View a Project
get
/api/restapi/project/{projectId}
This endpoint returns projects that meet the following requirements:
- The object has an ID value that matches the value of the {projectId} path parameter.
Request
Path Parameters
-
projectId(required): integer(int64)
ID of the project to be found.
There's no request body for this operation.
Back to TopResponse
Supported Media Types
- application/json
200 Response
Successful operation
Root Schema : ApiEntityProject
Type:
object
Title:
Show Source
ApiEntityProject
-
actualDuration: number
(double)
The Actual Duration represents the total working time between the project Actual Start and Actual Finish for a project.
This value can be imported. The Actual Duration field is not editable. -
actualFinish: string
(date-time)
The Actual Finish displays the date on which a project is considered complete.
This value can be entered manually or can be imported. -
actualLinkType: string
Allowed Values:
[ "MANUAL", "ACTUAL", "INTEGRATION" ]
Type of actuals data linked to a project. -
actualStart: string
(date-time)
The Actual Start indicates the date work on the project began.
This value can be entered manually or can be imported. -
addressLine1: string
Minimum Length:
0
Maximum Length:200
The first line of the address of a location.
This might be the building number and street address. -
addressLine2: string
Minimum Length:
0
Maximum Length:200
The second line of the address of a location.
This might be a neighborhood or town. -
benefitsFinishDate: string
(date-time)
The date benefits on the project finished.
-
benefitsStartDate: string
(date-time)
The date benefits on the project began.
-
breakdownCapitalForActual: boolean
Enables you breakdown spends total into spends capital.
-
breakdownCapitalForForecast: boolean
Enables you breakdown forecast total into forecast capital.
-
breakdownCapitalForPlannedBudget: boolean
Enables you breakdown planned budget total into planned budget capital.
-
breakdownExpenseForActual: boolean
Enables you breakdown spends total into spends expense.
-
breakdownExpenseForForecast: boolean
Enables you breakdown forecast total into forecast expense.
-
breakdownExpenseForPlannedBudget: boolean
Enables you breakdown planned budget total into planned budget expense.
-
calendarId: integer
(int64)
The unique identifier for the calendar.
-
cityName: string
Minimum Length:
0
Maximum Length:200
The city name for a location. -
codeValuesProject: array
codeValuesProject
The list of code values for a project. This entity can only be used to assign codeValues or create codeValues on the fly.
-
configuredFields: array
configuredFields
The list of configured fields for a project.
-
copyCustomLogTypes: array
copyCustomLogTypes
Name of custom log types from the project or project template to be copied to create a new project.
-
copyFromProjectId: integer
(int64)
The system-generated unique identifier of the project or project template from which the new project needs to be copied from.
-
copyOptions: object
copyOptions
The copy options available for a project.This is a map field which takes key-value pairs to indicate the objects from the project or project template to be copied to create a new project.If the object is not specified in the map with a value of true, then by default the value will be considered false and the object will not be copied to the new project.Map Keys (Allowed Values) : ACTIVITY, RELATIONSHIP, RESOURCE, ROLE, ASSIGNMENT, TASK, TASK_HANDOFFS, RISK, MATRIX, ACTIVITY_UNCERTAINITY, WBS, AUTO_NUMBERING, MANAGER, PROJECT_SETTINGS, CALENDAR, UOM, MONTECARLO_SETTING, CUSTOM_LOG, PROJECT_CODE, PROJECT_CALENDAR Example : { "ACTIVITY" : true, "RESOURCE" : true } Note: When either "RESOURCE" or "ROLE" has to be copied from a project, both of them should be sent in the request as "true".
-
countryCode: string
Minimum Length:
0
Maximum Length:3
The country for a location. -
currentApprovedFinishDate: string
(date-time)
The finish date for the Current Approved Budget set by the budget planner.
-
currentApprovedStartDate: string
(date-time)
The start date for the Current Approved Budget set by the budget planner.
-
danglingFinishActivityCount: integer
(int32)
The number of activities in the project that only have Start-to-Finish or Start-to-Start successor relationships. If the activity type is Level of Effort, the activity is counted if all of the following are true: No Finish-to-Finish predecessor; No Finish-to-Finish successor; No Start-to-Finish predecessor; No Finish-to-Start successor. If the activity type is Milestone, the activity is not counted.
-
danglingFinishActivityPercent: number
(double)
The percentage of activities in the project that only have Start-to-Finish or Start-to-Start successor relationships. If the activity type is Level of Effort, the activity is counted if all of the following are true: No Finish-to-Finish predecessor; No Finish-to-Finish successor; No Start-to-Finish predecessor; No Finish-to-Start successor. If the activity type is Milestone, the activity is not counted.
-
danglingStartActivityCount: integer
(int32)
The number of activities in the project that only have Start-to-Finish or Finish-to-Finish predecessor relationships. If the activity type is Level of Effort, the activity is counted if all of the following are true: No Start-to-Start predecessor; No Start-to-Start successor; No Start-to-Finish successor; No Finish-to-Start predecessor. If the activity type is Milestone, the activity is not counted.
-
danglingStartActivityPercent: number
(double)
The percentage of activities in the project that only have Start-to-Finish or Finish-to-Finish predecessor relationships. If the activity type is Level of Effort, the activity is counted if all of the following are true: No Start-to-Start predecessor; No Start-to-Start successor; No Start-to-Finish successor; No Finish-to-Start predecessor. If the activity type is Milestone, the activity is not counted.
-
dataDate: string
(date-time)
The progress point, or "as-of date", for activities in the project. Project status is up-to-date as of the data date. You can set the data date when you schedule the project, or you can set it manually.
The data date is also used for updating the dates of scope assignments and work packages when they are not linked to activities. -
description: string
Minimum Length:
0
Maximum Length:4000
The detailed summary for the project.
The description provides more information than short names or titles.
It can give background information or establish a purpose for the item.
These details help differentiate between items with similar names and are especially useful in multi-user environments. -
evaluationMatrixId: integer
(int64)
The evaluation matrix of a calendar.
-
evaluationScore: number
(double)
The quantitative score of a project based on the qualitative ranking of projects against different evaluation categories. This value is used by portfolio managers to prioritize projects.
-
exchangeRate: number
The custom exchange rate for the currency assigned to the project.
-
ffPredecessorActivityCount: integer
(int32)
The number of predecessor relationships in the project with a type of Finish-to-Finish (FF).
-
ffPredecessorActivityPercent: number
(double)
The percentage of predecessor relationships in the project with a type of Finish-to-Finish (FF).
-
finishDate: string
(date-time)
The date on which all project work is complete.
This value can be entered manually or can be imported. -
finishDateVariance: number
(double)
The duration between the project's finish date and the baseline's finish date.
When the field value is generated through a P6 EPPM connection, then it represents the duration between the finish date in the current project and the baseline finish date.
This value can only be imported. -
forecastFinishDate: string
(date-time)
The planned finish date of a project's remaining Forecast cost.
-
forecastLinkType: string
Allowed Values:
[ "MANUAL", "INTEGRATION" ]
The type of forecast data linked to a project. Forecast data represents an estimation of a project's remaining costs. -
forecastStartDate: string
(date-time)
The planned start date of a project's remaining Forecast cost.
-
fsPredecessorActivityCount: integer
(int32)
The number of predecessor relationships in the project with a type of Finish-to-Start (FS).
-
fsPredecessorActivityPercent: number
(double)
The percentage of predecessor relationships in the project with a type of Finish-to-Start (FS).
-
hardConstraintActivityCount: integer
(int32)
The number of activities in the project with a primary constraint of Mandatory Start or Mandatory Finish.
-
hardConstraintActivityPercent: number
(double)
The percentage of activities in the project with a primary constraint of Mandatory Start or Mandatory Finish.
-
image:
image
The image associated with a project.
-
invalidProgressDateActivityCount: integer
(int32)
The number of activities in the project with invalid progress. An activity is included in the count if any of the following are true: Activity Planned Start less than Data Date; Activity Planned Finish less than or equal to Data Date; Activity Actual Start greater than or equal to Data Date; Activity Actual Finish greater than Data Date.
-
invalidProgressDateActivityPercent: number
(double)
The percentage of activities in the project with invalid progress. An activity is included in the count if any of the following are true: Activity Planned Start less than Data Date; Activity Planned Finish less than or equal to Data Date; Activity Actual Start greater than or equal to Data Date; Activity Actual Finish greater than Data Date.
-
isTemplateFlag: boolean
Indicates the project is a template for creating other projects.
-
largeDurationActivityCount: integer
(int32)
The number of activities in the project with an Activity Remaining Duration that meets or exceeds the given criteria value. The default value is 320h.
-
largeDurationActivityPercent: number
(double)
The percentage of activities in the project with an Activity Remaining Duration that meets or exceeds the given criteria value. The default value is 320h.
-
largeFloatActivityCount: integer
(int32)
The number of activities in the project with an Activity Total Float that meets or exceeds the given criteria value. The default value is 320h.
-
largeFloatActivityPercent: number
(double)
The percentage of activities in the project with an Activity Total Float that meets or exceeds the given criteria value. The default value is 320h.
-
lastProjectEvaluationDate: string
(date-time)
The date on which the project was last evaluated.
-
lateActivityCount: integer
(int32)
The number of activities in the project with an Activity Baseline Finish Variance less than 0 or without a set activity baseline.
-
lateActivityPercent: number
(double)
The percentage of activities in the project with an Activity Baseline Finish Variance less than 0 or without a set activity baseline.
-
latitude: number
(double)
Minimum Value:
-90
Maximum Value:90
The geographical coordinate for the latitude of the location.
The default format for latitude is decimal degrees format, but the format you need to use will depend on your geolocation service. -
link: string
(url)
The self-link to the object. This field is populated only in the responses generated by the batch create APIs.
-
linkActualTo: integer
(int64)
Specifies data to which project actuals data is linked.
-
linkForecastTo: integer
(int64)
Specifies data to which a project forecast is linked.
-
linkForecastToSpend: boolean
Enables you to link project Forecast data to project Actuals data.
When linked, any updates to the project's Actuals values will automatically be applied to the project's Forecast values. -
linkPlannedBudgetTo: integer
(int64)
Specifies data to which a project planned budget is linked.
-
locationName: string
Minimum Length:
0
Maximum Length:255
A name for the location that your users will understand and recognize. -
longitude: number
(double)
Minimum Value:
-180
Maximum Value:180
The geographical coordinate for the longitude of the location.
The default format for longitude is decimal degrees format, but the format you need to use will depend on your geolocation service. -
manager: string
Maximum Length:
255
The user name of a manager or person responsible for the project. -
managerId: integer
(int64)
The user id of a manager or person responsible for the project.
-
mustFinishByDate: string
(date-time)
The latest date on which the scheduled activities must be complete for a project.
-
negativeFloatActivityCount: integer
(int32)
The number of activities in the project with a total float less than 0.
-
negativeFloatActivityPercent: number
(double)
The percentage of activities in the project with a total float less than 0.
-
noPredecessorActivityCount: integer
(int32)
The number of activities in the project without predecessors.
-
noPredecessorActivityPercent: number
(double)
The percentage of activities in the project without predecessors.
-
noResourceActivityCount: integer
(int32)
The number of activities in the project without role or resource assignments.
-
noResourceActivityPercent: number
(double)
The percentage of activities in the project without role or resource assignments.
-
noSuccessorActivityCount: integer
(int32)
The number of activities in the project without successors.
-
noSuccessorActivityPercent: number
(double)
The percentage of activities in the project without successors.
-
openEndsActivityCount: integer
(int32)
The number of activities in the project without predecessors or successors.
-
openEndsActivityPercent: number
(double)
The percentage of activities in the project without predecessors or successors.
-
parentProject: integer
(int64)
The workspace the project is associated with.
-
percentComplete: number
(double)
Minimum Value:
0
Maximum Value:1
The estimated percentage of work that has been completed on the project. This value is entered by the user. -
percentCompleteWeightedBy: string
Allowed Values:
[ "COST", "QUANTITY", "HOURS", "MANUAL" ]
The weight for scope items is calculated using quantity. -
planDuration: number
(double)
The duration between Project Planned Start and Project Planned Finish.
This value can be entered manually or can be imported. -
planEndDate: string
(date-time)
The finish date for the time phased Planned Budget of the project.
Planned Budget cost spread will adjust when this date is changed. -
plannedBudgetLinkType: string
Allowed Values:
[ "MANUAL", "BUDGET", "INTEGRATION" ]
Type of data to which a project's planned budget is linked. -
planStartDate: string
(date-time)
The start date for the time phased Planned Budget of the project.
Planned Budget cost spread will adjust when this date is changed.
The Project Planned Start also represents the earliest date that activities can occur within a project schedule. -
postalCode: string
Minimum Length:
0
Maximum Length:20
The postal code, post code, or zip code of a location. -
predecessorLagActivityCount: integer
(int32)
The number of predecessor relationships in the project with a lag greater than 0.
-
predecessorLagActivityPercent: number
(double)
The percentage of predecessor relationships in the project with a lag greater than 0.
-
predecessorNegativeLagActivityCount: integer
(int32)
The number of predecessor relationships in the project with a lag less than 0.
-
predecessorNegativeLagActivityPercent: number
(double)
The percentage of predecessor relationships in the project with a lag less than 0.
-
primaryProgramCode: string
Maximum Length:
60
The user-defined identifier of a primary program of a project. This field is intended to be used while updating a project. -
primaryProgramId: integer
(int64)
The system-generated identifier of a primary program of a project. This field is intended to be used while updating a project.
-
priorityNum: integer
(int64)
Minimum Value:
1
Maximum Value:10000
Default Value:500
The project's priority in the strategic plan.
This priority value ranges from 1 to 10,000 with a default of 500. Use of the priority value, such as whether to place higher priority at the lower end of the scale, toward the endpoint 1, or at the higher end, toward 10,000, is at the discretion of the user. This field is not used for calculating data. -
projectAutoNumber: array
projectAutoNumber
The autonumber settings of a project.
-
projectCashFlows: array
projectCashFlows
The cash flow of a project.
-
projectCode: string
Minimum Length:
1
Maximum Length:60
The unique identifier for a project set by the user who created the project. -
projectCurrency: integer
(int64)
The unique identifier of the currency to be used in the project. Currencies configured in the immediate parent workspace, with at least one exchange rate configured, are available to be used in the project. If no value is specified, the parent workspace currency will be selected.
-
projectFinancial:
projectFinancial
The financial fields associated with a project.
-
projectId: integer
(int64)
The unique identifier for the project.
-
projectIntegrationSourceDetails:
projectIntegrationSourceDetails
The integration source details associated with a project.
-
projectIntegrationType: string
Allowed Values:
[ "P6", "UNIFIER" ]
Specifies if the project is integrated with another application. -
projectName: string
Minimum Length:
1
Maximum Length:255
The name of the project. -
projectScheduleHealthPercent: number
(double)
The weighted aggregation of active check values that represents the overall quality of your project. A higher schedule health score indicates a higher quality schedule. Calculated as 100% - (Sum of [Check Adjusted Percentage * Check Weighting] / Sum of all active check weighting values)
-
projectSettings: array
projectSettings
The project settings associated with the project.
-
projectTerm: string
(date-time)
Project termination date.
-
projectTimeZone: string
Allowed Values:
[ "INTERNATIONAL_DATE_LINE_WEST", "MIDWAY_ISLAND_SAMOA", "HAWAII", "ALASKA", "PACIFIC_TIME", "ARIZONA", "CHIHUAHUA_LA_PAZ_MAZATLAN", "MOUNTAIN_TIME", "CENTRAL_AMERICA", "CENTRAL_TIME", "GUADALAJARA_MEXICO_CITY_MONTERREY", "SASKATCHEWAN", "BOGOTA_LIMA_QUITO", "EASTERN_TIME", "INDIANA", "ATLANTIC_TIME", "CARACAS_LA_PAZ_PUERTO_RICO", "SANTIAGO", "NEWFOUNDLAND", "BRASILIA", "BUENOS_AIRES_GEORGETOWN", "MID_ATLANTIC", "AZORES", "CAPE_VERDE_IS", "CASABLANCA_MONROVIA", "GREENWICH_MEAN_TIME", "AMSTERDAM_BERLIN_BERN", "BELGRADE_BRATISLAVA_BUDAPEST", "BRUSSELS_COPENHAGEN_MADRID", "SARAJEVO_SKOPJE_WARSAW", "WEST_CENTRAL_AFRICA", "ATHENS_BEIRUT_ISTANBUL", "BUCHAREST", "CAIRO", "HARARE_PRETORIA", "HELSINKI_KVIV_RIGA", "JERUSALEM", "BAGHDAD", "KUWAIT_RIYADH", "NAIROBI", "MOSCOW_ST_PETERSBURG", "TEHRAN", "ABU_DHADI_MUSCAT", "BAKU_TBILISI_YEREVAN", "KABUL", "ISLAMABAD_KARACHI_TASHKENT", "CHENNAI_KOLKATA_MUMBAI", "ASTANA_DHAKA", "RANGOON", "BANGKOK_HANOI_JAKARTA", "BEJING_CHONGQING_HONG_KONG", "KUALA_LUMPUR_SINGAPORE", "PERTH", "TAIPEI", "OSAKA_SAPPORO_TOKYO", "SEOUL", "ADELAIDE", "DARWIN", "BRISBANE", "CANBERRA_MELBOURNE_SYDNEY", "GUAM_PORT_MORESBY", "HOBART", "MAGADAN_SOLOMON_IS_NEW_CALEDONIA", "AUCKLAND_WELLINGTON" ]
The time zone of the project's location. -
proposedFinishDate: string
(date-time)
The finish date for the Proposed Budget of the project.
