View all Cashflows by Project
get
/api/restapi/projectCashflows/project/{projectId}
View all Cashflows by Project
Request
Path Parameters
-
projectId(required): integer(int64)
The system-generated identifier of a project.
There's no request body for this operation.
Back to TopResponse
Supported Media Types
- application/json
200 Response
Successful operation
Root Schema : List<ApiEntityProjectCashFlow>
Type:
array
Title:
Show Source
List<ApiEntityProjectCashFlow>
-
Array of:
object ApiEntityProjectCashFlow
Title:
ApiEntityProjectCashFlow
Nested Schema : ApiEntityProjectCashFlow
Type:
object
Title:
Show Source
ApiEntityProjectCashFlow
-
actualCapitalCost: number
(double)
The time phased actual capital spends incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the base currency with specified exchange rate. -
actualCapitalCostProject: number
(double)
The time phased actual capital spends incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the project currency. -
actualCapitalCostWorkspace1: number
(double)
The time phased actual capital spends incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the workspace currency. -
actualCapitalCostWorkspace2: number
(double)
The time phased actual capital spends incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the workspace currency. -
actualCapitalCostWorkspace3: number
(double)
The time phased actual capital spends incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the workspace currency. -
actualCost: number
(double)
Total costs accrued on a project within a given time period.
The Actual Cost data for the project's life cycle is pulled from the P6 EPPM schedule.
Actual Cost data is only available when the application is connected with P6 EPPM and is not editable. -
actualCostProject: number
(double)
The time phased actual spends incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the project currency. -
actualCostWorkspace1: number
(double)
The time phased actual spends incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the workspace currency. -
actualCostWorkspace2: number
(double)
The time phased actual spends incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the workspace currency. -
actualCostWorkspace3: number
(double)
The time phased actual spends incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the workspace currency. -
actualExpenseCost: number
(double)
The time phased actual expense spends incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the base currency with specified exchange rate. -
actualExpenseCostProject: number
(double)
The time phased actual expense spends incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the project currency. -
actualExpenseCostWorkspace1: number
(double)
The time phased actual expense spends incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the workspace currency. -
actualExpenseCostWorkspace2: number
(double)
The time phased actual expense spends incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the workspace currency. -
actualExpenseCostWorkspace3: number
(double)
The time phased actual expense spends incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the workspace currency. -
actualForecastVar: number
(double)
The total and time phased variance between the project's Actuals and Forecast. This value is based on the base currency with specified exchange rate.
-
actualForecastVarProject: number
(double)
The total and time phased variance between the project's Actuals and Forecast. This value is based on the project currency.
-
actualForecastVarWorkspace1: number
(double)
The total and time phased variance between the project's Actuals and Forecast. This value is based on the workspace currency.
-
actualForecastVarWorkspace2: number
(double)
The total and time phased variance between the project's Actuals and Forecast. This value is based on the workspace currency.
-
actualForecastVarWorkspace3: number
(double)
The total and time phased variance between the project's Actuals and Forecast. This value is based on the workspace currency.
-
atCompletionCost: number
(double)
Calculated as the sum of the Actual Costs plus Remaining Costs for the project.
You can copy the values of At Completion into the project's Forecast to accurately track the time phased costs of the project.
At Completion data is only available when the application is connected to P6 EPPM and is not editable.
The At Completion field is populated with the At Completion Total Cost from the project's P6 EPPM schedule. This value is based on the base currency with specified exchange rate. -
atCompletionCostProject: number
(double)
Calculated as the sum of the Actual Costs plus Remaining Costs for the project.
You can copy the values of At Completion into the project's Forecast to accurately track the time phased costs of the project.
At Completion data is only available when the application is connected to P6 EPPM and is not editable.
The At Completion field is populated with the At Completion Total Cost from the project's P6 EPPM schedule. This value is based on the project currency. -
atCompletionCostWorkspace1: number
(double)
Calculated as the sum of the Actual Costs plus Remaining Costs for the project.
