Data Dictionary

% Complete (Payment Application)

% Retained (Payment Application)

(Pre-Response Risk Removal Pessimistic) Cost Impact (Risk Analysis)

(Pre-Response Risk Removal Pessimistic) Finish Impact (Risk Analysis)

Accepted By (Potential Change Order)

Action (Contract)

Action (Contracts and Commitments Change)

Activity Count (Project)

Activity Percent Complete (Activity)

Activity Percent Complete (Work Package)

Activity Weight Method (Work Package)

Actual Cost - Deterministic (Risk Analysis)

Actual Cost (Activity Assignment)

Actual Cost (Risk Analysis)

Actual Cost from P6 (Project Budget)

Actual Cost Impact (Risk)

Actual Cost to Date (Scope Assignment)

Actual Cost to Date (Work Package)

Actual Duration (Activity Assignment)

Actual Duration (Activity)

Actual Duration (Project)

Actual Duration (Risk Analysis)

Actual Duration (Risk Analysis)

Actual Effective Date (Program)

Actual Finish (Activity Assignment)

Actual Finish (Activity)

Actual Finish (Program)

Actual Finish (Project)

Actual Finish (Risk Analysis)

Actual Finish Date (Risk Analysis)

Actual Hours to Date (Scope Assignment)

Actual Hours to Date (Work Package)

Actual Labor Cost (Activity)

Actual Labor Units (Activity)

Actual Material Cost (Activity)

Actual Nonlabor Cost (Activity)

Actual Nonlabor Units (Activity)

Actual Over Time Units (Activity Assignment)

Actual Quantity to Date (Scope Assignment)

Actual Quantity to Date (Scope Item)

Actual Risk Response (Cost Sheet)

Actual Schedule Impact (Risk)

Actual Start (Activity Assignment)

Actual Start (Activity)

Actual Start (Program)

Actual Start (Project)

Actual Start (Risk Analysis)

Actual Start Date (Risk Analysis)

Actual This Period Cost (Activity Assignment)

Actual This Period Cost (Activity)

Actual This Period Units (Activity Assignment)

Actual This Period Units (Activity)

Actual Total Cost (Activity)

Actual Units (Activity Assignment)

Actual Units (Activity Assignment)

Actuals (Present Value) (Program Budget)

Actuals (Present Value) (Project Budget)

Actuals (Program Budget)

Actuals (Project Budget)

Actuals Effective Date (Project)

Actuals Finish (Project)

Actuals Start (Project)

Additional Approver (Payment Application)

Additional Approver Contact (Payment Application)

Adjusted Cost (Scope Assignment)

Adjusted Cost (Work Package)

Adjusted Hours (Scope Assignment)

Adjusted Hours (Work Package)

Adjusted Quantity (Scope Assignment)

Adjusted Quantity (Scope Item)

Agreement Current Value (Payment Application)

Agreement Original Value (Payment Application)

Allocated (Funds)

Allocated (Funds)

Allocated Funds (Funds)

Amount (Budget Transaction)

Amount (Program Budget Transaction)

Amount Approved (Payment Application)

Amount Approved (Payment Application)

Annual Discount Rate (Program Budget)

Annual Discount Rate (Project Budget)

Answer (Potential Change Order)

Answered By (Potential Change Order)

Application Administrator

Appropriated (Funds)

Appropriated Funds (Funds)

Approval Date (Budget Change Request)

Approval Date (Budget Transfer)

Approval Date (Change Order)

Approval Date (Program Budget Change Request)

Approved Budget (Budget Planning)

Approved Budget (Present Value) (Project Budget)

Approved Budget Finish Date (Project)

Approved Budget Start Date (Project)

Approved Change Cost (Scope Assignment)

Approved Change Cost (Work Package)

Approved Change Hours (Scope Assignment)

Approved Change Hours (Work Package)

Approved Change Orders (Payment Application)

Approved Change Quantity (Scope Assignment)

Approved Commitment Changes (Actual Risk Response Cost)

Approved Commitment Changes (Cost Sheet)

Approved Commitment Potential Change Orders (Actual Risk Response Cost)

Approved Commitment Potential Change Orders (Cost Sheet)