-
proposedStartDate: string
(date-time)
The start date for the Proposed Budget of the project.
-
recordCount: integer
(int32)
The number of comments on a project.
-
remainingDuration: number
(double)
The duration between the Project Start and Project Finish.
This value can be entered manually or can be imported. -
remainingFinishDate: string
(date-time)
The earliest possible date the remaining work for the activity is scheduled to finish. This date is calculated by the project scheduler but can be updated manually by the user. Before the activity is started, the Remaining Finish is the same as the Planned Finish. When the activity is complete, the Remaining Finish is blank.
-
remainingStartDate: string
(date-time)
The earliest possible date the remaining work for the activity is scheduled to begin. This date is calculated by the project scheduler but can be updated manually by the user. Before the activity is started, the Remaining Start is the same as the Project Planned Start. Once the activity has started, the Remaining Start is equal to the Data Date. When the activity is complete, the Remaining Start is blank.
-
reportCycleId: integer
(int64)
The reporting cycle assigned to the project.
-
reportCycleNamingBoundary: string
Allowed Values:
[ "REPORTING_PERIOD", "YEARLY", "QUARTERLY", "MONTHLY", "SEMIMONTHLY", "WEEKLY", "DAILY" ]
Determines when period names will be reset. The options available are based on the selection for Reporting Cycle. The standard calendar start and end dates are used as boundaries for resetting periods. -
riskLevel: string
Allowed Values:
[ "VERY_HIGH", "HIGH", "MEDIUM", "LOW", "VERY_LOW", "NULL" ]
The risk level assigned to the project.
Projects can have a risk level of very high, high, medium, low, or very low.
You can use risk level to determine what projects should be included in your plans, as well as which projects should be of priority. -
riskMatrixId: integer
(int64)
The risk matrix assigned to the project for calculating project risk scores.
-
riskScore: integer
(int32)
The risk score value is based on the probability and impacts of a risk. It is derived from the probability impact matrix and any associated rules.
-
scheduledFinishDate: string
(date-time)
The calculated latest early finish date, which is based on the schedule most recently generated for the project.
-
securityGuid: string
Maximum Length:
32
Globally unique identifier of a project. -
sequenceNumber: integer
(int32)
Determines the order of appearance of projects in a list.
-
sfPredecessorActivityCount: integer
(int32)
The number of predecessor relationships in the project with a type of Start-to-Finish (SF).
-
sfPredecessorActivityPercent: number
(double)
The percentage of predecessor relationships in the project with a type of Start-to-Finish (SF).
-
softConstraintActivityCount: integer
(int32)
The number of activities in the project with a primary constraint of As Late As Possible, Finish On, Finish On or After, Finish On or Before, Start On, Start On or After, or Start On or Before.
-
softConstraintActivityPercent: number
(double)
The percentage of activities in the project with a primary constraint of As Late As Possible, Finish On, Finish On or After, Finish On or Before, Start On, Start On or After, or Start On or Before.
-
sourceId: string
Maximum Length:
255
The unique identifier of a project in an external source. -
spendEffectiveDate: string
(date-time)
The month in which an actuals value was last added to the project.
-
spendFinishDate: string
(date-time)
The finish date for the project actuals.
-
spendStartDate: string
(date-time)
The start date for the project actuals.
-
ssPredecessorActivityCount: integer
(int32)
The number of predecessor relationships in the project with a type of Start-to-Start (SS).
-
ssPredecessorActivityPercent: number
(double)
The percentage of predecessor relationships in the project with a type of Start-to-Start (SS).
-
startDate: string
(date-time)
The date on which work on the project starts.
This value can be entered manually or can be imported. -
startDateVariance: number
(double)
The duration between the project's start date and the baseline's start date.
When the field value is generated through a P6 EPPM connection, then it represents the duration between the start date in the current project and the baseline start date.
This value can only be imported. -
stateCode: string
Minimum Length:
0
Maximum Length:2
A unique identifier for the state or province. -
stateName: string
Minimum Length:
0
Maximum Length:200
The state, region, or province of a location. -
status: string
Allowed Values:
[ "PROPOSAL", "REJECTED", "PLANNED", "ACTIVE", "INACTIVE", "COMPLETE" ]
The current status of a project.
Proposal: The project is a project proposal and has not been extensively planned nor accrued any costs.
Rejected: The project proposal has been rejected and will not be initiated as a project.
Planned: The project is currently planned for execution. Project managers input expected project costs and other project data during this stage.
Active: The project is currently active and being executed.
Inactive: The project has been rendered inactive and will temporarily accrue no costs.
Complete: The project has been successfully completed and will no longer accrue costs. -
strgyPriorityNum: integer
(int64)
Minimum Value:
1
Maximum Value:10000
Default Value:500
The project's priority in the strategic plan.
This priority value ranges from 1 to 10,000 with a default of 500. Use of the priority value, such as whether to place higher priority at the lower end of the scale, toward the endpoint 1, or at the higher end, toward 10,000, is at the discretion of the user. This field is not used for calculating data. -
totalActivityCount: integer
(int32)
The total number of activities in the project.
-
updateDate: string
(date-time)
Date when the record was last updated.
-
websiteUrl: string
Minimum Length:
0
Maximum Length:200
The link to a website related to the project. -
workspaceCode: string
Minimum Length:
0
Maximum Length:60
The user-specified identifier of the project's workspace. -
workspaceId: integer
(int64)
The unique identifier for the workspace.The workspace object can also be identified by its unique criteria.
Nested Schema : codeValuesProject
Type:
array
The list of code values for a project. This entity can only be used to assign codeValues or create codeValues on the fly.
Show Source
-
Array of:
object ApiEntityCodeValueProject
Title:
ApiEntityCodeValueProject
This entity represents a CodeValueProject object, a unique CodeValueProject object can be identified by the following combinations of the fields.- codeValueProjectId
- codeValueId
- codeValueCode,codeTypeId
- codeValueCode,codeTypeCode
- codeValueCode,codeTypeCode,projectCode
Nested Schema : configuredFields
Type:
array
The list of configured fields for a project.
Show Source
-
Array of:
object ApiEntityProjectConfiguredFieldValue
Title:
ApiEntityProjectConfiguredFieldValue
Nested Schema : copyCustomLogTypes
Type:
array
Name of custom log types from the project or project template to be copied to create a new project.
Show Source
Nested Schema : copyOptions
Type:
object
The copy options available for a project.This is a map field which takes key-value pairs to indicate the objects from the project or project template to be copied to create a new project.If the object is not specified in the map with a value of true, then by default the value will be considered false and the object will not be copied to the new project.Map Keys (Allowed Values) : ACTIVITY, RELATIONSHIP, RESOURCE, ROLE, ASSIGNMENT, TASK, TASK_HANDOFFS, RISK, MATRIX, ACTIVITY_UNCERTAINITY, WBS, AUTO_NUMBERING, MANAGER, PROJECT_SETTINGS, CALENDAR, UOM, MONTECARLO_SETTING, CUSTOM_LOG, PROJECT_CODE, PROJECT_CALENDAR Example : { "ACTIVITY" : true, "RESOURCE" : true } Note: When either "RESOURCE" or "ROLE" has to be copied from a project, both of them should be sent in the request as "true".
Nested Schema : image
The image associated with a project.
Match All
Show Source
-
object
ApiEntityProjectImage
Title:
ApiEntityProjectImage
Nested Schema : projectAutoNumber
Type:
array
The autonumber settings of a project.
Show Source
-
Array of:
object ApiEntityProjectAutoNumber
Title:
ApiEntityProjectAutoNumber
Nested Schema : projectCashFlows
Type:
array
The cash flow of a project.
Show Source
-
Array of:
object ApiEntityProjectCashFlow
Title:
ApiEntityProjectCashFlow
Nested Schema : projectFinancial
The financial fields associated with a project.
Match All
Show Source
-
object
ApiEntityProjectFinancial
Title:
ApiEntityProjectFinancial
Nested Schema : projectIntegrationSourceDetails
The integration source details associated with a project.
Match All
Show Source
-
object
ApiEntityProjectIntegrationSource
Title:
ApiEntityProjectIntegrationSource
Nested Schema : projectSettings
Type:
array
The project settings associated with the project.
Show Source
-
Array of:
object ApiEntityProjectSetting
Title:
ApiEntityProjectSetting
Nested Schema : ApiEntityCodeValueProject
Type:
object
Title:
ApiEntityCodeValueProject
This entity represents a CodeValueProject object, a unique CodeValueProject object can be identified by the following combinations of the fields.
Show Source
- codeValueProjectId
- codeValueId
- codeValueCode,codeTypeId
- codeValueCode,codeTypeCode
- codeValueCode,codeTypeCode,projectCode
-
action: string
Allowed Values:
[ "DELETE" ]
Provide a value for this field during object update to delete code value assigned to the object. -
codeTypeCode: string
Minimum Length:
0
Maximum Length:60
This field displays the name of a code or value. -
codeTypeId(required): integer
(int64)
The unique identifier for the code type.The code type object can also be identified by its unique criteria.
-
codeTypeName: string
Minimum Length:
0
Maximum Length:255
The name of a code or value. -
codeValueCode(required): string
Minimum Length:
1
Maximum Length:60
The unique identifier for the code value. -
codeValueId: integer
(int64)
The unique identifier for the code value.
-
codeValueName: string
Minimum Length:
1
Maximum Length:255
The name of the code value. -
codeValueProjectId: integer
(int64)
The unique identifier of the workspace where the code value was created. This value should not be provided in create operation request data, however, it is required for update requests.
-
link: string
(url)
The self-link to the object. This field is populated only in the responses generated by the batch create APIs.
-
parentId: integer
(int64)
The unique identifier of a parent code value.
-
projectCode: string
Minimum Length:
1
Maximum Length:60
The code of a Project of a Project CodeType. -
projectId: integer
(int64)
The unique identifier for the project.
-
sequenceNumber: integer
(int32)
The number that specifies the position of the code value item within the code type list.
-
updateDate: string
(date-time)
Date when the record was last updated.
Nested Schema : ApiEntityProjectConfiguredFieldValue
Type:
object
Title:
Show Source
ApiEntityProjectConfiguredFieldValue
-
action: string
Allowed Values:
[ "DELETE" ]
Provide value for this field during object update to delete the assigned configured field value. -
columnDefinitionId: integer
(int64)
Unique identifier of the column. This value should not be provided in create operation request data, however, it is required for update requests.
-
columnLabel: string
Minimum Length:
1
Maximum Length:100
The user-specified UDF column label. -
columnName: string
Minimum Length:
1
Maximum Length:100
The user-specified UDF column name. -
costValue: number
This holds values for Cost type configured fields in the base currency conversion. Input should be provided in numberValue field, in currency of record.
-
costValueWorkspace1: number
(double)
This holds values for Cost type configured fields in the workspace1 currency conversion.
-
costValueWorkspace2: number
(double)
This holds values for Cost type configured fields in the workspace2 currency conversion.
-
costValueWorkspace3: number
(double)
This holds values for Cost type configured fields in the workspace3 currency conversion.
-
dateValue: string
(date-time)
This holds values for Date type configured fields.
-
exceptionMessage: string
Maximum Length:
4000
Provides the error message for why the formula calculation resulted in an error. -
hasException: boolean
Determines if formula calculation hit an error calculating a value for this field.
-
link: string
(url)
The self-link to the object. This field is populated only in the responses generated by the batch create APIs.
-
numberValue: number
This holds values for Number, Integer and Cost type configured fields. Input for the cost configured field should be provided in the currency of record. For example project level currency in case of Activity, base currency for Company, workspace currency for Funds and record level currency for Project Actuals etc. configured fields.
-
projectConfiguredFieldValueId: integer
(int64)
The unique identifier for the Project Configured Field.
-
projectId: integer
(int64)
The system-generated identifier for an Project.
-
textValue: string
Maximum Length:
4000
This holds values for Boolean, List and Text type configured fields. -
updateDate: string
(date-time)
Date when the record was last updated.
Nested Schema : ApiEntityProjectImage
Type:
object
Title:
Show Source
ApiEntityProjectImage
-
image: array
image
The image file uploaded to the project.
Displayed throughout the application in areas like news feeds. -
imageType: string
Allowed Values:
[ "PNG", "JPEG", "GIF" ]
The mime type of an image associated with a project. -
link: string
(url)
The self-link to the object. This field is populated only in the responses generated by the batch create APIs.
-
project: integer
(int64)
The system-generated identifier of a project.
-
projectImageId: integer
(int64)
The system-generated identifier of a project image. This value should not be provided in create operation request data, however, it is required for update requests.
-
updateDate: string
(date-time)
Date when the record was last updated.
Nested Schema : image
Type:
array
The image file uploaded to the project.
Displayed throughout the application in areas like news feeds.
Show Source
Displayed throughout the application in areas like news feeds.
Nested Schema : ApiEntityProjectAutoNumber
Type:
object
Title:
Show Source
ApiEntityProjectAutoNumber
-
area: string
Allowed Values:
[ "IDEA", "PROGRAM", "PROJECT", "ACTIVITY", "SCHEDULE_SCENARIO", "ACTIVITY_ASSIGNMENT", "WBS", "SCOPE_ITEM", "SCOPE_ASSIGNMENT", "CHANGE_ITEM", "WORK_PACKAGE", "CHANGE_REQUEST", "CONTRACT", "COMMITMENT", "BUDGET_CHANGE", "BUDGET_TRANSFER", "PROGRAM_BUDGET", "PROGRAM_BUDGET_CHANGE", "PROGRAM_BUDGET_TRANSFER", "CHANGE_ORDER", "POTENTIAL_CHANGE_ORDER", "PAYMENT_APPLICATION", "RISK", "PROG_RISK", "ACTUALS", "WORK_MANAGER_TASK", "CONSTRAINT", "SUBMITTAL", "CHANGE_EVENT", "RFI", "CUSTOM_LOGS_ITEM", "RESOURCE" ]
Identifies the type of object used for auto numbering. -
increment: integer
(int32)
Minimum Value:
1
Maximum Value:99999
The number to increment the starting number by. -
link: string
(url)
The self-link to the object. This field is populated only in the responses generated by the batch create APIs.
-
name: string
Maximum Length:
50
This is an internal field. -
prefix: string
Minimum Length:
0
Maximum Length:20
The initial characters for the auto numbering sequence. -
projectAutoNumberId: integer
(int64)
The auto generated ID for the object. This value should not be provided in create operation request data, however, it is required for update requests.
-
projectId: integer
(int64)
The unique identifier of a project.
-
suffix: string
Minimum Length:
1
Maximum Length:40
The first number in the auto numbering sequence. -
updateDate: string
(date-time)
Date when the record was last updated.
Nested Schema : ApiEntityProjectCashFlow
Type:
object
Title:
Show Source
ApiEntityProjectCashFlow
-
actualCapitalCost: number
(double)
The time phased actual capital spends incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the base currency with specified exchange rate. -
actualCapitalCostProject: number
(double)
The time phased actual capital spends incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the project currency. -
actualCapitalCostWorkspace1: number
(double)
The time phased actual capital spends incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the workspace currency. -
actualCapitalCostWorkspace2: number
(double)
The time phased actual capital spends incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the workspace currency. -
actualCapitalCostWorkspace3: number
(double)
The time phased actual capital spends incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the workspace currency. -
actualCost: number
(double)
Total costs accrued on a project within a given time period.
The Actual Cost data for the project's life cycle is pulled from the P6 EPPM schedule.
Actual Cost data is only available when the application is connected with P6 EPPM and is not editable. -
actualCostProject: number
(double)
The time phased actual spends incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the project currency. -
actualCostWorkspace1: number
(double)
The time phased actual spends incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the workspace currency. -
actualCostWorkspace2: number
(double)
The time phased actual spends incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the workspace currency. -
actualCostWorkspace3: number
(double)
The time phased actual spends incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the workspace currency. -
actualExpenseCost: number
(double)
The time phased actual expense spends incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the base currency with specified exchange rate. -
actualExpenseCostProject: number
(double)
The time phased actual expense spends incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the project currency. -
actualExpenseCostWorkspace1: number
(double)
The time phased actual expense spends incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the workspace currency. -
actualExpenseCostWorkspace2: number
(double)
The time phased actual expense spends incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the workspace currency. -
actualExpenseCostWorkspace3: number
(double)
The time phased actual expense spends incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the workspace currency. -
actualForecastVar: number
(double)
The total and time phased variance between the project's Actuals and Forecast. This value is based on the base currency with specified exchange rate.
