: number
(double)
The Revised Cost at the time the current baseline was set. This value is based on the project currency.
-
baselineCostWorkspace1: number
(double)
The Revised Cost at the time the current baseline was set, calculated based on the workspace currency.
-
baselineCostWorkspace2: number
(double)
The Revised Cost at the time the current baseline was set, calculated based on the workspace currency.
-
baselineCostWorkspace3: number
(double)
The Revised Cost at the time the current baseline was set, calculated based on the workspace currency.
-
closedPostExposure: number
(double)
The mean post-response probability multiplied by the mean post response cost impact. The status of these risks is closed. This field is in base currency and is calculated from closedPostExposureProject field based on the specified exchange rate.
-
closedPostExposureProject: number
(double)
The mean post-response probability of a closed risk multiplied by the mean post-response probability of the risk. This value is based on the project currency.
-
closedPostExposureWorkspace1: number
(double)
The mean post-response probability of a closed risk multiplied by the mean post-response probability of the risk.
-
closedPostExposureWorkspace2: number
(double)
The mean post-response probability of a closed risk multiplied by the mean post-response probability of the risk.
-
closedPostExposureWorkspace3: number
(double)
The mean post-response probability of a closed risk multiplied by the mean post-response probability of the risk.
-
closedPreExposure: number
(double)
The mean pre-response probability multiplied by the pre-response mean cost impact. The status of these risks is closed. This field is in base currency and is calculated from closedPreExposureProject field based on the specified exchange rate.
-
closedPreExposureProject: number
(double)
The mean pre-response probability of a closed risk multiplied by the mean pre-response cost impact of the risk. This value is based on the project currency.
-
closedPreExposureWorkspace1: number
(double)
The mean pre-response probability of a closed risk multiplied by the mean pre-response cost impact of the risk.
-
closedPreExposureWorkspace2: number
(double)
The mean pre-response probability of a closed risk multiplied by the mean pre-response cost impact of the risk.
-
closedPreExposureWorkspace3: number
(double)
The mean pre-response probability of a closed risk multiplied by the mean pre-response cost impact of the risk.
-
currentBudget: number
(double)
The total cost of the project budget, including all transfers and changes. This field is in base currency and is calculated from currentBudgetProject field based on the specified exchange rate.
-
currentBudgetProject: number
(double)
The total cost of the project budget, including all transfers and changes. This value is based on the project currency.
-
currentBudgetWorkspace1: number
(double)
The total approved manual budget of a set of projects, calculated based on the workspace currency.
-
currentBudgetWorkspace2: number
(double)
The total approved manual budget of a set of projects, calculated based on the workspace currency.
-
currentBudgetWorkspace3: number
(double)
The total approved manual budget of a set of projects, calculated based on the workspace currency.
-
eacCost: number
(double)
Calculated as ETC Cost plus Actual Cost to Date. This field is in base currency and is calculated from eacCostProject field based on the specified exchange rate.
-
eacCostProject: number
(double)
Calculated as ETC Cost plus Actual Cost to Date. This value is based on the project currency.
-
eacCostWorkspace1: number
(double)
Calculated as ETC Cost plus Actual Cost to Date. Calculated based on the workspace currency.
-
eacCostWorkspace2: number
(double)
Calculated as ETC Cost plus Actual Cost to Date. Calculated based on the workspace currency.
-
eacCostWorkspace3: number
(double)
Calculated as ETC Cost plus Actual Cost to Date. Calculated based on the workspace currency.
-
earnedCost: number
(double)
Calculated as Performance Percent Complete multiplied by BAC Cost. This field is in base currency and is calculated from earnedCostProject field based on the specified exchange rate.
-
earnedCostProject: number
(double)
Calculated as Performance Percent Complete multiplied by BAC Cost. This value is based on the project currency.
-
earnedCostWorkspace1: number
(double)
Calculated as Performance Percent Complete multiplied by BAC Cost, calculated based on the workspace currency.
-
earnedCostWorkspace2: number
(double)
Calculated as Performance Percent Complete multiplied by BAC Cost, calculated based on the workspace currency.
-
earnedCostWorkspace3: number
(double)
Calculated as Performance Percent Complete multiplied by BAC Cost, calculated based on the workspace currency.