You can copy the values of At Completion into the project's Forecast to accurately track the time phased costs of the project.
At Completion data is only available when the application is connected to P6 EPPM and is not editable.
The At Completion field is populated with the At Completion Total Cost from the project's P6 EPPM schedule. This value is based on the workspace currency. -
atCompletionCostWorkspace2: number
(double)
Calculated as the sum of the Actual Costs plus Remaining Costs for the project.
You can copy the values of At Completion into the project's Forecast to accurately track the time phased costs of the project.
At Completion data is only available when the application is connected to P6 EPPM and is not editable.
The At Completion field is populated with the At Completion Total Cost from the project's P6 EPPM schedule. This value is based on the workspace currency. -
atCompletionCostWorkspace3: number
(double)
Calculated as the sum of the Actual Costs plus Remaining Costs for the project.
You can copy the values of At Completion into the project's Forecast to accurately track the time phased costs of the project.
At Completion data is only available when the application is connected to P6 EPPM and is not editable.
The At Completion field is populated with the At Completion Total Cost from the project's P6 EPPM schedule. This value is based on the workspace currency. -
benefits: number
(double)
Project benefits is the income or positive cash flow from which all charges, costs, and expenses are subtracted to arrive at the net income. Also called sales, turnover, or revenue. This value is based on the base currency with specified exchange rate.
-
benefitsProject: number
(double)
Project benefits is the income or positive cash flow from which all charges, costs, and expenses are subtracted to arrive at the net income. Also called sales, turnover, or revenue. This value is based on the project currency.
-
benefitsWorkspace1: number
(double)
Project benefits is the income or positive cash flow from which all charges, costs, and expenses are subtracted to arrive at the net income. Also called sales, turnover, or revenue. This value is based on the workspace currency.
-
benefitsWorkspace2: number
(double)
Project benefits is the income or positive cash flow from which all charges, costs, and expenses are subtracted to arrive at the net income. Also called sales, turnover, or revenue. This value is based on the workspace currency.
-
benefitsWorkspace3: number
(double)
Project benefits is the income or positive cash flow from which all charges, costs, and expenses are subtracted to arrive at the net income. Also called sales, turnover, or revenue. This value is based on the workspace currency.
-
currentApprovedBudget: number
(double)
The approved time phased budget currently allocated to the project.
Current Approved Budget values are derived from the Proposed Budget set by the capital planner.
A Proposed Budget becomes a Current Approved Budget after the capital plan scenario has undergone the approval process. This value is based on the base currency with specified exchange rate. -
currentApprovedBudgetCapitalCost: number
(double)
The capital budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process. This value is based on the base currency with specified exchange rate. -
currentApprovedBudgetCapitalCostProject: number
(double)
The capital budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process. This value is based on the project currency. -
currentApprovedBudgetCapitalCostWorkspace1: number
(double)
The capital budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process. This value is based on the workspace currency. -
currentApprovedBudgetCapitalCostWorkspace2: number
(double)
The capital budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process. This value is based on the workspace currency. -
currentApprovedBudgetCapitalCostWorkspace3: number
(double)
The capital budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process. This value is based on the workspace currency. -
currentApprovedBudgetExpenseCost: number
(double)
The expense budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process. This value is based on the base currency with specified exchange rate. -
currentApprovedBudgetExpenseCostProject: number
(double)
The expense budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process. This value is based on the project currency. -
currentApprovedBudgetExpenseCostWorkspace1: number
(double)
The expense budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process. This value is based on the workspace currency. -
currentApprovedBudgetExpenseCostWorkspace2: number
(double)
The expense budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process. This value is based on the workspace currency. -
currentApprovedBudgetExpenseCostWorkspace3: number
(double)
The expense budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process. This value is based on the workspace currency. -
currentApprovedBudgetProject: number
(double)
The approved time phased budget currently allocated to the project.
Current Approved Budget values are derived from the Proposed Budget set by the capital planner.