-
actualForecastVarProject: number
(double)
The total and time phased variance between the project's Actuals and Forecast. This value is based on the project currency.
-
actualForecastVarWorkspace1: number
(double)
The total and time phased variance between the project's Actuals and Forecast. This value is based on the workspace currency.
-
actualForecastVarWorkspace2: number
(double)
The total and time phased variance between the project's Actuals and Forecast. This value is based on the workspace currency.
-
actualForecastVarWorkspace3: number
(double)
The total and time phased variance between the project's Actuals and Forecast. This value is based on the workspace currency.
-
atCompletionCost: number
(double)
Calculated as the sum of the Actual Costs plus Remaining Costs for the project.
You can copy the values of At Completion into the project's Forecast to accurately track the time phased costs of the project.
At Completion data is only available when the application is connected to P6 EPPM and is not editable.
The At Completion field is populated with the At Completion Total Cost from the project's P6 EPPM schedule. This value is based on the base currency with specified exchange rate. -
atCompletionCostProject: number
(double)
Calculated as the sum of the Actual Costs plus Remaining Costs for the project.
You can copy the values of At Completion into the project's Forecast to accurately track the time phased costs of the project.
At Completion data is only available when the application is connected to P6 EPPM and is not editable.
The At Completion field is populated with the At Completion Total Cost from the project's P6 EPPM schedule. This value is based on the project currency. -
atCompletionCostWorkspace1: number
(double)
Calculated as the sum of the Actual Costs plus Remaining Costs for the project.
You can copy the values of At Completion into the project's Forecast to accurately track the time phased costs of the project.
At Completion data is only available when the application is connected to P6 EPPM and is not editable.
The At Completion field is populated with the At Completion Total Cost from the project's P6 EPPM schedule. This value is based on the workspace currency. -
atCompletionCostWorkspace2: number
(double)
Calculated as the sum of the Actual Costs plus Remaining Costs for the project.
You can copy the values of At Completion into the project's Forecast to accurately track the time phased costs of the project.
At Completion data is only available when the application is connected to P6 EPPM and is not editable.
The At Completion field is populated with the At Completion Total Cost from the project's P6 EPPM schedule. This value is based on the workspace currency. -
atCompletionCostWorkspace3: number
(double)
Calculated as the sum of the Actual Costs plus Remaining Costs for the project.
You can copy the values of At Completion into the project's Forecast to accurately track the time phased costs of the project.
At Completion data is only available when the application is connected to P6 EPPM and is not editable.
The At Completion field is populated with the At Completion Total Cost from the project's P6 EPPM schedule. This value is based on the workspace currency. -
benefits: number
(double)
Project benefits is the income or positive cash flow from which all charges, costs, and expenses are subtracted to arrive at the net income. Also called sales, turnover, or revenue. This value is based on the base currency with specified exchange rate.
-
benefitsProject: number
(double)
Project benefits is the income or positive cash flow from which all charges, costs, and expenses are subtracted to arrive at the net income. Also called sales, turnover, or revenue. This value is based on the project currency.
-
benefitsWorkspace1: number
(double)
Project benefits is the income or positive cash flow from which all charges, costs, and expenses are subtracted to arrive at the net income. Also called sales, turnover, or revenue. This value is based on the workspace currency.
-
benefitsWorkspace2: number
(double)
Project benefits is the income or positive cash flow from which all charges, costs, and expenses are subtracted to arrive at the net income. Also called sales, turnover, or revenue. This value is based on the workspace currency.
-
benefitsWorkspace3: number
(double)
Project benefits is the income or positive cash flow from which all charges, costs, and expenses are subtracted to arrive at the net income. Also called sales, turnover, or revenue. This value is based on the workspace currency.
-
currentApprovedBudget: number
(double)
The approved time phased budget currently allocated to the project.
Current Approved Budget values are derived from the Proposed Budget set by the capital planner.
A Proposed Budget becomes a Current Approved Budget after the capital plan scenario has undergone the approval process. This value is based on the base currency with specified exchange rate. -
currentApprovedBudgetCapitalCost: number
(double)
The capital budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process. This value is based on the base currency with specified exchange rate. -
currentApprovedBudgetCapitalCostProject: number
(double)
The capital budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process. This value is based on the project currency. -
currentApprovedBudgetCapitalCostWorkspace1: number
(double)
The capital budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process. This value is based on the workspace currency. -
currentApprovedBudgetCapitalCostWorkspace2: number
(double)
The capital budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process. This value is based on the workspace currency. -
currentApprovedBudgetCapitalCostWorkspace3: number
(double)
The capital budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process. This value is based on the workspace currency. -
currentApprovedBudgetExpenseCost: number
(double)
The expense budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process. This value is based on the base currency with specified exchange rate. -
currentApprovedBudgetExpenseCostProject: number
(double)
The expense budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process. This value is based on the project currency. -
currentApprovedBudgetExpenseCostWorkspace1: number
(double)
The expense budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process. This value is based on the workspace currency. -
currentApprovedBudgetExpenseCostWorkspace2: number
(double)
The expense budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process. This value is based on the workspace currency. -
currentApprovedBudgetExpenseCostWorkspace3: number
(double)
The expense budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process. This value is based on the workspace currency. -
currentApprovedBudgetProject: number
(double)
The approved time phased budget currently allocated to the project.
Current Approved Budget values are derived from the Proposed Budget set by the capital planner.
A Proposed Budget becomes a Current Approved Budget after the capital plan scenario has undergone the approval process. This value is based on the project currency. -
currentApprovedBudgetWorkspace1: number
(double)
The budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process.
This value is based on the workspace1 currency. -
currentApprovedBudgetWorkspace2: number
(double)
The budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process.
This value is based on the workspace2 currency. -
currentApprovedBudgetWorkspace3: number
(double)
The budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process.
This value is based on the workspace3 currency. -
currentApprovedSpendVariance: number
(double)
The total and time phased variance between the project's Approved Budget and Actuals.This value is based on the base currency with specified exchange rate.
-
currentApprovedSpendVarianceProject: number
(double)
The total and time phased variance between the project's Approved Budget and Actuals. This value is based on the project currency.
-
currentApprovedSpendVarianceWorkspace1: number
(double)
The total and time phased variance between the project's Approved Budget and Actuals. This value is based on the base currency with specified exchange rate. This value is based on the workspace1 currency.
-
currentApprovedSpendVarianceWorkspace2: number
(double)
The total and time phased variance between the project's Approved Budget and Actuals. This value is based on the base currency with specified exchange rate. This value is based on the workspace2 currency.
-
currentApprovedSpendVarianceWorkspace3: number
(double)
The total and time phased variance between the project's Approved Budget and Actuals. This value is based on the base currency with specified exchange rate. This value is based on the workspace3 currency.
-
forecastCapitalCost: number
(double)
The time phased estimation of a project's remaining capital costs.
After projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle.
Project managers can use time phasing to portray a detailed prediction of when the project will accrue its highest actuals. This value is based on the base currency with specified exchange rate. -
forecastCapitalCostProject: number
(double)
The time phased estimation of a project's remaining capital costs.
After projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle.
Project managers can use time phasing to portray a detailed prediction of when the project will accrue its highest actuals. This value is based on the project currency. -
forecastCapitalCostWorkspace1: number
(double)
The time phased estimation of a project's remaining capital costs.
After projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle.
Project managers can use time phasing to portray a detailed prediction of when the project will accrue its highest actuals. This value is based on the workspace currency. -
forecastCapitalCostWorkspace2: number
(double)
The time phased estimation of a project's remaining capital costs.
After projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle.
Project managers can use time phasing to portray a detailed prediction of when the project will accrue its highest actuals. This value is based on the workspace currency. -
forecastCapitalCostWorkspace3: number
(double)
The time phased estimation of a project's remaining capital costs.
After projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle.
Project managers can use time phasing to portray a detailed prediction of when the project will accrue its highest actuals. This value is based on the workspace currency. -
forecastCost: number
(double)
The time phased estimation of a project's remaining costs.
After projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle.
Project managers can use time phasing to portray a detailed prediction of when the project will accrue its highest actuals. This value is based on the base currency with specified exchange rate. -
forecastCostProject: number
(double)
The time phased estimation of a project's remaining costs.
After projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle.
Project managers can use time phasing to portray a detailed prediction of when the project will accrue its highest actuals. This value is based on the project currency. -
forecastCostWorkspace1: number
(double)
The time phased estimation of a project's remaining costs.
After projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle.
Project managers can use time phasing to portray a detailed prediction of when the project will accrue its highest actuals. This value is based on the workspace currency. -
forecastCostWorkspace2: number
(double)
The time phased estimation of a project's remaining costs.
After projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle.
Project managers can use time phasing to portray a detailed prediction of when the project will accrue its highest actuals. This value is based on the workspace currency. -
forecastCostWorkspace3: number
(double)
The time phased estimation of a project's remaining costs.
After projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle.
Project managers can use time phasing to portray a detailed prediction of when the project will accrue its highest actuals. This value is based on the workspace currency. -
forecastCurrApprVar: number
(double)
The total and time phased variance between the project's Forecast and Current Approved Budget. This value is based on the base currency with specified exchange rate.
-
forecastCurrApprVarProject: number
(double)
The total and time phased variance between the project's Forecast and Current Approved Budget. This value is based on the project currency.
-
forecastCurrApprVarWorkspace1: number
(double)
The total and time phased variance between the project's Forecast and Approved Budget. This value is based on the base currency with specified exchange rate.
This value is based on the workspace1 currency. -
forecastCurrApprVarWorkspace2: number
(double)
The total and time phased variance between the project's Forecast and Approved Budget. This value is based on the base currency with specified exchange rate.
This value is based on the workspace2 currency. -
forecastCurrApprVarWorkspace3: number
(double)
The total and time phased variance between the project's Forecast and Approved Budget. This value is based on the base currency with specified exchange rate.
This value is based on the workspace3 currency. -
forecastExpenseCost: number
(double)
The time phased estimation of a project's remaining expense costs.
After projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle.
Project managers can use time phasing to portray a detailed prediction of when the project will accrue its highest actuals. This value is based on the base currency with specified exchange rate. -
forecastExpenseCostProject: number
(double)
The time phased estimation of a project's remaining expense costs.
After projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle.
Project managers can use time phasing to portray a detailed prediction of when the project will accrue its highest actuals. This value is based on the project currency. -
forecastExpenseCostWorkspace1: number
(double)
The time phased estimation of a project's remaining expense costs.
After projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle.
Project managers can use time phasing to portray a detailed prediction of when the project will accrue its highest actuals. This value is based on the workspace currency. -
forecastExpenseCostWorkspace2: number
(double)
The time phased estimation of a project's remaining expense costs.
After projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle.
Project managers can use time phasing to portray a detailed prediction of when the project will accrue its highest actuals. This value is based on the workspace currency. -
forecastExpenseCostWorkspace3: number
(double)
The time phased estimation of a project's remaining expense costs.
After projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle.
Project managers can use time phasing to portray a detailed prediction of when the project will accrue its highest actuals. This value is based on the workspace currency. -
link: string
(url)
The self-link to the object. This field is populated only in the responses generated by the batch create APIs.
-
month: integer
(int32)
The time period during which budget planning for the project takes place in months.
-
plannedBudget: number
(double)
The planned time phased cost of a project as defined by the project manager.
Project managers can control the time phased allocations of a project's Planned Budget giving planner a sense of when the highest costs may be accrued on the project.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the base currency with specified exchange rate. -
plannedBudgetCapital: number
(double)
The planned time phased capital cost of a project as defined by the project manager.
Project managers can control the time phased allocations of a project's Planned Budget giving planner a sense of when the highest costs may be accrued on the project.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the base currency with specified exchange rate. -
plannedBudgetCapitalProject: number
(double)
The planned time phased capital cost in project currency of a project as defined by the project manager.
Project managers can control the time phased allocations of a project's Planned Budget giving planner a sense of when the highest costs may be accrued on the project.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the project currency. -
plannedBudgetCapitalWorkspace1: number
(double)
The planned time phased capital cost in project currency of a project as defined by the project manager.
Project managers can control the time phased allocations of a project's Planned Budget giving planner a sense of when the highest costs may be accrued on the project.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the workspace currency. -
plannedBudgetCapitalWorkspace2: number
(double)
The planned time phased capital cost in project currency of a project as defined by the project manager.
Project managers can control the time phased allocations of a project's Planned Budget giving planner a sense of when the highest costs may be accrued on the project.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the workspace currency. -
plannedBudgetCapitalWorkspace3: number
(double)
The planned time phased capital cost in project currency of a project as defined by the project manager.
Project managers can control the time phased allocations of a project's Planned Budget giving planner a sense of when the highest costs may be accrued on the project.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the workspace currency. -
plannedBudgetExpense: number
(double)
The planned time phased expense cost of a project as defined by the project manager.
Project managers can control the time phased allocations of a project's Planned Budget giving planner a sense of when the highest costs may be accrued on the project.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the base currency with specified exchange rate. -
plannedBudgetExpenseProject: number
(double)
The planned time phased expense cost in project currency of a project as defined by the project manager.
Project managers can control the time phased allocations of a project's Planned Budget giving planner a sense of when the highest costs may be accrued on the project.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the project currency. -
plannedBudgetExpenseWorkspace1: number
(double)
The planned time phased expense cost in project currency of a project as defined by the project manager.
Project managers can control the time phased allocations of a project's Planned Budget giving planner a sense of when the highest costs may be accrued on the project.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the workspace currency. -
plannedBudgetExpenseWorkspace2: number
(double)
The planned time phased expense cost in project currency of a project as defined by the project manager.
Project managers can control the time phased allocations of a project's Planned Budget giving planner a sense of when the highest costs may be accrued on the project.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the workspace currency. -
plannedBudgetExpenseWorkspace3: number
(double)
The planned time phased expense cost in project currency of a project as defined by the project manager.
Project managers can control the time phased allocations of a project's Planned Budget giving planner a sense of when the highest costs may be accrued on the project.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the workspace currency. -
plannedBudgetProject: number
(double)
The planned time phased cost in project currency of a project as defined by the project manager.
Project managers can control the time phased allocations of a project's Planned Budget giving planner a sense of when the highest costs may be accrued on the project.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the project currency. -
plannedBudgetWorkspace1: number
(double)
The planned time phased cost in project currency of a project as defined by the project manager.
Project managers can control the time phased allocations of a project's Planned Budget giving planner a sense of when the highest costs may be accrued on the project.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the workspace currency. -
plannedBudgetWorkspace2: number
(double)
The planned time phased cost in project currency of a project as defined by the project manager.
Project managers can control the time phased allocations of a project's Planned Budget giving planner a sense of when the highest costs may be accrued on the project.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the workspace currency. -
plannedBudgetWorkspace3: number
(double)
The planned time phased cost in project currency of a project as defined by the project manager.
Project managers can control the time phased allocations of a project's Planned Budget giving planner a sense of when the highest costs may be accrued on the project.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the workspace currency. -
projectId: integer
(int64)
The unique identifier for the project.
-
projectPhaseFinancialId: integer
(int64)
The unique internal identifier for the project's time-phased cost spread. This value should not be provided in create operation request data, however, it is required for update requests.