-
etcCost: number
(double)
The estimate of the cost needed to complete the work. Calculated as BAC Cost minus Earned Cost. This field is in base currency and is calculated from etcCostProject field based on the specified exchange rate.
-
etcCostProject: number
(double)
The estimate of the cost needed to complete the work. Calculated as BAC Cost minus Earned Cost. This value is based on the project currency.
-
etcCostWorkspace1: number
(double)
The estimate of the cost needed to complete the work, calculated based on the workspace currency.
-
etcCostWorkspace2: number
(double)
The estimate of the cost needed to complete the work, calculated based on the workspace currency.
-
etcCostWorkspace3: number
(double)
The estimate of the cost needed to complete the work, calculated based on the workspace currency.
-
installedCost: number
(double)
The total cost incurred on the scope assignment as of the current date. If Rate By is set to Hours, then Installed Cost equals Revised Cost Rate multiplied by Installed Hours. If Rate By is set to Quantity, then Installed Cost equals Revised Cost Rate multiplied by Installed Quantity. This field is in base currency and is calculated from installedCostProject field based on the specified exchange rate.
-
installedCostProject: number
(double)
The total cost incurred on the scope assignment as of the current date. If Rate By is set to Hours, then Installed Cost equals Revised Cost Rate multiplied by Installed Hours. If Rate By is set to Quantity, then Installed Cost equals Revised Cost Rate multiplied by Installed Quantity. This value is based on the project currency.
-
installedCostWorkspace1: number
(double)
The total cost incurred on the scope assignment as of the current date, calculated based on the workspace currency.
-
installedCostWorkspace2: number
(double)
The total cost incurred on the scope assignment as of the current date, calculated based on the workspace currency.
-
installedCostWorkspace3: number
(double)
The total cost incurred on the scope assignment as of the current date, calculated based on the workspace currency.
-
link: string
(url)
Read Only:
true
The self-link to the object. This field is populated only in the responses generated by the batch create APIs. -
openPostExposure: number
(double)
The mean post-response probability multiplied by the mean post response cost impact. The status of these risks is open. This field is in base currency and is calculated from openPostExposureProject field based on the specified exchange rate.
-
openPostExposureProject: number
(double)
The mean post-response probability of an open risk multiplied by the mean post-response cost impact of the risk. This value is based on the project currency.
-
openPostExposureWorkspace1: number
(double)
The mean post-response probability of an open risk multiplied by the mean post-response cost impact of the risk.
-
openPostExposureWorkspace2: number
(double)
The mean post-response probability of an open risk multiplied by the mean post-response cost impact of the risk.
-
openPostExposureWorkspace3: number
(double)
The mean post-response probability of an open risk multiplied by the mean post-response cost impact of the risk.
-
openPreExposure: number
(double)
The mean pre-response probability multiplied by the pre-response mean cost impact. The status of these risks is open. This field is in base currency and is calculated from openPreExposureProject field based on the specified exchange rate.
-
openPreExposureProject: number
(double)
The mean pre-response probability of an open risk multiplied by the mean pre-response cost impact of the risk. This value is based on the project currency.
-
openPreExposureWorkspace1: number
(double)
The mean pre-response probability of an open risk multiplied by the mean pre-response cost impact of the risk.
-
openPreExposureWorkspace2: number
(double)
The mean pre-response probability of an open risk multiplied by the mean pre-response cost impact of the risk.
-
openPreExposureWorkspace3: number
(double)
The mean pre-response probability of an open risk multiplied by the mean pre-response cost impact of the risk.
-
pendingChangedCost: number
(double)
Calculated as the sum of all pending cost changes in the change records for the scope assignment. This field is in base currency and is calculated from pendingChangedCostProject field based on the specified exchange rate.
-
pendingChangedCostProject: number
(double)
Calculated as the sum of all pending cost changes in the change records for the scope assignment. This value is based on the project currency.
-
pendingChangedCostWorkspace1: number
(double)
Calculated as the sum of all pending cost changes in the change records for the scope assignment, calculated based on the workspace currency.
-
pendingChangedCostWorkspace2: number
(double)
Calculated as the sum of all pending cost changes in the change records for the scope assignment, calculated based on the workspace currency.
-
pendingChangedCostWorkspace3: number
(double)
Calculated as the sum of all pending cost changes in the change records for the scope assignment, calculated based on the workspace currency.