A Proposed Budget becomes a Current Approved Budget after the capital plan scenario has undergone the approval process. This value is based on the project currency. -
currentApprovedBudgetWorkspace1: number
(double)
The budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process.
This value is based on the workspace1 currency. -
currentApprovedBudgetWorkspace2: number
(double)
The budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process.
This value is based on the workspace2 currency. -
currentApprovedBudgetWorkspace3: number
(double)
The budget currently approved for the project.
Current Approved Budget values are derived from the Proposed Budget set by the budget planner.
A Proposed Budget becomes the Approved Budget after the budget scenario has undergone the approval process.
This value is based on the workspace3 currency. -
currentApprovedSpendVariance: number
(double)
The total and time phased variance between the project's Approved Budget and Actuals.This value is based on the base currency with specified exchange rate.
-
currentApprovedSpendVarianceProject: number
(double)
The total and time phased variance between the project's Approved Budget and Actuals. This value is based on the project currency.
-
currentApprovedSpendVarianceWorkspace1: number
(double)
The total and time phased variance between the project's Approved Budget and Actuals. This value is based on the base currency with specified exchange rate. This value is based on the workspace1 currency.
-
currentApprovedSpendVarianceWorkspace2: number
(double)
The total and time phased variance between the project's Approved Budget and Actuals. This value is based on the base currency with specified exchange rate. This value is based on the workspace2 currency.
-
currentApprovedSpendVarianceWorkspace3: number
(double)
The total and time phased variance between the project's Approved Budget and Actuals. This value is based on the base currency with specified exchange rate. This value is based on the workspace3 currency.
-
forecastCapitalCost: number
(double)
The time phased estimation of a project's remaining capital costs.
After projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle.
Project managers can use time phasing to portray a detailed prediction of when the project will accrue its highest actuals. This value is based on the base currency with specified exchange rate. -
forecastCapitalCostProject: number
(double)
The time phased estimation of a project's remaining capital costs.
After projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle.
Project managers can use time phasing to portray a detailed prediction of when the project will accrue its highest actuals. This value is based on the project currency. -
forecastCapitalCostWorkspace1: number
(double)
The time phased estimation of a project's remaining capital costs.
After projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle.
Project managers can use time phasing to portray a detailed prediction of when the project will accrue its highest actuals. This value is based on the workspace currency. -
forecastCapitalCostWorkspace2: number
(double)
The time phased estimation of a project's remaining capital costs.
After projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle.
Project managers can use time phasing to portray a detailed prediction of when the project will accrue its highest actuals. This value is based on the workspace currency. -
forecastCapitalCostWorkspace3: number
(double)
The time phased estimation of a project's remaining capital costs.
After projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle.
Project managers can use time phasing to portray a detailed prediction of when the project will accrue its highest actuals. This value is based on the workspace currency. -
forecastCost: number
(double)
The time phased estimation of a project's remaining costs.
After projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle.
Project managers can use time phasing to portray a detailed prediction of when the project will accrue its highest actuals. This value is based on the base currency with specified exchange rate. -
forecastCostProject: number
(double)
The time phased estimation of a project's remaining costs.
After projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle.
Project managers can use time phasing to portray a detailed prediction of when the project will accrue its highest actuals. This value is based on the project currency. -
forecastCostWorkspace1: number
(double)
The time phased estimation of a project's remaining costs.
After projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle.
Project managers can use time phasing to portray a detailed prediction of when the project will accrue its highest actuals. This value is based on the workspace currency. -
forecastCostWorkspace2: number
(double)
The time phased estimation of a project's remaining costs.
After projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle.
Project managers can use time phasing to portray a detailed prediction of when the project will accrue its highest actuals. This value is based on the workspace currency. -
forecastCostWorkspace3: number
(double)
The time phased estimation of a project's remaining costs.
After projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle.
Project managers can use time phasing to portray a detailed prediction of when the project will accrue its highest actuals. This value is based on the workspace currency. -
forecastCurrApprVar: number
(double)
The total and time phased variance between the project's Forecast and Current Approved Budget. This value is based on the base currency with specified exchange rate.