-
proposedBudget: number
(double)
The time phased Proposed Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own Planned Budgets and project Forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Becomes the projects Current Approved Budget after the portfolio budget plan scenario is approved. This value is based on the base currency with specified exchange rate. -
proposedBudgetCapitalCost: number
(double)
The Proposed capital Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own planned budgets and project forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Proposed Budget becomes the project's Approved Budget after the portfolio budget plan scenario is approved. This value is based on the base currency with specified exchange rate. -
proposedBudgetCapitalCostProject: number
(double)
The Proposed capital Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own planned budgets and project forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Proposed Budget becomes the project's Approved Budget after the portfolio budget plan scenario is approved. This value is based on the project currency. -
proposedBudgetCapitalCostWorkspace1: number
(double)
The Proposed capital Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own planned budgets and project forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Proposed Budget becomes the project's Approved Budget after the portfolio budget plan scenario is approved. This value is based on the workspace currency. -
proposedBudgetCapitalCostWorkspace2: number
(double)
The Proposed capital Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own planned budgets and project forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Proposed Budget becomes the project's Approved Budget after the portfolio budget plan scenario is approved. This value is based on the workspace currency. -
proposedBudgetCapitalCostWorkspace3: number
(double)
The Proposed capital Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own planned budgets and project forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Proposed Budget becomes the project's Approved Budget after the portfolio budget plan scenario is approved. This value is based on the workspace currency. -
proposedBudgetExpenseCost: number
(double)
The Proposed expense Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own planned budgets and project forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Proposed Budget becomes the project's Approved Budget after the portfolio budget plan scenario is approved. This value is based on the base currency with specified exchange rate. -
proposedBudgetExpenseCostProject: number
(double)
The Proposed expense Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own planned budgets and project forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Proposed Budget becomes the project's Approved Budget after the portfolio budget plan scenario is approved. This value is based on the project currency. -
proposedBudgetExpenseCostWorkspace1: number
(double)
The Proposed expense Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own planned budgets and project forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Proposed Budget becomes the project's Approved Budget after the portfolio budget plan scenario is approved. This value is based on the workspace currency. -
proposedBudgetExpenseCostWorkspace2: number
(double)
The Proposed expense Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own planned budgets and project forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Proposed Budget becomes the project's Approved Budget after the portfolio budget plan scenario is approved. This value is based on the workspace currency. -
proposedBudgetExpenseCostWorkspace3: number
(double)
The Proposed expense Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own planned budgets and project forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Proposed Budget becomes the project's Approved Budget after the portfolio budget plan scenario is approved. This value is based on the workspace currency. -
proposedBudgetProject: number
(double)
The time phased Proposed Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own Planned Budgets and project Forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Becomes the projects Current Approved Budget after the portfolio budget plan scenario is approved. This value is based on the project currency. -
proposedBudgetWorkspace1: number
(double)
The time phased Proposed Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own Planned Budgets and project Forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Becomes the projects Current Approved Budget after the portfolio budget plan scenario is approved. This value is based on the workspace currency. -
proposedBudgetWorkspace2: number
(double)
The time phased Proposed Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own Planned Budgets and project Forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Becomes the projects Current Approved Budget after the portfolio budget plan scenario is approved. This value is based on the workspace currency. -
proposedBudgetWorkspace3: number
(double)
The time phased Proposed Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own Planned Budgets and project Forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Becomes the projects Current Approved Budget after the portfolio budget plan scenario is approved. This value is based on the workspace currency. -
proposedForecastVariance: number
(double)
The total and time phased variance between the project's Proposed Budget and Forecast. This value is based on the base currency with specified exchange rate.
-
proposedForecastVarianceProject: number
(double)
The total and time phased variance between the project's Proposed Budget and Forecast. This value is based on the project currency.
-
proposedForecastVarianceWorkspace1: number
(double)
The total and time phased variance between the project's Proposed Budget and Forecast. This value is based on the base currency with specified exchange rate.
This value is based on the workspace1 currency. -
proposedForecastVarianceWorkspace2: number
(double)
The total and time phased variance between the project's Proposed Budget and Forecast. This value is based on the base currency with specified exchange rate.
This value is based on the workspace2 currency. -
proposedForecastVarianceWorkspace3: number
(double)
The total and time phased variance between the project's Proposed Budget and Forecast. This value is based on the base currency with specified exchange rate.
This value is based on the workspace3 currency. -
proposedPlannedVar: number
(double)
The total and time phased variance between the project's Proposed Budget and Planned Budget. This value is based on the base currency with specified exchange rate.
-
proposedPlannedVarProject: number
(double)
The total and time phased variance between the project's Proposed Budget and Planned Budget. This value is based on the project currency.
-
proposedPlannedVarWorkspace1: number
(double)
The total and time phased variance between the project's Proposed Budget and Planned Budget. This value is based on the base currency with specified exchange rate.
This value is based on the workspace1 currency. -
proposedPlannedVarWorkspace2: number
(double)
The total and time phased variance between the project's Proposed Budget and Planned Budget. This value is based on the base currency with specified exchange rate.
This value is based on the workspace2 currency. -
proposedPlannedVarWorkspace3: number
(double)
The total and time phased variance between the project's Proposed Budget and Planned Budget. This value is based on the base currency with specified exchange rate.
This value is based on the workspace3 currency. -
spendCost: number
(double)
The time phased actual spends incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the base currency with specified exchange rate. -
spendCostProject: number
(double)
The time phased actual spends incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the project currency. -
spendCostWorkspace1: number
(double)
The time phased actual spends incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the workspace currency. -
spendCostWorkspace2: number
(double)
The time phased actual spends incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the workspace currency. -
spendCostWorkspace3: number
(double)
The time phased actual spends incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the workspace currency. -
spendPlannedVariance: number
(double)
The total and time phased variance between the project's Actuals and Planned Budget. This value is based on the base currency with specified exchange rate.
-
spendPlannedVarianceProject: number
(double)
The total and time phased variance between the project's Actuals and Planned Budget. This value is based on the project currency.
-
spendPlannedVarianceWorkspace1: number
(double)
The total and time phased variance between the project's Actuals and Planned Budget. This value is based on the workspace currency.
-
spendPlannedVarianceWorkspace2: number
(double)
The total and time phased variance between the project's Actuals and Planned Budget. This value is based on the workspace currency.
-
spendPlannedVarianceWorkspace3: number
(double)
The total and time phased variance between the project's Actuals and Planned Budget. This value is based on the workspace currency.
-
spreadDate: string
(date-time)
The starting date for a time phase of the project life cycle.
-
updateDate: string
(date-time)
Date when the record was last updated.
-
year: integer
(int32)
The time period during which budget planning for the project takes place in years.
-
yearEndForecastCost: number
(double)
Total forecast at the end of year actuals till date, with respect to the current year. This value is based on the base currency with specified exchange rate.
-
yearEndForecastCostProject: number
(double)
Total forecast at the end of year actuals till date, with respect to the current year. This value is based on the project currency.
-
yearEndForecastCostWorkspace1: number
(double)
Total forecast at the end of year actuals till date, with respect to the current year. This value is based on the workspace currency.
-
yearEndForecastCostWorkspace2: number
(double)
Total forecast at the end of year actuals till date, with respect to the current year. This value is based on the workspace currency.
-
yearEndForecastCostWorkspace3: number
(double)
Total forecast at the end of year actuals till date, with respect to the current year. This value is based on the workspace currency.
-
ytdActualCost: number
(double)
A measurement of capital spent on a project starting from the beginning of the year up to the present date.
YTD Actuals provides an overview of the total amount of actuals accrued on a project over the current Period Year. This value is based on the base currency with specified exchange rate. -
ytdActualCostProject: number
(double)
A measurement of capital spent on a project starting from the beginning of the year up to the present date.
YTD Actuals provides an overview of the total amount of actuals accrued on a project over the current Period Year. This value is based on the project currency. -
ytdActualCostWorkspace1: number
(double)
A measurement of capital spent on a project starting from the beginning of the year up to the present date.
YTD Actuals provides an overview of the total amount of actuals accrued on a project over the current Period Year. This value is based on the workspace currency. -
ytdActualCostWorkspace2: number
(double)
A measurement of capital spent on a project starting from the beginning of the year up to the present date.
YTD Actuals provides an overview of the total amount of actuals accrued on a project over the current Period Year. This value is based on the workspace currency. -
ytdActualCostWorkspace3: number
(double)
A measurement of capital spent on a project starting from the beginning of the year up to the present date.
YTD Actuals provides an overview of the total amount of actuals accrued on a project over the current Period Year. This value is based on the workspace currency.
Nested Schema : ApiEntityProjectFinancial
Type:
object
Title:
Show Source
ApiEntityProjectFinancial
-
actualCapitalCost: number
(double)
Total capital costs accrued on a project within a given time period.
The Actual Cost data for the project's life cycle is pulled from the P6 EPPM schedule.
Actual Cost data is only available when the application is connected with P6 EPPM and is not editable. This value is based on the base currency with specified exchange rate. -
actualCapitalCostDistributed: number
(double)
The capital amount of project actuals currently allocated across the project timescale. This value is based on the base currency with specified exchange rate.
-
actualCapitalCostDistributedProject: number
(double)
The capital amount of project actuals currently allocated across the project timescale. This value is based on the project currency.
-
actualCapitalCostDistributedWorkspace1: number
(double)
The capital amount of project actuals currently allocated across the project timescale. This value is based on the workspace currency.
-
actualCapitalCostDistributedWorkspace2: number
(double)
The capital amount of project actuals currently allocated across the project timescale. This value is based on the workspace currency.
-
actualCapitalCostDistributedWorkspace3: number
(double)
The capital amount of project actuals currently allocated across the project timescale. This value is based on the workspace currency.
-
actualCapitalCostPresentValue: number
(double)
The capital present value, also known as discounted value, of the overall project actuals. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the base currency with specified exchange rate.
-
actualCapitalCostPresentValueProject: number
(double)
The present value, also known as discounted value, of the overall project actuals. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the project currency.
-
actualCapitalCostPresentValueWorkspace1: number
(double)
The present value, also known as discounted value, of the overall project actuals. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the workspace currency.
-
actualCapitalCostPresentValueWorkspace2: number
(double)
The present value, also known as discounted value, of the overall project actuals. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the workspace currency.
-
actualCapitalCostPresentValueWorkspace3: number
(double)
The present value, also known as discounted value, of the overall project actuals. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the workspace currency.
-
actualCapitalCostProject: number
(double)
Total capital costs accrued on a project within a given time period.
The Actual Cost data for the project's life cycle is pulled from the P6 EPPM schedule.
Actual Cost data is only available when the application is connected with P6 EPPM and is not editable. This value is based on the project currency. -
actualCapitalCostUnDistributed: number
(double)
The capital amount of project actuals unallocated across the project timescale. This value is based on the base currency with specified exchange rate.
-
actualCapitalCostUnDistributedProject: number
(double)
The capital amount of project actuals unallocated across the project timescale. This value is based on the project currency.
-
actualCapitalCostUnDistributedWorkspace1: number
(double)
The capital amount of project actuals unallocated across the project timescale. This value is based on the workspace currency.
-
actualCapitalCostUnDistributedWorkspace2: number
(double)
The capital amount of project actuals unallocated across the project timescale. This value is based on the workspace currency.
-
actualCapitalCostUnDistributedWorkspace3: number
(double)
The capital amount of project actuals unallocated across the project timescale. This value is based on the workspace currency.
-
actualCapitalCostWorkspace1: number
(double)
Total capital costs accrued on a project within a given time period.
The Actual Cost data for the project's life cycle is pulled from the P6 EPPM schedule.
Actual Cost data is only available when the application is connected with P6 EPPM and is not editable. This value is based on the workspace currency. -
actualCapitalCostWorkspace2: number
(double)
Total capital costs accrued on a project within a given time period.
The Actual Cost data for the project's life cycle is pulled from the P6 EPPM schedule.
Actual Cost data is only available when the application is connected with P6 EPPM and is not editable. This value is based on the workspace currency. -
actualCapitalCostWorkspace3: number
(double)
Total capital costs accrued on a project within a given time period.
The Actual Cost data for the project's life cycle is pulled from the P6 EPPM schedule.
Actual Cost data is only available when the application is connected with P6 EPPM and is not editable. This value is based on the workspace currency. -
actualCost: number
(double)
Total costs accrued on a project within a given time period.
The Actual Cost data for the project's life cycle is pulled from the P6 EPPM schedule when the project is summarized.
The value for actual cost cannot be entered/edited manually through UI. -
actualCostDistributed: number
(double)
The amount of project actuals currently allocated across the project timescale. This value is based on the base currency with specified exchange rate.
-
actualCostDistributedProject: number
(double)
The amount of project actuals currently allocated across the project timescale. This value is based on the project currency.
-
actualCostPresentValue: number
(double)
The present value, also known as discounted value, of the overall project actuals. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the base currency with specified exchange rate.
-
actualCostPresentValueProject: number
(double)
The present value, also known as discounted value, of the overall project actuals. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the project currency.
-
actualCostPresentValueWorkspace1: number
(double)
The present value, also known as discounted value, of the overall project actuals. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the workspace currency.
-
actualCostPresentValueWorkspace2: number
(double)
The present value, also known as discounted value, of the overall project actuals. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the workspace currency.
-
actualCostPresentValueWorkspace3: number
(double)
The present value, also known as discounted value, of the overall project actuals. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the workspace currency.
-
actualCostProject: number
(double)
Total costs accrued on a project within a given time period.
The Actual Cost data for the project's life cycle is pulled from the P6 EPPM schedule.
Actual Cost data is only available when the application is connected with P6 EPPM and is not editable. This value is based on the project currency. -
actualCostUnDistributed: number
(double)
The amount of project actuals unallocated across the project timescale. This value is based on the base currency with specified exchange rate.
-
actualCostUnDistributedProject: number
(double)
The amount of project actuals unallocated across the project timescale. This value is based on the project currency.
-
actualCostWorkspace1: number
(double)
Total costs accrued on a project within a given time period.
The Actual Cost data for the project's life cycle is pulled from the P6 EPPM schedule.
Actual Cost data is only available when the application is connected with P6 EPPM and is not editable. This value is based on the workspace currency. -
actualCostWorkspace2: number
(double)
Total costs accrued on a project within a given time period.
The Actual Cost data for the project's life cycle is pulled from the P6 EPPM schedule.
Actual Cost data is only available when the application is connected with P6 EPPM and is not editable. This value is based on the workspace currency. -
actualCostWorkspace3: number
(double)
Total costs accrued on a project within a given time period.
The Actual Cost data for the project's life cycle is pulled from the P6 EPPM schedule.
Actual Cost data is only available when the application is connected with P6 EPPM and is not editable. This value is based on the workspace currency. -
actualExpenseCost: number
(double)
Total expense costs accrued on a project within a given time period.
The Actual Cost data for the project's life cycle is pulled from the P6 EPPM schedule.
Actual Cost data is only available when the application is connected with P6 EPPM and is not editable. This value is based on the base currency with specified exchange rate. -
actualExpenseCostDistributed: number
(double)
The expense amount of project actuals currently allocated across the project timescale. This value is based on the base currency with specified exchange rate.
-
actualExpenseCostDistributedProject: number
(double)
The expense amount of project actuals currently allocated across the project timescale. This value is based on the project currency.
-
actualExpenseCostDistributedWorkspace1: number
(double)
The expense amount of project actuals currently allocated across the project timescale. This value is based on the workspace currency.
-
actualExpenseCostDistributedWorkspace2: number
(double)
The expense amount of project actuals currently allocated across the project timescale. This value is based on the workspace currency.
-
actualExpenseCostDistributedWorkspace3: number
(double)
The expense amount of project actuals currently allocated across the project timescale. This value is based on the workspace currency.
-
actualExpenseCostPresentValue: number
(double)
The expense present value, also known as discounted value, of the overall project actuals. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the base currency with specified exchange rate.
-
actualExpenseCostPresentValueProject: number
(double)
The present value, also known as discounted value, of the overall project actuals. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the project currency.
-
actualExpenseCostPresentValueWorkspace1: number
(double)
The present value, also known as discounted value, of the overall project actuals. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the workspace currency.
-
actualExpenseCostPresentValueWorkspace2: number
(double)
The present value, also known as discounted value, of the overall project actuals. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the workspace currency.
-
actualExpenseCostPresentValueWorkspace3: number
(double)
The present value, also known as discounted value, of the overall project actuals. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the workspace currency.
-
actualExpenseCostProject: number
(double)
Total expense costs accrued on a project within a given time period.
The Actual Cost data for the project's life cycle is pulled from the P6 EPPM schedule.
Actual Cost data is only available when the application is connected with P6 EPPM and is not editable. This value is based on the project currency. -
actualExpenseCostUnDistributed: number
(double)
The expense amount of project actuals unallocated across the project timescale. This value is based on the base currency with specified exchange rate.
-
actualExpenseCostUnDistributedProject: number
(double)
The expense amount of project actuals unallocated across the project timescale. This value is based on the project currency.
-
actualExpenseCostUnDistributedWorkspace1: number
(double)
The expense amount of project actuals unallocated across the project timescale. This value is based on the workspace currency.
-
actualExpenseCostUnDistributedWorkspace2: number
(double)
The expense amount of project actuals unallocated across the project timescale. This value is based on the workspace currency.
-
actualExpenseCostUnDistributedWorkspace3: number
(double)
The expense amount of project actuals unallocated across the project timescale. This value is based on the workspace currency.
-
actualExpenseCostWorkspace1: number
(double)
Total expense costs accrued on a project within a given time period.
The Actual Cost data for the project's life cycle is pulled from the P6 EPPM schedule.
Actual Cost data is only available when the application is connected with P6 EPPM and is not editable. This value is based on the workspace currency. -
actualExpenseCostWorkspace2: number
(double)
Total expense costs accrued on a project within a given time period.
The Actual Cost data for the project's life cycle is pulled from the P6 EPPM schedule.
Actual Cost data is only available when the application is connected with P6 EPPM and is not editable. This value is based on the workspace currency. -
actualExpenseCostWorkspace3: number
(double)
Total expense costs accrued on a project within a given time period.
The Actual Cost data for the project's life cycle is pulled from the P6 EPPM schedule.
Actual Cost data is only available when the application is connected with P6 EPPM and is not editable. This value is based on the workspace currency. -
allocatedFundApprovedBudgetVariance: number
(double)
The total and time phased variance between the project's Allocated Fund and Approved Budget. This value is based on the base currency with specified exchange rate.
-
allocatedFundApprovedBudgetVarianceProject: number
(double)
The total and time phased variance between the project's Allocated Fund and Approved Budget. This value is based on the project currency.