-
pendingManualBudget: number
(double)
Calculated as the sum of all costs pending for the original manual budget. This field is in base currency and is calculated from pendingManualBudgetProject field based on the specified exchange rate.
-
pendingManualBudgetChanges: number
(double)
Calculated as the sum of all pending manual budget changes for the project. This field is in base currency and is calculated pendingManualBudgetChangesProject field based on the specified exchange rate.
-
pendingManualBudgetChangesProject: number
(double)
The pending manual budget changes of a project. This value is based on the project currency.
-
pendingManualBudgetChangesWorkspace1: number
(double)
The pending manual budget changes of a workspace.
-
pendingManualBudgetChangesWorkspace2: number
(double)
The pending manual budget changes of a workspace.
-
pendingManualBudgetChangesWorkspace3: number
(double)
The pending manual budget changes of a workspace.
-
pendingManualBudgetProject: number
(double)
The pending manual cost of a project. This value is based on the project currency.
-
pendingManualBudgetTransfers: number
(double)
Calculated as the sum of all pending manual budget transfers for the project. This field is in base currency and is calculated from pendingManualBudgetTransfersProject field based on the specified exchange rate.
-
pendingManualBudgetTransfersProject: number
(double)
The pending manual budget transfers of a project. This value is based on the project currency.
-
pendingManualBudgetTransfersWorkspace1: number
(double)
The pending manual budget transfers of a workspace.
-
pendingManualBudgetTransfersWorkspace2: number
(double)
The pending manual budget transfers of a workspace.
-
pendingManualBudgetTransfersWorkspace3: number
(double)
The pending manual budget transfers of a workspace.
-
pendingManualBudgetWorkspace1: number
(double)
The pending manual budget of a workspace.
-
pendingManualBudgetWorkspace2: number
(double)
The pending manual budget of a workspace.
-
pendingManualBudgetWorkspace3: number
(double)
The pending manual cost of a workspace.
-
pendingProjectActuals: number
(double)
The total of all actuals values with a status of Pending. This field is in base currency and is calculated from pendingProjectActualsProject field based on the specified exchange rate.
-
pendingProjectActualsProject: number
(double)
The total amount of pending actuals for a project. This value is based on the project currency.
-
pendingProjectActualsWorkspace1: number
(double)
The total amount of pending actuals for a workspace.
-
pendingProjectActualsWorkspace2: number
(double)
The total amount of pending actuals for a workspace.
-
pendingProjectActualsWorkspace3: number
(double)
The total amount of pending actuals for a workspace.
-
plannedCost: number
(double)
The original cost of the scope assignment. If Rate By is set to Hours, then Original Cost equals Original Hours multiplied by Original Cost Rate. If this value is entered manually, then Original Cost Rate is recalculated to equal Original Cost divided by Original Hours. If Rate By is set to Quantity, then Original Cost equals Original Quantity multiplied by Original Cost Rate. If this value is entered manually, then Original Cost Rate is recalculated to equal Original Cost divided by Original Quantity. This field is in base currency and is calculated from plannedCostProject field based on the specified exchange rate.
-
plannedCostProject: number
(double)
The original cost of the scope assignment. If Rate By is set to Hours, then Original Cost equals Original Hours multiplied by Original Cost Rate. If this value is entered manually, then Original Cost Rate is recalculated to equal Original Cost divided by Original Hours. If Rate By is set to Quantity, then Original Cost equals Original Quantity multiplied by Original Cost Rate. If this value is entered manually, then Original Cost Rate is recalculated to equal Original Cost divided by Original Quantity. This value is based on the project currency.
-
plannedCostWorkspace1: number
(double)
The original cost of the scope assignment, calculated based on the workspace currency.
-
plannedCostWorkspace2: number
(double)
The original cost of the scope assignment, calculated based on the workspace currency.
-
plannedCostWorkspace3: number
(double)
The original cost of the scope assignment, calculated based on the workspace currency.
-
plannedRiskResponse: number
(double)
The planned value required to respond to a risk. This field is in base currency and is calculated from plannedRiskResponseProject field based on the specified exchange rate.
-
plannedRiskResponseProject: number
(double)
The estimated cost of implementing a response action. This value is based on the project currency.