-
forecastCurrApprVarProject: number
(double)
The total and time phased variance between the project's Forecast and Current Approved Budget. This value is based on the project currency.
-
forecastCurrApprVarWorkspace1: number
(double)
The total and time phased variance between the project's Forecast and Approved Budget. This value is based on the base currency with specified exchange rate.
This value is based on the workspace1 currency. -
forecastCurrApprVarWorkspace2: number
(double)
The total and time phased variance between the project's Forecast and Approved Budget. This value is based on the base currency with specified exchange rate.
This value is based on the workspace2 currency. -
forecastCurrApprVarWorkspace3: number
(double)
The total and time phased variance between the project's Forecast and Approved Budget. This value is based on the base currency with specified exchange rate.
This value is based on the workspace3 currency. -
forecastExpenseCost: number
(double)
The time phased estimation of a project's remaining expense costs.
After projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle.
Project managers can use time phasing to portray a detailed prediction of when the project will accrue its highest actuals. This value is based on the base currency with specified exchange rate. -
forecastExpenseCostProject: number
(double)
The time phased estimation of a project's remaining expense costs.
After projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle.
Project managers can use time phasing to portray a detailed prediction of when the project will accrue its highest actuals. This value is based on the project currency. -
forecastExpenseCostWorkspace1: number
(double)
The time phased estimation of a project's remaining expense costs.
After projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle.
Project managers can use time phasing to portray a detailed prediction of when the project will accrue its highest actuals. This value is based on the workspace currency. -
forecastExpenseCostWorkspace2: number
(double)
The time phased estimation of a project's remaining expense costs.
After projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle.
Project managers can use time phasing to portray a detailed prediction of when the project will accrue its highest actuals. This value is based on the workspace currency. -
forecastExpenseCostWorkspace3: number
(double)
The time phased estimation of a project's remaining expense costs.
After projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle.
Project managers can use time phasing to portray a detailed prediction of when the project will accrue its highest actuals. This value is based on the workspace currency. -
link: string
(url)
The self-link to the object. This field is populated only in the responses generated by the batch create APIs.
-
month: integer
(int32)
The time period during which budget planning for the project takes place in months.
-
plannedBudget: number
(double)
The planned time phased cost of a project as defined by the project manager.
Project managers can control the time phased allocations of a project's Planned Budget giving planner a sense of when the highest costs may be accrued on the project.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the base currency with specified exchange rate. -
plannedBudgetCapital: number
(double)
The planned time phased capital cost of a project as defined by the project manager.
Project managers can control the time phased allocations of a project's Planned Budget giving planner a sense of when the highest costs may be accrued on the project.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the base currency with specified exchange rate. -
plannedBudgetCapitalProject: number
(double)
The planned time phased capital cost in project currency of a project as defined by the project manager.
Project managers can control the time phased allocations of a project's Planned Budget giving planner a sense of when the highest costs may be accrued on the project.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the project currency. -
plannedBudgetCapitalWorkspace1: number
(double)
The planned time phased capital cost in project currency of a project as defined by the project manager.
Project managers can control the time phased allocations of a project's Planned Budget giving planner a sense of when the highest costs may be accrued on the project.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the workspace currency. -
plannedBudgetCapitalWorkspace2: number
(double)
The planned time phased capital cost in project currency of a project as defined by the project manager.
Project managers can control the time phased allocations of a project's Planned Budget giving planner a sense of when the highest costs may be accrued on the project.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the workspace currency. -
plannedBudgetCapitalWorkspace3: number
(double)
The planned time phased capital cost in project currency of a project as defined by the project manager.
Project managers can control the time phased allocations of a project's Planned Budget giving planner a sense of when the highest costs may be accrued on the project.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the workspace currency. -
plannedBudgetExpense: number
(double)
The planned time phased expense cost of a project as defined by the project manager.