-
allocatedFundApprovedBudgetVarianceWorkspace1: number
(double)
The total and time phased variance between the project's Allocated Fund and Approved Budget. This value is based on the workspace1 currency.
-
allocatedFundApprovedBudgetVarianceWorkspace2: number
(double)
The total and time phased variance between the project's Allocated Fund and Approved Budget. This value is based on the workspace2 currency.
-
allocatedFundApprovedBudgetVarianceWorkspace3: number
(double)
The total and time phased variance between the project's Allocated Fund and Approved Budget. This value is based on the workspace3 currency.
-
allocatedFundForecastVariance: number
(double)
The total and time phased variance between the project's Allocated Fund and Forecast. This value is based on the base currency with specified exchange rate.
-
allocatedFundForecastVarianceProject: number
(double)
The total and time phased variance between the project's Allocated Fund and Forecast. This value is based on the project currency.
-
allocatedFundForecastVarianceWorkspace1: number
(double)
The total and time phased variance between the project's Allocated Fund and Forecast. This value is based on the workspace1 currency.
-
allocatedFundForecastVarianceWorkspace2: number
(double)
The total and time phased variance between the project's Allocated Fund and Forecast. This value is based on the workspace2 currency.
-
allocatedFundForecastVarianceWorkspace3: number
(double)
The total and time phased variance between the project's Allocated Fund and Forecast. This value is based on the workspace3 currency.
-
allocatedFundPlannedBudgetVariance: number
(double)
The total and time phased variance between the project's Allocated Fund and Planned Budget. This value is based on the base currency with specified exchange rate.
-
allocatedFundPlannedBudgetVarianceProject: number
(double)
The total and time phased variance between the project's Allocated Fund and Planned Budget. This value is based on the project currency.
-
allocatedFundPlannedBudgetVarianceWorkspace1: number
(double)
The total and time phased variance between the project's Allocated Fund and Planned Budget. This value is based on the workspace1 currency.
-
allocatedFundPlannedBudgetVarianceWorkspace2: number
(double)
The total and time phased variance between the project's Allocated Fund and Planned Budget. This value is based on the workspace2 currency.
-
allocatedFundPlannedBudgetVarianceWorkspace3: number
(double)
The total and time phased variance between the project's Allocated Fund and Planned Budget. This value is based on the workspace3 currency.
-
annualDiscountRate: number
(double)
Minimum Value:
0
Maximum Value:1
The interest rate associated with the cost of an investment from your commercial bank or another funding source.
For example, an annual growth rate of an investment such as 4.75% can be used as an annual discount rate. This rate is used when a future value is assumed and you are trying to find the required Net Present Value.
This value can be entered manually or can be imported. -
atCompletionCost: number
(double)
The At Completion Total Cost from a cost-loaded P6 EPPM schedule.
The At Completion field is populated with the At Completion Total Cost from the project's P6 EPPM schedule when the project is summarized.
The value for At Completion Cost cannot be entered/edited manually through UI. -
atCompletionCostProject: number
(double)
The At Completion Total Cost from a cost-loaded P6 EPPM schedule.
At Completion data is only available when the application is connected to P6 EPPM and is not editable.
The At Completion field is populated with the At Completion Total Cost from the project's P6 EPPM schedule. This value is based on the project currency. -
atCompletionCostWorkspace1: number
(double)
The At Completion Total Cost from a cost-loaded P6 EPPM schedule.
At Completion data is only available when the application is connected to P6 EPPM and is not editable.
The At Completion field is populated with the At Completion Total Cost from the project's P6 EPPM schedule. This value is based on the workspace currency. -
atCompletionCostWorkspace2: number
(double)
The At Completion Total Cost from a cost-loaded P6 EPPM schedule.
At Completion data is only available when the application is connected to P6 EPPM and is not editable.
The At Completion field is populated with the At Completion Total Cost from the project's P6 EPPM schedule. This value is based on the workspace currency. -
atCompletionCostWorkspace3: number
(double)
The At Completion Total Cost from a cost-loaded P6 EPPM schedule.
At Completion data is only available when the application is connected to P6 EPPM and is not editable.
The At Completion field is populated with the At Completion Total Cost from the project's P6 EPPM schedule. This value is based on the workspace currency. -
benefits: number
(double)
Project benefits is the income or positive cash flow from which all charges, costs, and expenses are subtracted to arrive at the net income. Also called sales, turnover, or revenue. This value is based on the base currency with specified exchange rate.
-
benefitsDistributed: number
(double)
The amount of benefits currently allocated across the project timescale. This value is based on the base currency with specified exchange rate.
-
benefitsDistributedProject: number
(double)
The amount of benefits currently allocated across the project timescale. This value is based on the project currency.
-
benefitsDistributedWorkspace1: number
(double)
The amount of benefits currently allocated across the project timescale. This value is based on the project currency.
-
benefitsDistributedWorkspace2: number
(double)
The amount of benefits currently allocated across the project timescale. This value is based on the project currency.
-
benefitsDistributedWorkspace3: number
(double)
The amount of benefits currently allocated across the project timescale. This value is based on the project currency.
-
benefitsPresentValue: number
(double)
The present value, also known as the discounted value, of the overall project benefits. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use the present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the base currency with specified exchange rate.
-
benefitsPresentValueProject: number
(double)
The present value, also known as the discounted value, of the overall project benefits. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use the present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the project currency.
-
benefitsPresentValueWorkspace1: number
(double)
The present value, also known as the discounted value, of the overall project benefits. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use the present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the workspace currency.
-
benefitsPresentValueWorkspace2: number
(double)
The present value, also known as the discounted value, of the overall project benefits. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use the present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the workspace currency.
-
benefitsPresentValueWorkspace3: number
(double)
The present value, also known as the discounted value, of the overall project benefits. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use the present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the workspace currency.
-
benefitsProject: number
(double)
Project benefits is the income or positive cash flow from which all charges, costs, and expenses are subtracted to arrive at the net income. Also called sales, turnover, or revenue. This value is based on the project currency.
-
benefitsUndistributed: number
(double)
The amount of benefits that have not been allocated across the project timescale. This value is based on the base currency with specified exchange rate.
-
benefitsUndistributedProject: number
(double)
The amount of benefits that have not been allocated across the project timescale. This value is based on the project currency.
-
benefitsUndistributedWorkspace1: number
(double)
The amount of benefits that have not been allocated across the project timescale. This value is based on the project currency.
-
benefitsUndistributedWorkspace2: number
(double)
The amount of benefits that have not been allocated across the project timescale. This value is based on the project currency.
-
benefitsUndistributedWorkspace3: number
(double)
The amount of benefits that have not been allocated across the project timescale. This value is based on the project currency.
-
benefitsWorkspace1: number
(double)
Project benefits is the income or positive cash flow from which all charges, costs, and expenses are subtracted to arrive at the net income. Also called sales, turnover, or revenue. This value is based on the workspace currency.
-
benefitsWorkspace2: number
(double)
Project benefits is the income or positive cash flow from which all charges, costs, and expenses are subtracted to arrive at the net income. Also called sales, turnover, or revenue. This value is based on the workspace currency.
-
benefitsWorkspace3: number
(double)
Project benefits is the income or positive cash flow from which all charges, costs, and expenses are subtracted to arrive at the net income. Also called sales, turnover, or revenue. This value is based on the workspace currency.
-
budgetCurrentCost: number
(double)
The total cost of the project budget, including all transfers and changes. This field is in base currency and is calculated from budgetCurrentCostProject field based on the specified exchange rate.
-
budgetCurrentCostProject: number
(double)
The total cost of the project budget, including all transfers and changes. This value is based on the project currency.
-
budgetCurrentCostWorkspace1: number
(double)
The total project budget cost of a workspace.
-
budgetCurrentCostWorkspace2: number
(double)
The total project budget cost of a workspace.
-
budgetCurrentCostWorkspace3: number
(double)
The total project budget cost of a workspace.
-
budgetOriginalCost: number
(double)
The total original cost of the project budget, before transfers and changes. This field is in base currency and is calculated from budgetOriginalCostProject field based on the specified exchange rate.
-
budgetOriginalCostProject: number
(double)
The total original cost of the project budget, before transfers and changes. This value is based on the project currency.
-
budgetOriginalCostWorkspace1: number
(double)
The total original project budget cost of a workspace.
-
budgetOriginalCostWorkspace2: number
(double)
The total original project budget cost of a workspace.
-
budgetOriginalCostWorkspace3: number
(double)
The total original project budget cost of a workspace.
-
constructionValue: number
(double)
Minimum Value:
0
Construction Value is the total of all project-related costs incurred by the constructing company (usually a General Contractor) over the period of construction. This would generally include cost of materials, subcontract totals, overhead costs, general conditions and tax. This field is in base currency and is calculated from constructionValueProject field based on the specified exchange rate. -
constructionValueProject: number
(double)
Minimum Value:
0
Construction Value is the total of all project-related costs incurred by the constructing company (usually a General Contractor) over the period of construction. This would generally include cost of materials, subcontract totals, overhead costs, general conditions and tax. This value is based on the project currency. -
constructionValueWorkspace1: number
(double)
Minimum Value:
0
Construction Value is the total of all project-related costs incurred by the constructing company (usually a General Contractor) over the period of construction based on workspace currency 1. This would generally include cost of materials, subcontract totals, overhead costs, general conditions and tax. -
constructionValueWorkspace2: number
(double)
Minimum Value:
0
Construction Value is the total of all project-related costs incurred by the constructing company (usually a General Contractor) over the period of construction based on workspace currency 2. This would generally include cost of materials, subcontract totals, overhead costs, general conditions and tax. -
constructionValueWorkspace3: number
(double)
Minimum Value:
0
Construction Value is the total of all project-related costs incurred by the constructing company (usually a General Contractor) over the period of construction based on workspace currency 3. This would generally include cost of materials, subcontract totals, overhead costs, general conditions and tax. -
costPerfIndex: number
(double)
The measure of a project's cost efficiency.
A value of less than 1 indicates the project is over budget, while a value greater than 1 indicates the project is under budget.
This value can be entered manually or can be imported. -
costVariance: number
(double)
The measure of cost performance on a project.
A negative value indicates that the Actual Cost has exceeded the planned value.
This value can be entered manually or can be imported. This value is based on the base currency with specified exchange rate. -
costVarianceProject: number
(double)
The measure of cost performance on a project.
A negative value indicates that the Actual Cost has exceeded the planned value.
This value can be entered manually or can be imported. This value is based on the project currency. -
costVarianceWorkspace1: number
(double)
The measure of cost performance on a project.
A negative value indicates that the Actual Cost has exceeded the planned value.
This value can be entered manually or can be imported. This value is based on the workspace currency. -
costVarianceWorkspace2: number
(double)
The measure of cost performance on a project.
A negative value indicates that the Actual Cost has exceeded the planned value.
This value can be entered manually or can be imported. This value is based on the workspace currency. -
costVarianceWorkspace3: number
(double)
The measure of cost performance on a project.
A negative value indicates that the Actual Cost has exceeded the planned value.
This value can be entered manually or can be imported. This value is based on the workspace currency. -
currentApprovedBudget: number
(double)
The budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process. This value is based on the base currency with specified exchange rate. -
currentApprovedBudgetBaseDistributed: number
(double)
The amount of approved budget currently allocated across the project timescale. This value is based on the base currency with specified exchange rate.
-
currentApprovedBudgetBaseDistributedProject: number
(double)
The amount of approved budget currently allocated across the project timescale. This value is based on the project currency.
-
currentApprovedBudgetBaseDistributedWorkspace1: number
(double)
The amount of approved budget currently allocated across the project timescale.
This value is based on the workspace1 currency. -
currentApprovedBudgetBaseDistributedWorkspace2: number
(double)
The amount of approved budget currently allocated across the project timescale.
This value is based on the workspace2 currency. -
currentApprovedBudgetBaseDistributedWorkspace3: number
(double)
The amount of approved budget currently allocated across the project timescale.
This value is based on the workspace3 currency. -
currentApprovedBudgetBasePresentValue: number
(double)
The present value, also known as discounted value, of the portfolio approved budget. Future cash flows are discounted using the project's annual discount rate. This value is based on the base currency with specified exchange rate.
-
currentApprovedBudgetBasePresentValueProject: number
(double)
The present value, also known as discounted value, of the portfolio approved budget. Future cash flows are discounted using the project's annual discount rate. This value is based on the project currency.
-
currentApprovedBudgetBasePresentValueWorkspace1: number
(double)
The present value, also known as discounted value, of the portfolio approved budget. Future cash flows are discounted using the project's annual discount rate. This value is based on the workspace1 currency.
-
currentApprovedBudgetBasePresentValueWorkspace2: number
(double)
The present value, also known as discounted value, of the portfolio approved budget. Future cash flows are discounted using the project's annual discount rate. This value is based on the workspace2 currency.
-
currentApprovedBudgetBasePresentValueWorkspace3: number
(double)
The present value, also known as discounted value, of the portfolio approved budget. Future cash flows are discounted using the project's annual discount rate. This value is based on the workspace3 currency.
-
currentApprovedBudgetBaseUndistributed: number
(double)
The amount of approved budget unallocated across the project timescale. This value is based on the base currency with specified exchange rate.
-
currentApprovedBudgetBaseUndistributedProject: number
(double)
The amount of approved budget unallocated across the project timescale. This value is based on the project currency.
-
currentApprovedBudgetBaseUndistributedWorkspace1: number
(double)
The amount of approved budget unallocated across the project timescale.
This value is based on the workspace1 currency. -
currentApprovedBudgetBaseUndistributedWorkspace2: number
(double)
The amount of approved budget unallocated across the project timescale.
This value is based on the workspace2 currency. -
currentApprovedBudgetBaseUndistributedWorkspace3: number
(double)
The amount of approved budget unallocated across the project timescale.
This value is based on the workspace3 currency. -
currentApprovedBudgetCapitalCost: number
(double)
The capital budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process. This value is based on the base currency with specified exchange rate. -
currentApprovedBudgetCapitalCostDistributed: number
(double)
The capital amount of approved budget currently allocated across the project timescale. This value is based on the base currency with specified exchange rate.
-
currentApprovedBudgetCapitalCostDistributedProject: number
(double)
The capital amount of approved budget currently allocated across the project timescale. This value is based on the project currency.
-
currentApprovedBudgetCapitalCostDistributedWorkspace1: number
(double)
The capital amount of approved budget currently allocated across the project timescale. This value is based on the workspace currency.
-
currentApprovedBudgetCapitalCostDistributedWorkspace2: number
(double)
The capital amount of approved budget currently allocated across the project timescale. This value is based on the workspace currency.
-
currentApprovedBudgetCapitalCostDistributedWorkspace3: number
(double)
The capital amount of approved budget currently allocated across the project timescale. This value is based on the workspace currency.
-
currentApprovedBudgetCapitalCostPresentValue: number
(double)
The capital present value, also known as discounted value, of the portfolio approved budget. Future cash flows are discounted using the project's annual discount rate. This value is based on the base currency with specified exchange rate.
-
currentApprovedBudgetCapitalCostPresentValueProject: number
(double)
The capital present value, also known as discounted value, of the portfolio approved budget. Future cash flows are discounted using the project's annual discount rate. This value is based on the project currency.
-
currentApprovedBudgetCapitalCostPresentValueWorkspace1: number
(double)
The capital present value, also known as discounted value, of the portfolio approved budget. Future cash flows are discounted using the project's annual discount rate. This value is based on the workspace currency.
-
currentApprovedBudgetCapitalCostPresentValueWorkspace2: number
(double)
The capital present value, also known as discounted value, of the portfolio approved budget. Future cash flows are discounted using the project's annual discount rate. This value is based on the workspace currency.
-
currentApprovedBudgetCapitalCostPresentValueWorkspace3: number
(double)
The capital present value, also known as discounted value, of the portfolio approved budget. Future cash flows are discounted using the project's annual discount rate. This value is based on the workspace currency.
-
currentApprovedBudgetCapitalCostProject: number
(double)
The capital budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process. This value is based on the project currency. -
currentApprovedBudgetCapitalCostUnDistributed: number
(double)
The capital amount of approved budget unallocated across the project timescale. This value is based on the base currency with specified exchange rate.
-
currentApprovedBudgetCapitalCostUnDistributedProject: number
(double)
The capital amount of approved budget unallocated across the project timescale. This value is based on the project currency.
-
currentApprovedBudgetCapitalCostUnDistributedWorkspace1: number
(double)
The capital amount of approved budget unallocated across the project timescale. This value is based on the workspace currency.
-
currentApprovedBudgetCapitalCostUnDistributedWorkspace2: number
(double)
The capital amount of approved budget unallocated across the project timescale. This value is based on the workspace currency.
-
currentApprovedBudgetCapitalCostUnDistributedWorkspace3: number
(double)
The capital amount of approved budget unallocated across the project timescale. This value is based on the workspace currency.