-
plannedRiskResponseWorkspace1: number
(double)
The planned value required to respond to a risk, calculated based on the workspace currency.
-
plannedRiskResponseWorkspace2: number
(double)
The planned value required to respond to a risk, calculated based on the workspace currency.
-
plannedRiskResponseWorkspace3: number
(double)
The planned value required to respond to a risk, calculated based on the workspace currency.
-
projectActualCost: number
(double)
Total costs accrued on a project within a given time period. The Actual Cost data for the project's life cycle is pulled from the P6 EPPM schedule. Actual Cost data is only available when the application is connected with P6 EPPM and is not editable. This field is in base currency and is calculated from projectActualCostProject field based on the specified exchange rate.
-
projectActualCostProject: number
(double)
Total costs accrued on a project within a given time period. The Actual Cost data for the project's life cycle is pulled from the P6 EPPM schedule. Actual Cost data is only available when the application is connected with P6 EPPM and is not editable. This value is based on the project currency.
-
projectActualCostWorkspace1: number
(double)
The total amount of confirmed actuals, calculated based on the workspace currency.
-
projectActualCostWorkspace2: number
(double)
The total amount of confirmed actuals, calculated based on the workspace currency.
-
projectActualCostWorkspace3: number
(double)
The total amount of confirmed actuals, calculated based on the workspace currency.
-
projectCPI: number
The measure of a project's cost efficiency. A value of less than 1 indicates the project is over budget, while a value greater than 1 indicates the project is under budget. This field is in base currency and is calculated from projectCPIProject field based on the specified exchange rate.
-
projectCPIProject: number
The measure of a project's cost efficiency. A value of less than 1 indicates the project is over budget, while a value greater than 1 indicates the project is under budget. This value is based on the project currency.
-
projectEarnedCost: number
(double)
The value of work performed on a project in reference to the approved budget for the project. The cost value used for the Earned Value Management of a project. Earned Value Management allows project managers to quantify project progress and objectively measure a project's success. This field is in base currency and is calculated from projectEarnedCostProject field based on the specified exchange rate.
-
projectEarnedCostProject: number
(double)
The value of work performed on a project in reference to the approved budget for the project. The cost value used for the Earned Value Management of a project. Earned Value Management allows project managers to quantify project progress and objectively measure a project's success. This value is based on the project currency.
-
remainingCost: number
(double)
The amount left to be spent. If Rate By set to Hours, then Remaining Cost equals Remaining Hours multiplied by Revised Cost Rate. If Rate By set to Quantity, then Remaining Cost equals Remaining Quantity multiplied by Revised Cost Rate. This field is in base currency and is calculated from remainingCostProject field based on the specified exchange rate.
-
remainingCostProject: number
(double)
The amount left to be spent. If Rate By set to Hours, then Remaining Cost equals Remaining Hours multiplied by Revised Cost Rate. If Rate By set to Quantity, then Remaining Cost equals Remaining Quantity multiplied by Revised Cost Rate. This value is based on the project currency.
-
remainingCostWorkspace1: number
(double)
The amount left to be spent, calculated based on the workspace currency.
-
remainingCostWorkspace2: number
(double)
The amount left to be spent, calculated based on the workspace currency.
-
remainingCostWorkspace3: number
(double)
The amount left to be spent, calculated based on the workspace currency.
-
revisedCost: number
(double)
The Original Cost before the baseline is set. After the baseline is set, Revised Cost equals Original Cost plus Approved Change Cost. This field is in base currency and is calculated from revisedCostProject field based on the specified exchange rate.
-
revisedCostProject: number
(double)
The Original Cost before the baseline is set. After the baseline is set, Revised Cost equals Original Cost plus Approved Change Cost. This value is based on the project currency.
-
revisedCostWorkspace1: number
(double)
The Original Cost before the baseline is set, calculated based on the workspace currency.
-
revisedCostWorkspace2: number
(double)
The Original Cost before the baseline is set, calculated based on the workspace currency.
-
revisedCostWorkspace3: number
(double)
The Original Cost before the baseline is set, calculated based on the workspace currency.
-
rowId: integer
(int64)
The unique identifier of a cost sheet row.
-
updateDate: string
(date-time)
Read Only:
true
Date when the record was last updated.
204 Response
Successful operation with no content.
404 Response
The requested cost category does not exist, or you do not have access to it.