Project managers can control the time phased allocations of a project's Planned Budget giving planner a sense of when the highest costs may be accrued on the project.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the base currency with specified exchange rate. -
plannedBudgetExpenseProject: number
(double)
The planned time phased expense cost in project currency of a project as defined by the project manager.
Project managers can control the time phased allocations of a project's Planned Budget giving planner a sense of when the highest costs may be accrued on the project.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the project currency. -
plannedBudgetExpenseWorkspace1: number
(double)
The planned time phased expense cost in project currency of a project as defined by the project manager.
Project managers can control the time phased allocations of a project's Planned Budget giving planner a sense of when the highest costs may be accrued on the project.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the workspace currency. -
plannedBudgetExpenseWorkspace2: number
(double)
The planned time phased expense cost in project currency of a project as defined by the project manager.
Project managers can control the time phased allocations of a project's Planned Budget giving planner a sense of when the highest costs may be accrued on the project.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the workspace currency. -
plannedBudgetExpenseWorkspace3: number
(double)
The planned time phased expense cost in project currency of a project as defined by the project manager.
Project managers can control the time phased allocations of a project's Planned Budget giving planner a sense of when the highest costs may be accrued on the project.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the workspace currency. -
plannedBudgetProject: number
(double)
The planned time phased cost in project currency of a project as defined by the project manager.
Project managers can control the time phased allocations of a project's Planned Budget giving planner a sense of when the highest costs may be accrued on the project.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the project currency. -
plannedBudgetWorkspace1: number
(double)
The planned time phased cost in project currency of a project as defined by the project manager.
Project managers can control the time phased allocations of a project's Planned Budget giving planner a sense of when the highest costs may be accrued on the project.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the workspace currency. -
plannedBudgetWorkspace2: number
(double)
The planned time phased cost in project currency of a project as defined by the project manager.
Project managers can control the time phased allocations of a project's Planned Budget giving planner a sense of when the highest costs may be accrued on the project.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the workspace currency. -
plannedBudgetWorkspace3: number
(double)
The planned time phased cost in project currency of a project as defined by the project manager.
Project managers can control the time phased allocations of a project's Planned Budget giving planner a sense of when the highest costs may be accrued on the project.
Planners can use Planned Budgets to determine how to allocate a plan's Proposed Budget values to projects, as well as what projects are reasonable to include in the current portfolio budget plan. This value is based on the workspace currency. -
projectCode: string
Minimum Length:
1
Maximum Length:60
The unique identifier for a project set by the user who created the project. -
projectId: integer
(int64)
The unique identifier for the project.
-
projectPhaseFinancialId: integer
(int64)
The unique internal identifier for the project's time-phased cost spread. This value should not be provided in create operation request data, however, it is required for update requests.
-
proposedBudget: number
(double)
The time phased Proposed Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own Planned Budgets and project Forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Becomes the projects Current Approved Budget after the portfolio budget plan scenario is approved. This value is based on the base currency with specified exchange rate. -
proposedBudgetCapitalCost: number
(double)
The Proposed capital Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own planned budgets and project forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Proposed Budget becomes the project's Approved Budget after the portfolio budget plan scenario is approved. This value is based on the base currency with specified exchange rate. -
proposedBudgetCapitalCostProject: number
(double)
The Proposed capital Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own planned budgets and project forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Proposed Budget becomes the project's Approved Budget after the portfolio budget plan scenario is approved. This value is based on the project currency. -
proposedBudgetCapitalCostWorkspace1: number
(double)
The Proposed capital Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own planned budgets and project forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Proposed Budget becomes the project's Approved Budget after the portfolio budget plan scenario is approved. This value is based on the workspace currency. -
proposedBudgetCapitalCostWorkspace2: number
(double)
The Proposed capital Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own planned budgets and project forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Proposed Budget becomes the project's Approved Budget after the portfolio budget plan scenario is approved. This value is based on the workspace currency. -