-
currentApprovedBudgetCapitalCostWorkspace1: number
(double)
The capital budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process. This value is based on the workspace currency. -
currentApprovedBudgetCapitalCostWorkspace2: number
(double)
The capital budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process. This value is based on the workspace currency. -
currentApprovedBudgetCapitalCostWorkspace3: number
(double)
The capital budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process. This value is based on the workspace currency. -
currentApprovedBudgetExpenseCost: number
(double)
The expense budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process. This value is based on the base currency with specified exchange rate. -
currentApprovedBudgetExpenseCostDistributed: number
(double)
The expense amount of approved budget currently allocated across the project timescale. This value is based on the base currency with specified exchange rate.
-
currentApprovedBudgetExpenseCostDistributedProject: number
(double)
The expense amount of approved budget currently allocated across the project timescale. This value is based on the project currency.
-
currentApprovedBudgetExpenseCostDistributedWorkspace1: number
(double)
The expense amount of approved budget currently allocated across the project timescale. This value is based on the workspace currency.
-
currentApprovedBudgetExpenseCostDistributedWorkspace2: number
(double)
The expense amount of approved budget currently allocated across the project timescale. This value is based on the workspace currency.
-
currentApprovedBudgetExpenseCostDistributedWorkspace3: number
(double)
The expense amount of approved budget currently allocated across the project timescale. This value is based on the workspace currency.
-
currentApprovedBudgetExpenseCostPresentValue: number
(double)
The capital present value, also known as discounted value, of the portfolio approved budget. Future cash flows are discounted using the project's annual discount rate. This value is based on the base currency with specified exchange rate.
-
currentApprovedBudgetExpenseCostPresentValueProject: number
(double)
The expense present value, also known as discounted value, of the portfolio approved budget. Future cash flows are discounted using the project's annual discount rate. This value is based on the project currency.
-
currentApprovedBudgetExpenseCostPresentValueWorkspace1: number
(double)
The expense present value, also known as discounted value, of the portfolio approved budget. Future cash flows are discounted using the project's annual discount rate. This value is based on the workspace currency.
-
currentApprovedBudgetExpenseCostPresentValueWorkspace2: number
(double)
The expense present value, also known as discounted value, of the portfolio approved budget. Future cash flows are discounted using the project's annual discount rate. This value is based on the workspace currency.
-
currentApprovedBudgetExpenseCostPresentValueWorkspace3: number
(double)
The expense present value, also known as discounted value, of the portfolio approved budget. Future cash flows are discounted using the project's annual discount rate. This value is based on the workspace currency.
-
currentApprovedBudgetExpenseCostProject: number
(double)
The expense budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process. This value is based on the project currency. -
currentApprovedBudgetExpenseCostUnDistributed: number
(double)
The expense amount of approved budget unallocated across the project timescale. This value is based on the base currency with specified exchange rate.
-
currentApprovedBudgetExpenseCostUnDistributedProject: number
(double)
The expense amount of approved budget unallocated across the project timescale. This value is based on the project currency.
-
currentApprovedBudgetExpenseCostUnDistributedWorkspace1: number
(double)
The expense amount of approved budget unallocated across the project timescale. This value is based on the workspace currency.
-
currentApprovedBudgetExpenseCostUnDistributedWorkspace2: number
(double)
The expense amount of approved budget unallocated across the project timescale. This value is based on the workspace currency.
-
currentApprovedBudgetExpenseCostUnDistributedWorkspace3: number
(double)
The expense amount of approved budget unallocated across the project timescale. This value is based on the workspace currency.
-
currentApprovedBudgetExpenseCostWorkspace1: number
(double)
The expense budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process. This value is based on the workspace currency. -
currentApprovedBudgetExpenseCostWorkspace2: number
(double)
The expense budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process. This value is based on the workspace currency. -
currentApprovedBudgetExpenseCostWorkspace3: number
(double)
The expense budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process. This value is based on the workspace currency. -
currentApprovedBudgetProject: number
(double)
The budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process. This value is based on the project currency. -
currentApprovedBudgetWorkspace1: number
(double)
The budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process.
This value is based on the workspace1 currency. -
currentApprovedBudgetWorkspace2: number
(double)
The budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process.
This value is based on the workspace2 currency. -
currentApprovedBudgetWorkspace3: number
(double)
The budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process.
This value is based on the workspace3 currency. -
currentApprovedSpendVariance: number
(double)
The total and time phased variance between the project's Approved Budget and Actuals. This value is based on the base currency with specified exchange rate.
-
currentApprovedSpendVarianceProject: number
(double)
The total and time phased variance between the project's Approved Budget and Actuals. This value is based on the project currency.
-
currentApprovedSpendVarianceWorkspace1: number
(double)
The total and time phased variance between the project's Approved Budget and Actuals. This value is based on the base currency with specified exchange rate. This value is based on the workspace1 currency.
-
currentApprovedSpendVarianceWorkspace2: number
(double)
The total and time phased variance between the project's Approved Budget and Actuals. This value is based on the base currency with specified exchange rate. This value is based on the workspace2 currency.
-
currentApprovedSpendVarianceWorkspace3: number
(double)
The total and time phased variance between the project's Approved Budget and Actuals. This value is based on the base currency with specified exchange rate. This value is based on the workspace3 currency.
-
earnedValueCost: number
(double)
The value of work performed on a project in reference to the approved budget for the project.
The cost value used for the Earned Value Management of a project.
Earned Value Management allows project managers to quantify project progress and objectively measure a project's success.
This value can be entered manually or can be imported. This value is based on the base currency with specified exchange rate. -
earnedValueCostProject: number
(double)
The value of work performed on a project in reference to the approved budget for the project.
The cost value used for the Earned Value Management of a project.
Earned Value Management allows project managers to quantify project progress and objectively measure a project's success.
This value can be entered manually or can be imported. This value is based on the project currency. -
earnedValueCostWorkspace1: number
(double)
The value of work performed on a project in reference to the approved budget for the project.
The cost value used for the Earned Value Management of a project.
Earned Value Management allows project managers to quantify project progress and objectively measure a project's success.
This value can be entered manually or can be imported. This value is based on the workspace currency. -
earnedValueCostWorkspace2: number
(double)
The value of work performed on a project in reference to the approved budget for the project.
The cost value used for the Earned Value Management of a project.
Earned Value Management allows project managers to quantify project progress and objectively measure a project's success.
This value can be entered manually or can be imported. This value is based on the workspace currency. -
earnedValueCostWorkspace3: number
(double)
The value of work performed on a project in reference to the approved budget for the project.
The cost value used for the Earned Value Management of a project.
Earned Value Management allows project managers to quantify project progress and objectively measure a project's success.
This value can be entered manually or can be imported. This value is based on the workspace currency. -
estAtCompleteCost: number
(double)
The expected total cost of the project when the defined scope of work will be completed.
This value can be entered manually or can be imported. This value is based on the base currency with specified exchange rate. -
estAtCompleteCostProject: number
(double)
The expected total cost of the project when the defined scope of work will be completed.
This value can be entered manually or can be imported. This value is based on the project currency. -
estAtCompleteCostWorkspace1: number
(double)
The expected total cost of the project when the defined scope of work will be completed.
This value can be entered manually or can be imported. This value is based on the workspace currency. -
estAtCompleteCostWorkspace2: number
(double)
The expected total cost of the project when the defined scope of work will be completed.
This value can be entered manually or can be imported. This value is based on the workspace currency. -
estAtCompleteCostWorkspace3: number
(double)
The expected total cost of the project when the defined scope of work will be completed.
This value can be entered manually or can be imported. This value is based on the workspace currency. -
estToCompleteCost: number
(double)
The estimated cost needed to complete the project.
This value can be entered manually or can be imported. This value is based on the base currency with specified exchange rate. -
estToCompleteCostProject: number
(double)
The estimated cost needed to complete the project.
This value can be entered manually or can be imported. This value is based on the project currency. -
estToCompleteCostWorkspace1: number
(double)
The estimated cost needed to complete the project.
This value can be entered manually or can be imported. This value is based on the workspace currency. -
estToCompleteCostWorkspace2: number
(double)
The estimated cost needed to complete the project.
This value can be entered manually or can be imported. This value is based on the workspace currency. -
estToCompleteCostWorkspace3: number
(double)
The estimated cost needed to complete the project.
This value can be entered manually or can be imported. This value is based on the workspace currency. -
forecastCapitalCost: number
(double)
The total capital estimation of a project's remaining costs.
Once projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle. This value is based on the base currency with specified exchange rate. -
forecastCapitalCostDistributed: number
(double)
The capital amount of forecast cost currently allocated across the project timescale. This value is based on the base currency with specified exchange rate.
-
forecastCapitalCostDistributedProject: number
(double)
The capital amount of forecast cost currently allocated across the project timescale. This value is based on the project currency.
-
forecastCapitalCostDistributedWorkspace1: number
(double)
The capital amount of forecast cost currently allocated across the project timescale. This value is based on the workspace currency.
-
forecastCapitalCostDistributedWorkspace2: number
(double)
The capital amount of forecast cost currently allocated across the project timescale. This value is based on the workspace currency.
-
forecastCapitalCostDistributedWorkspace3: number
(double)
The capital amount of forecast cost currently allocated across the project timescale. This value is based on the workspace currency.
-
forecastCapitalCostPresentValue: number
(double)
The capital present value, also known as the discounted value, of the overall project forecast. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use the present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the base currency with specified exchange rate.
-
forecastCapitalCostPresentValueProject: number
(double)
The capital present value, also known as the discounted value, of the overall project forecast. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use the present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the project currency.
-
forecastCapitalCostPresentValueWorkspace1: number
(double)
The capital present value, also known as the discounted value, of the overall project forecast. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use the present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the workspace currency.
-
forecastCapitalCostPresentValueWorkspace2: number
(double)
The capital present value, also known as the discounted value, of the overall project forecast. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use the present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the workspace currency.
-
forecastCapitalCostPresentValueWorkspace3: number
(double)
The capital present value, also known as the discounted value, of the overall project forecast. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use the present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the workspace currency.
-
forecastCapitalCostProject: number
(double)
The total capital estimation of a project's remaining costs.
Once projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle. This value is based on the project currency. -
forecastCapitalCostUnDistributed: number
(double)
The capital amount of forecast cost unallocated across the project timescale. This value is based on the base currency with specified exchange rate.
-
forecastCapitalCostUnDistributedProject: number
(double)
The capital amount of forecast cost unallocated across the project timescale. This value is based on the project currency.
-
forecastCapitalCostUnDistributedWorkspace1: number
(double)
The capital amount of forecast cost unallocated across the project timescale. This value is based on the workspace currency.
-
forecastCapitalCostUnDistributedWorkspace2: number
(double)
The capital amount of forecast cost unallocated across the project timescale. This value is based on the workspace currency.
-
forecastCapitalCostUnDistributedWorkspace3: number
(double)
The capital amount of forecast cost unallocated across the project timescale. This value is based on the workspace currency.
-
forecastCapitalCostWorkspace1: number
(double)
The total capital estimation of a project's remaining costs.
Once projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle. This value is based on the workspace currency. -
forecastCapitalCostWorkspace2: number
(double)
The total capital estimation of a project's remaining costs.
Once projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle. This value is based on the workspace currency. -
forecastCapitalCostWorkspace3: number
(double)
The total capital estimation of a project's remaining costs.
Once projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle. This value is based on the workspace currency. -
forecastCost: number
(double)
The total estimation of a project's remaining costs.
Once projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle. This value is based on the base currency with specified exchange rate. -
forecastCostDistributed: number
(double)
The amount of forecast cost currently allocated across the project timescale. This value is based on the base currency with specified exchange rate.
-
forecastCostDistributedProject: number
(double)
The amount of forecast cost currently allocated across the project timescale. This value is based on the project currency.
-
forecastCostDistributedWorkspace1: number
(double)
The amount of forecast cost currently allocated across the project timescale. This value is based on the workspace currency.
-
forecastCostDistributedWorkspace2: number
(double)
The amount of forecast cost currently allocated across the project timescale. This value is based on the workspace currency.
-
forecastCostDistributedWorkspace3: number
(double)
The amount of forecast cost currently allocated across the project timescale. This value is based on the workspace currency.
-
forecastCostPresentValue: number
(double)
The present value, also known as the discounted value, of the overall project forecast. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use the present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the base currency with specified exchange rate.
-
forecastCostPresentValueProject: number
(double)
The present value, also known as the discounted value, of the overall project forecast. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use the present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the project currency.
-
forecastCostPresentValueWorkspace1: number
(double)
The present value, also known as the discounted value, of the overall project forecast. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use the present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the workspace currency.
-
forecastCostPresentValueWorkspace2: number
(double)
The present value, also known as the discounted value, of the overall project forecast. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use the present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the workspace currency.
-
forecastCostPresentValueWorkspace3: number
(double)
The present value, also known as the discounted value, of the overall project forecast. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use the present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the workspace currency.
-
forecastCostProject: number
(double)
The total estimation of a project's remaining costs.
Once projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle. This value is based on the project currency. -
forecastCostUndistributed: number
(double)
The amount of forecast cost unallocated across the project timescale. This value is based on the base currency with specified exchange rate.
-
forecastCostUndistributedProject: number
(double)
The amount of forecast cost unallocated across the project timescale. This value is based on the project currency.
-
forecastCostUndistributedWorkspace1: number
(double)
The amount of forecast cost unallocated across the project timescale. This value is based on the workspace currency.
-
forecastCostUndistributedWorkspace2: number
(double)
The amount of forecast cost unallocated across the project timescale. This value is based on the workspace currency.
-
forecastCostUndistributedWorkspace3: number
(double)
The amount of forecast cost unallocated across the project timescale. This value is based on the workspace currency.
-
forecastCostWorkspace1: number
(double)
The total estimation of a project's remaining costs.
Once projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle. This value is based on the workspace currency. -
forecastCostWorkspace2: number
(double)
The total estimation of a project's remaining costs.
Once projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle. This value is based on the workspace currency. -
forecastCostWorkspace3: number
(double)
The total estimation of a project's remaining costs.
Once projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle. This value is based on the workspace currency. -
forecastCurrApprVar: number
(double)
The total and time phased variance between the project's Forecast and Approved Budget. This value is based on the base currency with specified exchange rate.
-
forecastCurrApprVarProject: number
(double)
The total and time phased variance between the project's Forecast and Approved Budget. This value is based on the project currency.
-
forecastCurrApprVarWorkspace1: number
(double)
The total and time phased variance between the project's Forecast and Approved Budget. This value is based on the base currency with specified exchange rate.
This value is based on the workspace1 currency. -
forecastCurrApprVarWorkspace2: number
(double)
The total and time phased variance between the project's Forecast and Approved Budget. This value is based on the base currency with specified exchange rate.
This value is based on the workspace2 currency. -
forecastCurrApprVarWorkspace3: number
(double)
The total and time phased variance between the project's Forecast and Approved Budget. This value is based on the base currency with specified exchange rate.
This value is based on the workspace3 currency. -
forecastExpenseCost: number
(double)
The total expense estimation of a project's remaining costs.
Once projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle. This value is based on the base currency with specified exchange rate. -
forecastExpenseCostDistributed: number
(double)
The expense amount of forecast cost currently allocated across the project timescale. This value is based on the base currency with specified exchange rate.
-
forecastExpenseCostDistributedProject: number
(double)
The expense amount of forecast cost currently allocated across the project timescale. This value is based on the project currency.
-
forecastExpenseCostDistributedWorkspace1: number
(double)
The expense amount of forecast cost currently allocated across the project timescale. This value is based on the workspace currency.
-
forecastExpenseCostDistributedWorkspace2: number
(double)
The expense amount of forecast cost currently allocated across the project timescale. This value is based on the workspace currency.
-
forecastExpenseCostDistributedWorkspace3: number
(double)
The expense amount of forecast cost currently allocated across the project timescale. This value is based on the workspace currency.
-
forecastExpenseCostPresentValue: number
(double)
The expense present value, also known as the discounted value, of the overall project forecast. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use the present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the base currency with specified exchange rate.
-
forecastExpenseCostPresentValueProject: number
(double)
The expense present value, also known as the discounted value, of the overall project forecast. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use the present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the project currency.
-
forecastExpenseCostPresentValueWorkspace1: number
(double)
The expense present value, also known as the discounted value, of the overall project forecast. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use the present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the workspace currency.
-
forecastExpenseCostPresentValueWorkspace2: number
(double)
The expense present value, also known as the discounted value, of the overall project forecast. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use the present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the workspace currency.
-
forecastExpenseCostPresentValueWorkspace3: number
(double)
The expense present value, also known as the discounted value, of the overall project forecast. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use the present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the workspace currency.
-
forecastExpenseCostProject: number
(double)
The total expense estimation of a project's remaining costs.
Once projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle. This value is based on the project currency. -
forecastExpenseCostUnDistributed: number
(double)
The expense amount of forecast cost unallocated across the project timescale. This value is based on the base currency with specified exchange rate.
-
forecastExpenseCostUnDistributedProject: number
(double)
The expense amount of forecast cost unallocated across the project timescale. This value is based on the project currency.
