View Monte Carlo Project Deterministic Values
get
/api/restapi/monteCarloProjectDeterministicValues/{id}
This endpoint returns Monte Carlo project deterministic values that meet the following requirements:
- The object has an ID that matches the value of the {id} path parameter.
Request
Path Parameters
-
id(required): integer(int64)
ID of MonteCarlo Project Deterministic Values to be found.
There's no request body for this operation.
Back to TopResponse
Supported Media Types
- application/json
200 Response
Successful operation
Root Schema : ApiEntityMonteCarloProjectDeterministicValues
Type:
object
Title:
Show Source
ApiEntityMonteCarloProjectDeterministicValues
-
actualDuration: number
(double)
Read Only:
true
The project actual duration at the time the risk analysis was run. -
actualFinishDate: string
(date-time)
Read Only:
true
The project actual finish date at the time the risk analysis was run. -
actualStartDate: string
(date-time)
Read Only:
true
The project actual start date at the time the risk analysis was run. -
assignedRisks: string
Read Only:
true
Maximum Length:3855
The risks assigned to the project at the time the risk analysis was run. -
finishDate: string
(date-time)
Read Only:
true
The project finish date at the time the risk analysis was run. -
link: string
(url)
Read Only:
true
The self-link to the object. This field is populated only in the responses generated by the batch create APIs. -
monteCarloProjectDeterministicFinancialValues:
monteCarloProjectDeterministicFinancialValues
An object containing Monte Carlo project deterministic financial fields in the form of key-value pairs.
-
monteCarloProjectDeterministicValuesId: integer
(int64)
Read Only:
true
The system-generated identifier of the project deterministic value. -
monteCarloScenario: string
Read Only:
true
Allowed Values:[ "PRE_MITIGATED", "POST_MITIGATED" ]
The type of risk analysis run on a project.- PRE_MITIGATED : A quantitative risk analysis that doesn't take into account the impact of defined risk response plans.
- POST_MITIGATED : A quantitative risk analysis that takes into account the impact of defined risk response plans.
-
projectCode: string
Read Only:
true
Maximum Length:60
The project code at the time the risk analysis was run. -
projectId: integer
(int64)
The system-generated identifier of the project.
-
projectName: string
Read Only:
true
Maximum Length:255
The project name at the time the risk analysis was run. -
remainingDuration: number
(double)
Read Only:
true
The project schedule remaining duration at the time the risk analysis was run. -
scheduledFinishDate: string
(date-time)
Read Only:
true
The project schedule finish date at the time the risk analysis was run. -
startDate: string
(date-time)
Read Only:
true
The project start date at the time the risk analysis was run. -
updateDate: string
(date-time)
Read Only:
true
Date when the record was last updated. -
workspaceCode: string
Minimum Length:
0
Maximum Length:60
The user-specified identifier of the project's workspace.
Nested Schema : monteCarloProjectDeterministicFinancialValues
An object containing Monte Carlo project deterministic financial fields in the form of key-value pairs.
Match All
Show Source
-
object
ApiEntityMonteCarloProjectDeterministicFinancialValues
Title:
ApiEntityMonteCarloProjectDeterministicFinancialValues
Nested Schema : ApiEntityMonteCarloProjectDeterministicFinancialValues
Type:
object
Title:
Show Source
ApiEntityMonteCarloProjectDeterministicFinancialValues
-
atCompletionCost: number
(double)
Read Only:
true
The sum of the activity at-completion costs at the time the risk analysis was run. -
deterministicActualCost: number
(double)
Read Only:
true
The project actual cost at the time the risk analysis as run. -
link: string
(url)
Read Only:
true
The self-link to the object. This field is populated only in the responses generated by the batch create APIs. -
monteCarloProjectDeterministicId: integer
(int64)
Read Only:
true
The system-generated identifier of the project deterministic value. -
monteCarloProjectDeterministicValuesId: integer
(int64)
The unique identifier of a project deterministic cost.
-
remainingCost: number
(double)
Read Only:
true
The project remaining total cost plus unmapped response action remaining costs at the time the risk analysis as run. -
totalDirectResponseActualCost: number
(double)
The project total direct response actual cost at the time the risk analysis as run.
-
totalDirectResponseRemainingCost: number
(double)
The project total direct response remaining cost at the time the risk analysis as run.
-
updateDate: string
(date-time)
Read Only:
true
Date when the record was last updated.
404 Response
The Monte Carlo project deterministic values do not exist, or you do not have access to them.