proposedBudgetCapitalCostWorkspace3: number
(double)
The Proposed capital Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own planned budgets and project forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Proposed Budget becomes the project's Approved Budget after the portfolio budget plan scenario is approved. This value is based on the workspace currency. -
proposedBudgetExpenseCost: number
(double)
The Proposed expense Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own planned budgets and project forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Proposed Budget becomes the project's Approved Budget after the portfolio budget plan scenario is approved. This value is based on the base currency with specified exchange rate. -
proposedBudgetExpenseCostProject: number
(double)
The Proposed expense Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own planned budgets and project forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Proposed Budget becomes the project's Approved Budget after the portfolio budget plan scenario is approved. This value is based on the project currency. -
proposedBudgetExpenseCostWorkspace1: number
(double)
The Proposed expense Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own planned budgets and project forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Proposed Budget becomes the project's Approved Budget after the portfolio budget plan scenario is approved. This value is based on the workspace currency. -
proposedBudgetExpenseCostWorkspace2: number
(double)
The Proposed expense Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own planned budgets and project forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Proposed Budget becomes the project's Approved Budget after the portfolio budget plan scenario is approved. This value is based on the workspace currency. -
proposedBudgetExpenseCostWorkspace3: number
(double)
The Proposed expense Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own planned budgets and project forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Proposed Budget becomes the project's Approved Budget after the portfolio budget plan scenario is approved. This value is based on the workspace currency. -
proposedBudgetProject: number
(double)
The time phased Proposed Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own Planned Budgets and project Forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Becomes the projects Current Approved Budget after the portfolio budget plan scenario is approved. This value is based on the project currency. -
proposedBudgetWorkspace1: number
(double)
The time phased Proposed Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own Planned Budgets and project Forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Becomes the projects Current Approved Budget after the portfolio budget plan scenario is approved. This value is based on the workspace currency. -
proposedBudgetWorkspace2: number
(double)
The time phased Proposed Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own Planned Budgets and project Forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Becomes the projects Current Approved Budget after the portfolio budget plan scenario is approved. This value is based on the workspace currency. -
proposedBudgetWorkspace3: number
(double)
The time phased Proposed Budget for the project as allocated by the budget planner.
Project managers can measure the proposed budget for their projects against their own Planned Budgets and project Forecasts.
If necessary, managers can request the planner make changes to the proposed budget allocated to their projects during budget plan scenario reviews.
Becomes the projects Current Approved Budget after the portfolio budget plan scenario is approved. This value is based on the workspace currency. -
proposedForecastVariance: number
(double)
The total and time phased variance between the project's Proposed Budget and Forecast. This value is based on the base currency with specified exchange rate.
-
proposedForecastVarianceProject: number
(double)
The total and time phased variance between the project's Proposed Budget and Forecast. This value is based on the project currency.
-
proposedForecastVarianceWorkspace1: number
(double)
The total and time phased variance between the project's Proposed Budget and Forecast. This value is based on the base currency with specified exchange rate.
This value is based on the workspace1 currency. -
proposedForecastVarianceWorkspace2: number
(double)
The total and time phased variance between the project's Proposed Budget and Forecast. This value is based on the base currency with specified exchange rate.
This value is based on the workspace2 currency. -
proposedForecastVarianceWorkspace3: number
(double)
The total and time phased variance between the project's Proposed Budget and Forecast. This value is based on the base currency with specified exchange rate.
This value is based on the workspace3 currency. -
proposedPlannedVar: number
(double)
The total and time phased variance between the project's Proposed Budget and Planned Budget. This value is based on the base currency with specified exchange rate.
-
proposedPlannedVarProject: number
(double)
The total and time phased variance between the project's Proposed Budget and Planned Budget. This value is based on the project currency.
-
proposedPlannedVarWorkspace1: number
(double)
The total and time phased variance between the project's Proposed Budget and Planned Budget. This value is based on the base currency with specified exchange rate.
This value is based on the workspace1 currency. -
proposedPlannedVarWorkspace2: number
(double)
The total and time phased variance between the project's Proposed Budget and Planned Budget. This value is based on the base currency with specified exchange rate.