-
forecastExpenseCostUnDistributedWorkspace1: number
(double)
The expense amount of forecast cost unallocated across the project timescale. This value is based on the workspace currency.
-
forecastExpenseCostUnDistributedWorkspace2: number
(double)
The expense amount of forecast cost unallocated across the project timescale. This value is based on the workspace currency.
-
forecastExpenseCostUnDistributedWorkspace3: number
(double)
The expense amount of forecast cost unallocated across the project timescale. This value is based on the workspace currency.
-
forecastExpenseCostWorkspace1: number
(double)
The total expense estimation of a project's remaining costs.
Once projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle. This value is based on the workspace currency. -
forecastExpenseCostWorkspace2: number
(double)
The total expense estimation of a project's remaining costs.
Once projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle. This value is based on the workspace currency. -
forecastExpenseCostWorkspace3: number
(double)
The total expense estimation of a project's remaining costs.
Once projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle. This value is based on the workspace currency. -
intRateReturn: number
(double)
The quantitative measurement used to compare the profitability of project investments.
The rate at which investors will receive returns on their investments in a project.
This value can be entered manually or can be imported. -
link: string
(url)
The self-link to the object. This field is populated only in the responses generated by the batch create APIs.
-
netPresentValue: number
(double)
The difference between the present value (PV) of the future cash flows from current investments and project costs.
The Net Present Value accounts for changes in inflation and returns when calculating the difference in value of incoming and outgoing capital.
Positive Net Present Value (NPV) is an indicator of projects that should be pursued.
This value can be entered manually or can be imported. This value is based on the base currency with specified exchange rate. -
netPresentValueProject: number
(double)
The difference between the present value (PV) of the future cash flows from current investments and project costs.
The Net Present Value accounts for changes in inflation and returns when calculating the difference in value of incoming and outgoing capital.
Positive Net Present Value (NPV) is an indicator of projects that should be pursued.
This value can be entered manually or can be imported. This value is based on the project currency. -
netPresentValueWorkspace1: number
(double)
The difference between the present value (PV) of the future cash flows from current investments and project costs.
The Net Present Value accounts for changes in inflation and returns when calculating the difference in value of incoming and outgoing capital.
Positive Net Present Value (NPV) is an indicator of projects that should be pursued.
This value can be entered manually or can be imported. This value is based on the workspace currency. -
netPresentValueWorkspace2: number
(double)
The difference between the present value (PV) of the future cash flows from current investments and project costs.
The Net Present Value accounts for changes in inflation and returns when calculating the difference in value of incoming and outgoing capital.
Positive Net Present Value (NPV) is an indicator of projects that should be pursued.
This value can be entered manually or can be imported. This value is based on the workspace currency. -
netPresentValueWorkspace3: number
(double)
The difference between the present value (PV) of the future cash flows from current investments and project costs.
The Net Present Value accounts for changes in inflation and returns when calculating the difference in value of incoming and outgoing capital.
Positive Net Present Value (NPV) is an indicator of projects that should be pursued.
This value can be entered manually or can be imported. This value is based on the workspace currency. -
paybackPeriod: number
(double)
The estimate of the length of time that will transpire before net profits recover the initial and periodic costs of an investment to carry out the selected project.
This value can be entered manually or can be imported. -
plannedBudget: number
(double)
The planned total cost of a project as defined by the project manager.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the base currency with specified exchange rate. -
plannedBudgetCapital: number
(double)
The planned total capital cost of a project as defined by the project manager.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the base currency with specified exchange rate. -
plannedBudgetCapitalDistributed: number
(double)
The capital amount of planned budget allocated across the project timescale. This value is based on the base currency with specified exchange rate.
-
plannedBudgetCapitalDistributedProject: number
(double)
The capital amount of planned budget allocated across the project timescale. This value is based on the project currency.
-
plannedBudgetCapitalDistributedWorkspace1: number
(double)
The capital amount of planned budget allocated across the project timescale. This value is based on the workspace currency.
-
plannedBudgetCapitalDistributedWorkspace2: number
(double)
The capital amount of planned budget allocated across the project timescale. This value is based on the workspace currency.
-
plannedBudgetCapitalDistributedWorkspace3: number
(double)
The capital amount of planned budget allocated across the project timescale. This value is based on the workspace currency.
-
plannedBudgetCapitalPresentValue: number
(double)
The capital present value, also known as the discounted value, of the overall project planned budget. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the base currency with specified exchange rate.
-
plannedBudgetCapitalPresentValueProject: number
(double)
The capital present value, also known as the discounted value, of the overall project planned budget. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the project currency.
-
plannedBudgetCapitalPresentValueWorkspace1: number
(double)
The capital present value, also known as the discounted value, of the overall project planned budget. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the workspace currency.
-
plannedBudgetCapitalPresentValueWorkspace2: number
(double)
The capital present value, also known as the discounted value, of the overall project planned budget. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the workspace currency.
-
plannedBudgetCapitalPresentValueWorkspace3: number
(double)
The capital present value, also known as the discounted value, of the overall project planned budget. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the workspace currency.
-
plannedBudgetCapitalProject: number
(double)
The planned total capital cost of a project as defined by the project manager.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the project currency. -
plannedBudgetCapitalUnDistributed: number
(double)
The capital amount of planned budget unallocated across the project timescale. This value is based on the base currency with specified exchange rate.
-
plannedBudgetCapitalUnDistributedProject: number
(double)
The capital amount of planned budget unallocated across the project timescale. This value is based on the project currency.
-
plannedBudgetCapitalUnDistributedWorkspace1: number
(double)
The capital amount of planned budget unallocated across the project timescale. This value is based on the workspace currency.
-
plannedBudgetCapitalUnDistributedWorkspace2: number
(double)
The capital amount of planned budget unallocated across the project timescale. This value is based on the workspace currency.
-
plannedBudgetCapitalUnDistributedWorkspace3: number
(double)
The capital amount of planned budget unallocated across the project timescale. This value is based on the workspace currency.
-
plannedBudgetCapitalWorkspace1: number
(double)
The planned total capital cost of a project as defined by the project manager.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the workspace currency. -
plannedBudgetCapitalWorkspace2: number
(double)
The planned total capital cost of a project as defined by the project manager.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the workspace currency. -
plannedBudgetCapitalWorkspace3: number
(double)
The planned total capital cost of a project as defined by the project manager.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the workspace currency. -
plannedBudgetDistributed: number
(double)
The amount of planned budget allocated across the project timescale. This value is based on the base currency with specified exchange rate.
-
plannedBudgetDistributedProject: number
(double)
The amount of planned budget allocated across the project timescale. This value is based on the project currency.
-
plannedBudgetDistributedWorkspace1: number
(double)
The amount of planned budget allocated across the project timescale. This value is based on the workspace currency.
-
plannedBudgetDistributedWorkspace2: number
(double)
The amount of planned budget allocated across the project timescale. This value is based on the workspace currency.
-
plannedBudgetDistributedWorkspace3: number
(double)
The amount of planned budget allocated across the project timescale. This value is based on the workspace currency.
-
plannedBudgetExpense: number
(double)
The planned total expense cost of a project as defined by the project manager.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the base currency with specified exchange rate. -
plannedBudgetExpenseDistributed: number
(double)
The expense amount of planned budget allocated across the project timescale. This value is based on the base currency with specified exchange rate.
-
plannedBudgetExpenseDistributedProject: number
(double)
The expense amount of planned budget allocated across the project timescale. This value is based on the project currency.
-
plannedBudgetExpenseDistributedWorkspace1: number
(double)
The expense amount of planned budget allocated across the project timescale. This value is based on the workspace currency.
-
plannedBudgetExpenseDistributedWorkspace2: number
(double)
The expense amount of planned budget allocated across the project timescale. This value is based on the workspace currency.
-
plannedBudgetExpenseDistributedWorkspace3: number
(double)
The expense amount of planned budget allocated across the project timescale. This value is based on the workspace currency.
-
plannedBudgetExpensePresentValue: number
(double)
The expense present value, also known as the discounted value, of the overall project planned budget. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the base currency with specified exchange rate.
-
plannedBudgetExpensePresentValueProject: number
(double)
The expense present value, also known as the discounted value, of the overall project planned budget. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the project currency.
-
plannedBudgetExpensePresentValueWorkspace1: number
(double)
The expense present value, also known as the discounted value, of the overall project planned budget. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the workspace currency.
-
plannedBudgetExpensePresentValueWorkspace2: number
(double)
The expense present value, also known as the discounted value, of the overall project planned budget. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the workspace currency.
-
plannedBudgetExpensePresentValueWorkspace3: number
(double)
The expense present value, also known as the discounted value, of the overall project planned budget. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the workspace currency.
-
plannedBudgetExpenseProject: number
(double)
The planned total expense cost of a project as defined by the project manager.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the project currency. -
plannedBudgetExpenseUnDistributed: number
(double)
The expense amount of planned budget unallocated across the project timescale. This value is based on the base currency with specified exchange rate.
-
plannedBudgetExpenseUnDistributedProject: number
(double)
The expense amount of planned budget unallocated across the project timescale. This value is based on the project currency.
-
plannedBudgetExpenseUnDistributedWorkspace1: number
(double)
The expense amount of planned budget unallocated across the project timescale. This value is based on the workspace currency.
-
plannedBudgetExpenseUnDistributedWorkspace2: number
(double)
The expense amount of planned budget unallocated across the project timescale. This value is based on the workspace currency.
-
plannedBudgetExpenseUnDistributedWorkspace3: number
(double)
The expense amount of planned budget unallocated across the project timescale. This value is based on the workspace currency.
-
plannedBudgetExpenseWorkspace1: number
(double)
The planned total expense cost of a project as defined by the project manager.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the workspace currency. -
plannedBudgetExpenseWorkspace2: number
(double)
The planned total expense cost of a project as defined by the project manager.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the workspace currency. -
plannedBudgetExpenseWorkspace3: number
(double)
The planned total expense cost of a project as defined by the project manager.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the workspace currency. -
plannedBudgetPresentValue: number
(double)
The present value, also known as the discounted value, of the overall project planned budget. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the base currency with specified exchange rate.
-
plannedBudgetPresentValueProject: number
(double)
The present value, also known as the discounted value, of the overall project planned budget. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the project currency.
-
plannedBudgetPresentValueWorkspace1: number
(double)
The present value, also known as the discounted value, of the overall project planned budget. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the workspace currency.
-
plannedBudgetPresentValueWorkspace2: number
(double)
The present value, also known as the discounted value, of the overall project planned budget. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the workspace currency.
-
plannedBudgetPresentValueWorkspace3: number
(double)
The present value, also known as the discounted value, of the overall project planned budget. Future cash flows are discounted using the project's annual discount rate. Portfolio managers can use present value of a project's expected cash flow as a metric during project prioritization and selection. This value is based on the workspace currency.
-
plannedBudgetProject: number
(double)
The planned total cost of a project as defined by the project manager.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the project currency. -
plannedBudgetUndistributed: number
(double)
The amount of planned budget unallocated across the project timescale. This value is based on the base currency with specified exchange rate.
-
plannedBudgetUndistributedProject: number
(double)
The amount of planned budget unallocated across the project timescale. This value is based on the project currency.
-
plannedBudgetUndistributedWorkspace1: number
(double)
The amount of planned budget unallocated across the project timescale. This value is based on the workspace currency.
-
plannedBudgetUndistributedWorkspace2: number
(double)
The amount of planned budget unallocated across the project timescale. This value is based on the workspace currency.
-
plannedBudgetUndistributedWorkspace3: number
(double)
The amount of planned budget unallocated across the project timescale. This value is based on the workspace currency.
-
plannedBudgetWorkspace1: number
(double)
The planned total cost of a project as defined by the project manager.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the workspace currency. -
plannedBudgetWorkspace2: number
(double)
The planned total cost of a project as defined by the project manager.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the workspace currency. -
plannedBudgetWorkspace3: number
(double)
The planned total cost of a project as defined by the project manager.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the workspace currency. -
plannedValueCost: number
(double)
The amount of approved capital spent on a scheduled portion of work on a project.
Planned Value Cost is often used for Earned Value Management.
This value can be entered manually or can be imported. This value is based on the base currency with specified exchange rate. -
plannedValueCostProject: number
(double)
The amount of approved capital spent on a scheduled portion of work on a project.
Planned Value Cost is often used for Earned Value Management.
This value can be entered manually or can be imported. This value is based on the project currency. -
plannedValueCostWorkspace1: number
(double)
The amount of approved capital spent on a scheduled portion of work on a project.
Planned Value Cost is often used for Earned Value Management.
This value can be entered manually or can be imported. This value is based on the workspace currency. -
plannedValueCostWorkspace2: number
(double)
The amount of approved capital spent on a scheduled portion of work on a project.
Planned Value Cost is often used for Earned Value Management.
This value can be entered manually or can be imported. This value is based on the workspace currency. -
plannedValueCostWorkspace3: number
(double)
The amount of approved capital spent on a scheduled portion of work on a project.
Planned Value Cost is often used for Earned Value Management.
This value can be entered manually or can be imported. This value is based on the workspace currency. -
profitabilityIndex: number
(double)
The index based on the value of a project's present values divided by initial project investments.
-
project:
project
Project object of project financial.
-
projectId: integer
(int64)
The unique identifier for a project set by the user who created the project.
-
proposedBudget: number
(double)
The Proposed Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own planned budgets and project forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Proposed Budget becomes the project's Approved Budget after the portfolio budget plan scenario is approved. This value is based on the base currency with specified exchange rate. -
proposedBudgetBaseDistributed: number
(double)
The amount of proposed budget currently allocated across the project timescale. This value is based on the base currency with specified exchange rate.
-
proposedBudgetBaseDistributedProject: number
(double)
The amount of proposed budget currently allocated across the project timescale. This value is based on the project currency.
-
proposedBudgetBaseDistributedWorkspace1: number
(double)
The amount of proposed budget currently allocated across the project timescale.
This value is based on the workspace1 currency. -
proposedBudgetBaseDistributedWorkspace2: number
(double)
The amount of proposed budget currently allocated across the project timescale.
This value is based on the workspace2 currency. -
proposedBudgetBaseDistributedWorkspace3: number
(double)
The amount of proposed budget currently allocated across the project timescale.
This value is based on the workspace3 currency. -
proposedBudgetBasePresentValue: number
(double)
The present value, also known as discounted value, of the portfolio proposed budget. Future cash flows are discounted using the project's annual discount rate. This value is based on the base currency with specified exchange rate.
-
proposedBudgetBasePresentValueProject: number
(double)
The present value, also known as discounted value, of the portfolio proposed budget. Future cash flows are discounted using the project's annual discount rate. This value is based on the project currency.
-
proposedBudgetBasePresentValueWorkspace1: number
(double)
The present value, also known as discounted value, of the portfolio proposed budget. Future cash flows are discounted using the project's annual discount rate. This value is based on the base currency with specified exchange rate.
This value is based on the workspace1 currency. -
proposedBudgetBasePresentValueWorkspace2: number
(double)
The present value, also known as discounted value, of the portfolio proposed budget. Future cash flows are discounted using the project's annual discount rate. This value is based on the base currency with specified exchange rate.
This value is based on the workspace2 currency. -
proposedBudgetBasePresentValueWorkspace3: number
(double)
The present value, also known as discounted value, of the portfolio proposed budget. Future cash flows are discounted using the project's annual discount rate. This value is based on the base currency with specified exchange rate.
This value is based on the workspace3 currency. -
proposedBudgetBaseUndistributed: number
(double)
The amount of proposed budget unallocated across the project timescale. This value is based on the base currency with specified exchange rate.
-
proposedBudgetBaseUndistributedProject: number
(double)
The amount of proposed budget unallocated across the project timescale. This value is based on the project currency.
-
proposedBudgetBaseUndistributedWorkspace1: number
(double)
The amount of proposed budget unallocated across the project timescale.
This value is based on the workspace1 currency. -
proposedBudgetBaseUndistributedWorkspace2: number
(double)
The amount of proposed budget unallocated across the project timescale.
This value is based on the workspace2 currency. -
proposedBudgetBaseUndistributedWorkspace3: number
(double)
The amount of proposed budget unallocated across the project timescale.
This value is based on the workspace3 currency. -
proposedBudgetCapitalCost: number
(double)
The Proposed capital Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own planned budgets and project forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Proposed Budget becomes the project's Approved Budget after the portfolio budget plan scenario is approved. This value is based on the base currency with specified exchange rate. -
proposedBudgetCapitalCostDistributed: number
(double)
The capital amount of proposed budget currently allocated across the project timescale. This value is based on the base currency with specified exchange rate.
-
proposedBudgetCapitalCostDistributedProject: number
(double)
The capital amount of proposed budget currently allocated across the project timescale. This value is based on the project currency.
-
proposedBudgetCapitalCostDistributedWorkspace1: number
(double)
The capital amount of proposed budget currently allocated across the project timescale. This value is based on the workspace currency.
-
proposedBudgetCapitalCostDistributedWorkspace2: number
(double)
The capital amount of proposed budget currently allocated across the project timescale. This value is based on the workspace currency.
