View All Monte Carlo Activity Iteration Values by Parent Codes
get
/api/restapi/monteCarloActivityIterationValues/parentCode
Send a request to this endpoint to view all Monte Carlo Activity Iteration Values under parent with codes matching the code fields in query parameters.
Request
Query Parameters
-
activityCode(required): string
The user-specified identifier of an activity.
This is a required field. -
projectCode(required): string
The user-specified identifier of a project.
This is a required field. -
scenario(required): string
The type of risk analysis run on a project.
- PRE_MITIGATED : A quantitative risk analysis that doesn't take into account the impact of defined risk response plans.
- POST_MITIGATED : A quantitative risk analysis that takes into account the impact of defined risk response plans.
- BOTH : A quantitative risk analysis that uses both pre and post mitigated contexts.
This is a required field.Allowed Values:[ "PRE_MITIGATED", "POST_MITIGATED", "BOTH" ]
-
workspaceCode(required): string
The user-specified identifier of a workspace.
This is a required field.
There's no request body for this operation.
Back to TopResponse
Supported Media Types
- application/json
200 Response
Successful operation
Root Schema : List<ApiEntityMonteCarloActivityIterationValue>
Type:
array
Title:
Show Source
List<ApiEntityMonteCarloActivityIterationValue>
-
Array of:
object ApiEntityMonteCarloActivityIterationValue
Title:
ApiEntityMonteCarloActivityIterationValue
Nested Schema : ApiEntityMonteCarloActivityIterationValue
Type:
object
Title:
Show Source
ApiEntityMonteCarloActivityIterationValue
-
activityCode: string
Minimum Length:
0
Maximum Length:60
The user-specified identifier of the activity. -
activityId: integer
(int64)
The system-generated unique identifier of the activity.
-
atCompletionDuration: number
(double)
The activity at completion duration for the iteration. Stored for first 50 iterations only.
-
atCompletionTotalCost: number
(double)
The activity at completion total cost for the iteration. Stored for the first 50 iterations only.
-
drivingPath: boolean
The activity longest path value for the iteration. Stored for the first 50 iterations only.
-
earlyFinishDate: string
(date-time)
The activity early finish date for the iteration. Stored for all iterations.
-
earlyStartDate: string
(date-time)
The activity early start date for the iteration. Stored for all iterations.
-
finishDate: string
(date-time)
The activity finish date for the iteration. Stored for the first 50 iterations only.
-
freeFloat: number
(double)
The activity free float for the iteration. Stored for the first 50 iterations only.
-
impactBarStartDate: string
(date-time)
If an activity has a schedule impact, then the Impact Bar Start Date is the start date that the impact on the activity Gantt bar is drawn from for the iteration. Stored for the first 50 iterations only.
-
impactingRisks: string
Maximum Length:
3855
The risks that impacted the activity for the iteration. Stored for the first 50 iterations only. -
indirectDurationImpact: number
(double)
Indirect duration impact due to scheduling on the activity for the iteration. Stored for the first 50 iterations only.
-
isCritical: boolean
The activity critical value for the iteration. Stored for all iterations.
-
iterationNumber: integer
(int64)
The iteration sequence number.
-
lateFinishDate: string
(date-time)
The activity late finish date for the iteration. Stored for the first 50 iterations only.
-
lateStartDate: string
(date-time)
The activity late start date for the iteration. Stored for the first 50 iterations only.
-
link: string
(url)
Read Only:
true
The self-link to the object. This field is populated only in the responses generated by the batch create APIs. -
monteCarloScenario: string
Allowed Values:
[ "PRE_MITIGATED", "POST_MITIGATED" ]
The type of risk analysis run on a project.- PRE_MITIGATED : A quantitative risk analysis that doesn't take into account the impact of defined risk response plans.
- POST_MITIGATED : A quantitative risk analysis that takes into account the impact of defined risk response plans.
-
otherScheduleDrivenCostImpact: number
(double)
Other cost impact on the activity for the iteration. Stored for the first 50 iterations only.
-
projectCode: string
Minimum Length:
1
Maximum Length:60
The unique identifier for a project set by the user who created the project. -
projectId: integer
(int64)
The system-generated unique identifier of the project.
-
projectScenarioId: integer
(int64)
The system-generated unique identifier of the project scenario.
-
remainingDuration: number
(double)
The activity remaining duration for the iteration. Stored for all iterations.
-
remainingEarlyStartDate: string
(date-time)
The activity remaining early start for the iteration. Stored for the first 50 iterations only.
-
remainingTotalCost: number
(double)
The activity remaining total cost for the iteration. Stored for all iterations.
-
riskCostImpact: number
(double)
The total for the iteration of the cost impact on the activity due to risks impacting the activity. Stored for first 50 iterations only.
-
riskScheduleDrivenCostImpact: number
(double)
Total cost impact due to scheduling on the activity for the iteration. Stored for the first 50 iterations only.
-
riskScheduleImpact: number
(double)
The change in the activity remaining duration due to risks impacting the activity for the iteration. Only schedule impacts from threats and opportunities are included (Weather risks impact an activity's non-working, but not the remaining duration). If the sampled risk schedule impacts on the activity are greater than the activity remaining duration, then the activity remaining duration is set to 1 minute because negative duration values are not supported. Stored for the first 50 iterations only.
-
startDate: string
(date-time)
The activity start date for the iteration. Stored for the first 50 iterations only.
-
totalCostImpact: number
(double)
Total cost impact due to risks on the activity for the iteration. Stored for the first 50 iterations only.
-
totalFloat: number
(double)
The activity total float for the iteration. Stored for the first 50 iterations only.
-
totalScheduleImpact: number
(double)
The sum of the uncertainty schedule impact and the risk schedule impact for the iteration. Stored for the first 50 iterations only.
-
totalWeatherDelay: number
(double)
The number of weather non-working days between the start and finish of the activity for the iteration. Weather non-working time that coincides with other non-working weather time on the activity time is included. Stored for the first 50 iterations only.
-
uncertaintyDelay: number
(double)
The activity mean delay for the iteration. Stored for all iterations.
-
uncertaintyScheduleDrivenCostImpact: number
(double)
Total cost impact due to uncertainty on the activity for the iteration. Stored for the first 50 iterations only.
-
uncertaintyScheduleImpact: number
(double)
For the iteration, the difference between the activity deterministic remaining duration and the duration sampled from the activity Uncertainty Distribution. The value can be positive or negative. Stored for the first 50 iterations only.
-
workspaceCode: string
Minimum Length:
0
Maximum Length:60
The user-specified identifier of a workspace.
204 Response
Successful operation with no content.
404 Response
The requested Monte Carlo Activity Iteration Values does not exist, or you do not have access to it.