This value is based on the workspace2 currency. -
proposedPlannedVarWorkspace3: number
(double)
The total and time phased variance between the project's Proposed Budget and Planned Budget. This value is based on the base currency with specified exchange rate.
This value is based on the workspace3 currency. -
spendCost: number
(double)
The time phased actual spends incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the base currency with specified exchange rate. -
spendCostProject: number
(double)
The time phased actual spends incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the project currency. -
spendCostWorkspace1: number
(double)
The time phased actual spends incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the workspace currency. -
spendCostWorkspace2: number
(double)
The time phased actual spends incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the workspace currency. -
spendCostWorkspace3: number
(double)
The time phased actual spends incurred on a project throughout its lifecycle, such as the costs of invoices, payments, or accruals.
Actuals cannot be edited if a project has a status of Proposal. This value is based on the workspace currency. -
spendPlannedVariance: number
(double)
The total and time phased variance between the project's Actuals and Planned Budget. This value is based on the base currency with specified exchange rate.
-
spendPlannedVarianceProject: number
(double)
The total and time phased variance between the project's Actuals and Planned Budget. This value is based on the project currency.
-
spendPlannedVarianceWorkspace1: number
(double)
The total and time phased variance between the project's Actuals and Planned Budget. This value is based on the workspace currency.
-
spendPlannedVarianceWorkspace2: number
(double)
The total and time phased variance between the project's Actuals and Planned Budget. This value is based on the workspace currency.
-
spendPlannedVarianceWorkspace3: number
(double)
The total and time phased variance between the project's Actuals and Planned Budget. This value is based on the workspace currency.
-
spreadDate: string
(date-time)
The starting date for a time phase of the project life cycle.
-
updateDate: string
(date-time)
Date when the record was last updated.
-
workspaceCode: string
Minimum Length:
0
Maximum Length:60
The user-specified identifier of a workspace. -
year: integer
(int32)
The time period during which budget planning for the project takes place in years.
-
yearEndForecastCost: number
(double)
Total forecast at the end of year actuals till date, with respect to the current year. This value is based on the base currency with specified exchange rate.
-
yearEndForecastCostProject: number
(double)
Total forecast at the end of year actuals till date, with respect to the current year. This value is based on the project currency.
-
yearEndForecastCostWorkspace1: number
(double)
Total forecast at the end of year actuals till date, with respect to the current year. This value is based on the workspace currency.
-
yearEndForecastCostWorkspace2: number
(double)
Total forecast at the end of year actuals till date, with respect to the current year. This value is based on the workspace currency.
-
yearEndForecastCostWorkspace3: number
(double)
Total forecast at the end of year actuals till date, with respect to the current year. This value is based on the workspace currency.
-
ytdActualCost: number
(double)
A measurement of capital spent on a project starting from the beginning of the year up to the present date.
YTD Actuals provides an overview of the total amount of actuals accrued on a project over the current Period Year. This value is based on the base currency with specified exchange rate. -
ytdActualCostProject: number
(double)
A measurement of capital spent on a project starting from the beginning of the year up to the present date.
YTD Actuals provides an overview of the total amount of actuals accrued on a project over the current Period Year. This value is based on the project currency. -
ytdActualCostWorkspace1: number
(double)
A measurement of capital spent on a project starting from the beginning of the year up to the present date.
YTD Actuals provides an overview of the total amount of actuals accrued on a project over the current Period Year. This value is based on the workspace currency. -
ytdActualCostWorkspace2: number
(double)
A measurement of capital spent on a project starting from the beginning of the year up to the present date.
YTD Actuals provides an overview of the total amount of actuals accrued on a project over the current Period Year. This value is based on the workspace currency. -
ytdActualCostWorkspace3: number
(double)
A measurement of capital spent on a project starting from the beginning of the year up to the present date.
YTD Actuals provides an overview of the total amount of actuals accrued on a project over the current Period Year. This value is based on the workspace currency.
204 Response
Successful operation with no content.
404 Response
The requested activity does not exist, or you do not have access to it.