-
proposedBudgetCapitalCostDistributedWorkspace3: number
(double)
The capital amount of proposed budget currently allocated across the project timescale. This value is based on the workspace currency.
-
proposedBudgetCapitalCostPresentValue: number
(double)
The capital present value, also known as discounted value, of the portfolio proposed budget. Future cash flows are discounted using the project's annual discount rate. This value is based on the base currency with specified exchange rate.
-
proposedBudgetCapitalCostPresentValueProject: number
(double)
The capital present value, also known as discounted value, of the portfolio proposed budget. Future cash flows are discounted using the project's annual discount rate. This value is based on the project currency.
-
proposedBudgetCapitalCostPresentValueWorkspace1: number
(double)
The capital present value, also known as discounted value, of the portfolio proposed budget. Future cash flows are discounted using the project's annual discount rate. This value is based on the workspace currency.
-
proposedBudgetCapitalCostPresentValueWorkspace2: number
(double)
The capital present value, also known as discounted value, of the portfolio proposed budget. Future cash flows are discounted using the project's annual discount rate. This value is based on the workspace currency.
-
proposedBudgetCapitalCostPresentValueWorkspace3: number
(double)
The capital present value, also known as discounted value, of the portfolio proposed budget. Future cash flows are discounted using the project's annual discount rate. This value is based on the workspace currency.
-
proposedBudgetCapitalCostProject: number
(double)
The Proposed capital Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own planned budgets and project forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Proposed Budget becomes the project's Approved Budget after the portfolio budget plan scenario is approved. This value is based on the project currency. -
proposedBudgetCapitalCostUnDistributed: number
(double)
The capital amount of proposed budget unallocated across the project timescale. This value is based on the base currency with specified exchange rate.
-
proposedBudgetCapitalCostUnDistributedProject: number
(double)
The capital amount of proposed budget unallocated across the project timescale. This value is based on the project currency.
-
proposedBudgetCapitalCostUnDistributedWorkspace1: number
(double)
The capital amount of proposed budget unallocated across the project timescale. This value is based on the workspace currency.
-
proposedBudgetCapitalCostUnDistributedWorkspace2: number
(double)
The capital amount of proposed budget unallocated across the project timescale. This value is based on the workspace currency.
-
proposedBudgetCapitalCostUnDistributedWorkspace3: number
(double)
The capital amount of proposed budget unallocated across the project timescale. This value is based on the workspace currency.
-
proposedBudgetCapitalCostWorkspace1: number
(double)
The Proposed capital Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own planned budgets and project forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Proposed Budget becomes the project's Approved Budget after the portfolio budget plan scenario is approved. This value is based on the workspace currency. -
proposedBudgetCapitalCostWorkspace2: number
(double)
The Proposed capital Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own planned budgets and project forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Proposed Budget becomes the project's Approved Budget after the portfolio budget plan scenario is approved. This value is based on the workspace currency. -
proposedBudgetCapitalCostWorkspace3: number
(double)
The Proposed capital Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own planned budgets and project forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Proposed Budget becomes the project's Approved Budget after the portfolio budget plan scenario is approved. This value is based on the workspace currency. -
proposedBudgetExpenseCost: number
(double)
The Proposed expense Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own planned budgets and project forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Proposed Budget becomes the project's Approved Budget after the portfolio budget plan scenario is approved. This value is based on the base currency with specified exchange rate. -
proposedBudgetExpenseCostDistributed: number
(double)
The expense amount of proposed budget currently allocated across the project timescale. This value is based on the base currency with specified exchange rate.
-
proposedBudgetExpenseCostDistributedProject: number
(double)
The expense amount of proposed budget currently allocated across the project timescale. This value is based on the project currency.
-
proposedBudgetExpenseCostDistributedWorkspace1: number
(double)
The expense amount of proposed budget currently allocated across the project timescale. This value is based on the workspace currency.
-
proposedBudgetExpenseCostDistributedWorkspace2: number
(double)
The expense amount of proposed budget currently allocated across the project timescale. This value is based on the workspace currency.
-
proposedBudgetExpenseCostDistributedWorkspace3: number
(double)
The expense amount of proposed budget currently allocated across the project timescale. This value is based on the workspace currency.
-
proposedBudgetExpenseCostPresentValue: number
(double)
The expense present value, also known as discounted value, of the portfolio proposed budget. Future cash flows are discounted using the project's annual discount rate. This value is based on the base currency with specified exchange rate.
-
proposedBudgetExpenseCostPresentValueProject: number
(double)
The expense present value, also known as discounted value, of the portfolio proposed budget. Future cash flows are discounted using the project's annual discount rate. This value is based on the project currency.
-
proposedBudgetExpenseCostPresentValueWorkspace1: number
(double)
The expense present value, also known as discounted value, of the portfolio proposed budget. Future cash flows are discounted using the project's annual discount rate. This value is based on the workspace currency.
-
proposedBudgetExpenseCostPresentValueWorkspace2: number
(double)
The expense present value, also known as discounted value, of the portfolio proposed budget. Future cash flows are discounted using the project's annual discount rate. This value is based on the workspace currency.
-
proposedBudgetExpenseCostPresentValueWorkspace3: number
(double)
The expense present value, also known as discounted value, of the portfolio proposed budget. Future cash flows are discounted using the project's annual discount rate. This value is based on the workspace currency.
-
proposedBudgetExpenseCostProject: number
(double)
The Proposed expense Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own planned budgets and project forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Proposed Budget becomes the project's Approved Budget after the portfolio budget plan scenario is approved. This value is based on the project currency. -
proposedBudgetExpenseCostUnDistributed: number
(double)
The expense amount of proposed budget unallocated across the project timescale. This value is based on the base currency with specified exchange rate.
-
proposedBudgetExpenseCostUnDistributedProject: number
(double)
The expense amount of proposed budget unallocated across the project timescale. This value is based on the project currency.
-
proposedBudgetExpenseCostUnDistributedWorkspace1: number
(double)
The expense amount of proposed budget unallocated across the project timescale. This value is based on the workspace currency.
-
proposedBudgetExpenseCostUnDistributedWorkspace2: number
(double)
The expense amount of proposed budget unallocated across the project timescale. This value is based on the workspace currency.
-
proposedBudgetExpenseCostUnDistributedWorkspace3: number
(double)
The expense amount of proposed budget unallocated across the project timescale. This value is based on the workspace currency.
-
proposedBudgetExpenseCostWorkspace1: number
(double)
The Proposed expense Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own planned budgets and project forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Proposed Budget becomes the project's Approved Budget after the portfolio budget plan scenario is approved. This value is based on the workspace currency. -
proposedBudgetExpenseCostWorkspace2: number
(double)
The Proposed expense Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own planned budgets and project forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Proposed Budget becomes the project's Approved Budget after the portfolio budget plan scenario is approved. This value is based on the workspace currency. -
proposedBudgetExpenseCostWorkspace3: number
(double)
The Proposed expense Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own planned budgets and project forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Proposed Budget becomes the project's Approved Budget after the portfolio budget plan scenario is approved. This value is based on the workspace currency. -
proposedBudgetProject: number
(double)
The Proposed Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own planned budgets and project forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Proposed Budget becomes the project's Approved Budget after the portfolio budget plan scenario is approved. This value is based on the project currency. -
proposedBudgetWorkspace1: number
(double)
The Proposed Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own planned budgets and project forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Proposed Budget becomes the project's Approved Budget after the portfolio budget plan scenario is approved.
This value is based on the workspace1 currency. -
proposedBudgetWorkspace2: number
(double)
The Proposed Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own planned budgets and project forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Proposed Budget becomes the project's Approved Budget after the portfolio budget plan scenario is approved.
This value is based on the workspace2 currency. -
proposedBudgetWorkspace3: number
(double)
The Proposed Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own planned budgets and project forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Proposed Budget becomes the project's Approved Budget after the portfolio budget plan scenario is approved.
This value is based on the workspace3 currency. -
proposedForecastVariance: number
(double)
The total and time phased variance between the project's Proposed Budget and Forecast. This value is based on the base currency with specified exchange rate.
-
proposedForecastVarianceProject: number
(double)
The total and time phased variance between the project's Proposed Budget and Forecast. This value is based on the project currency.
-
proposedForecastVarianceWorkspace1: number
(double)
The total and time phased variance between the project's Proposed Budget and Forecast. This value is based on the base currency with specified exchange rate.
This value is based on the workspace1 currency. -
proposedForecastVarianceWorkspace2: number
(double)
The total and time phased variance between the project's Proposed Budget and Forecast. This value is based on the base currency with specified exchange rate.
This value is based on the workspace2 currency. -
proposedForecastVarianceWorkspace3: number
(double)
The total and time phased variance between the project's Proposed Budget and Forecast. This value is based on the base currency with specified exchange rate.
This value is based on the workspace3 currency. -
proposedPlannedVar: number
(double)
The total and time phased variance between the project's Proposed Budget and Planned Budget. This value is based on the base currency with specified exchange rate.
-
proposedPlannedVarProject: number
(double)
The total and time phased variance between the project's Proposed Budget and Planned Budget. This value is based on the project currency.
-
proposedPlannedVarWorkspace1: number
(double)
The total and time phased variance between the project's Proposed Budget and Planned Budget. This value is based on the base currency with specified exchange rate.
This value is based on the workspace1 currency. -
proposedPlannedVarWorkspace2: number
(double)
The total and time phased variance between the project's Proposed Budget and Planned Budget. This value is based on the base currency with specified exchange rate.
This value is based on the workspace2 currency. -
proposedPlannedVarWorkspace3: number
(double)
The total and time phased variance between the project's Proposed Budget and Planned Budget. This value is based on the base currency with specified exchange rate.
This value is based on the workspace3 currency. -
remainingCost: number
(double)
The remaining total cost for the project, including labor resources, nonlabor resources, and project expenses when the project is summarized.
This value can be imported and integrated.
The value for remaining Cost cannot be entered/edited manually through UI. -
returnInvestment: number
(double)
The percentage resulting from division of the expected returns of an investment by the investment costs of a project or portfolio.
For example, a project is expected to cost 1.0 million dollars with a total benefit of 1.2 million dollars. Its Net Present Value is $200,000. The Return on Investment is 20%.
This value can be entered manually or can be imported. -
schedPerfIndex: number
(double)
The measure of the work accomplished as a percentage of the work scheduled on a project.
Schedule Performance Index indicates whether you are meeting earned and planned values within your project schedule.
A value less than 1 indicates that less work was performed than was scheduled. A value greater than 1 indicates the project is ahead of schedule.
This value can be entered manually or can be imported. -
scheduleVariance: number
(double)
The measure of schedule performance on a project.
A negative value indicates that less work was actually performed than was scheduled.
This value can be entered manually or can be imported. This value is based on the base currency with specified exchange rate. -
scheduleVarianceProject: number
(double)
The measure of schedule performance on a project.
A negative value indicates that less work was actually performed than was scheduled.
This value can be entered manually or can be imported. This value is based on the project currency. -
scheduleVarianceWorkspace1: number
(double)
The measure of schedule performance on a project.
A negative value indicates that less work was actually performed than was scheduled.
This value can be entered manually or can be imported. This value is based on the workspace currency. -
scheduleVarianceWorkspace2: number
(double)
The measure of schedule performance on a project.
A negative value indicates that less work was actually performed than was scheduled.
This value can be entered manually or can be imported. This value is based on the workspace currency. -
scheduleVarianceWorkspace3: number
(double)
The measure of schedule performance on a project.
A negative value indicates that less work was actually performed than was scheduled.
This value can be entered manually or can be imported. This value is based on the workspace currency. -
spendCost: number
(double)
The total amount incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the base currency with specified exchange rate. -
spendCostProject: number
(double)
The total amount incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the project currency. -
spendCostWorkspace1: number
(double)
The total amount incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the workspace currency. -
spendCostWorkspace2: number
(double)
The total amount incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the workspace currency. -
spendCostWorkspace3: number
(double)
The total amount incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the workspace currency. -
spendForecastVar: number
(double)
The total and time phased variance between the project's Actuals and Forecast. This value is based on the base currency with specified exchange rate.
-
spendForecastVarProject: number
(double)
The total and time phased variance between the project's Actuals and Forecast. This value is based on the project currency.
-
spendForecastVarWorkspace1: number
(double)
The total and time phased variance between the project's Actuals and Forecast. This value is based on the workspace currency.
-
spendForecastVarWorkspace2: number
(double)
The total and time phased variance between the project's Actuals and Forecast. This value is based on the workspace currency.
-
spendForecastVarWorkspace3: number
(double)
The total and time phased variance between the project's Actuals and Forecast. This value is based on the workspace currency.
-
spendPlannedVariance: number
(double)
The total and time phased variance between the project's Actuals and Planned Budget. This value is based on the base currency with specified exchange rate.
-
spendPlannedVarianceProject: number
(double)
The total and time phased variance between the project's Actuals and Planned Budget. This value is based on the project currency.
-
spendPlannedVarianceWorkspace1: number
(double)
The total and time phased variance between the project's Actuals and Planned Budget. This value is based on the workspace currency.
-
spendPlannedVarianceWorkspace2: number
(double)
The total and time phased variance between the project's Actuals and Planned Budget. This value is based on the workspace currency.
-
spendPlannedVarianceWorkspace3: number
(double)
The total and time phased variance between the project's Actuals and Planned Budget. This value is based on the workspace currency.
-
updateDate: string
(date-time)
Date when the record was last updated.
-
yearEndForecastCost: number
(double)
Total forecast at the end of year actuals till date, with respect to the current year. This value is based on the base currency with specified exchange rate.
-
yearEndForecastCostProject: number
(double)
Total forecast at the end of year actuals till date, with respect to the current year. This value is based on the project currency.
-
yearEndForecastCostWorkspace1: number
(double)
Total forecast at the end of year actuals till date, with respect to the current year. This value is based on the workspace currency.
-
yearEndForecastCostWorkspace2: number
(double)
Total forecast at the end of year actuals till date, with respect to the current year. This value is based on the workspace currency.
-
yearEndForecastCostWorkspace3: number
(double)
Total forecast at the end of year actuals till date, with respect to the current year. This value is based on the workspace currency.
-
ytdSpendCost: number
(double)
A measurement of capital spent on a project starting from the beginning of the year up to the present date.
YTD Actuals provides an overview of the total amount of actuals accrued on a project over the current Period Year. This value is based on the base currency with specified exchange rate. -
ytdSpendCostProject: number
(double)
A measurement of capital spent on a project starting from the beginning of the year up to the present date.
YTD Actuals provides an overview of the total amount of actuals accrued on a project over the current Period Year. This value is based on the project currency. -
ytdSpendCostWorkspace1: number
(double)
A measurement of capital spent on a project starting from the beginning of the year up to the present date.
YTD Actuals provides an overview of the total amount of actuals accrued on a project over the current Period Year. This value is based on the workspace currency. -
ytdSpendCostWorkspace2: number
(double)
A measurement of capital spent on a project starting from the beginning of the year up to the present date.
YTD Actuals provides an overview of the total amount of actuals accrued on a project over the current Period Year. This value is based on the workspace currency. -
ytdSpendCostWorkspace3: number
(double)
A measurement of capital spent on a project starting from the beginning of the year up to the present date.
YTD Actuals provides an overview of the total amount of actuals accrued on a project over the current Period Year. This value is based on the workspace currency.
Nested Schema : project
Project object of project financial.
Match All
Show Source
-
object
ApiEntityProject
Title:
ApiEntityProject
Nested Schema : ApiEntityProjectIntegrationSource
Type:
object
Title:
Show Source
ApiEntityProjectIntegrationSource
-
integrationSource: string
Allowed Values:
[ "P6", "UNIFIER" ]
The source of Integration. -
lastIntegratedDate: string
(date-time)
The date of the last successful Integration.
-
link: string
(url)
The self-link to the object. This field is populated only in the responses generated by the batch create APIs.
-
projectId: integer
(int64)
The system-generated identifier of the project.
-
projectIntegrationSourceId: integer
(int64)
The system-generated identifier of the project integration source. This value should not be provided in create operation request data, however, it is required for update requests.
-
sourceProjectId: string
Maximum Length:
255
The Project identifier of Integration source. -
sourceProjectName: string
Maximum Length:
255
The Project name of Integration source. -
updateDate: string
(date-time)
Date when the record was last updated.
Nested Schema : ApiEntityProjectSetting
Type:
object
Title:
Show Source
ApiEntityProjectSetting
-
link: string
(url)
The self-link to the object. This field is populated only in the responses generated by the batch create APIs.
-
projectId: integer
(int64)
The unique identifier of a project.
-
projectSettingId: integer
(int64)
The unique identifier of a project setting. This value should not be provided in create operation request data, however, it is required for update requests.
-
settingName: string
Minimum Length:
0
Maximum Length:255
The name of a project button. -
settingValue: string
Minimum Length:
0
Maximum Length:4000
Value of a project setting. -
updateDate: string
(date-time)
Date when the record was last updated.
404 Response
The requested project does not exist, or you do not have access to it.