Approved Commitments (Actual Risk Response Cost)

Approved Commitments (Cost Sheet)

Approved Contract Changes (Actual Risk Response Cost)

Approved Contract Changes (Cost Sheet)

Approved Contract Potential Change Orders (Actual Risk Response Cost)

Approved Contract Potential Change Orders (Cost Sheet)

Approved Contracts (Actual Risk Response Cost)

Approved Contracts (Cost Sheet)

Approved Date (Budget Transaction)

Approved Revenue (Actual Risk Response Cost)

Approved Revenue (Cost Sheet)

Approved Spends (Actual Risk Response Cost)

Approved Spends (Cost Sheet)

Assigned Quantity (Scope Item)

Assigned To (Potential Change Order)

Associated Agreement (Change Order)

Associated Agreement (Payment Application)

Associated Agreement (Potential Change Order)

Associated Commitment (Contracts and Commitments)

Associated Contract (Commitment)

At Completion (Project Budget)

At Completion Cost (Activity Assignment)

At Completion Cost (Scope Assignment)

At Completion Cost (Work Package)

At Completion Duration - Deterministic (Risk Analysis)

At Completion Duration (Activity Assignment)

At Completion Duration (Activity)

At Completion Hours (Scope Assignment)

At Completion Hours (Work Package)

At Completion Labor Cost (Activity)

At Completion Labor Units (Activity)

At Completion Material Cost (Activity)

At Completion Nonlabor Cost (Activity)

At Completion Nonlabor Units (Activity)

At Completion Quantity (Scope Assignment)

At Completion Quantity (Scope Item)

At Completion Total Cost - Deterministic (Risk Analysis)

At Completion Total Cost (Activity)

At Completion Units (Activity Assignment)

Available Hours (Scope Assignment)

Available Quantity (Scope Assignment)

BAC Cost (Scope Assignment)

BAC Cost (Work Package)

BAC Hours (Scope Assignment)

BAC Hours (Work Package)

BAC Quantity (Scope Assignment)

Balance Remaining (Change Order)

Balance Remaining (Commitment)

Balance Remaining (Contract)

Balance To Finish + Retainage (Payment Application)

Ball in Court (Potential Change Order)

Ball in Court (Potential Change Order)

Baseline Cost (Scope Assignment)

Baseline Cost (Work Package)

Baseline Finish (Work Package)

Baseline Hours (Scope Assignment)

Baseline Hours (Work Package)

Baseline Quantity (Scope Item)

Baseline Start (Scope Assignment)

Baseline Start (Work Package)

Benefits (Present Value) (Project Budget)

Benefits (Project Budget)

Benefits Finish Date (Program)

Benefits Start Date (Program)

BL Activity Percent Complete (Activity)

BL Activity Status (Activity)

BL Actual Duration (Activity)

BL Actual Finish (Activity)

BL Actual Labor Cost (Activity)

BL Actual Labor Units (Activity)

BL Actual Material Cost (Activity)

BL Actual Nonlabor Cost (Activity)

BL Actual Nonlabor Units (Activity)

BL Actual Start (Activity)

BL Actual Total Cost (Activity)

BL Duration Percent Complete (Activity)

BL Early Finish (Activity)

BL Early Start (Activity)

BL Finish (Activity)

BL Free Float (Activity)

BL Late Finish (Activity)

BL Late Start (Activity)

BL Percent Complete Type (Activity)

BL Planned Duration (Activity)

BL Planned Labor Cost (Activity)

BL Planned Labor Units (Activity)

BL Planned Material Cost (Activity)

BL Planned Nonlabor Cost (Activity)

BL Planned Nonlabor Units (Activity)

BL Planned Total Cost (Activity)

BL Remaining Duration (Activity)

BL Start (Activity)

BL Total Float (Activity)

BL Units Percent Complete (Activity)

BL Variance - Duration (Activity)

BL Variance - Finish (Activity)

BL Variance - Labor Cost (Activity)

BL Variance - Labor Units (Activity)

BL Variance - Material Cost (Activity)

BL Variance - Nonlabor Cost (Activity)

BL Variance - Nonlabor Units (Activity)

BL Variance - Start (Activity)

BL Variance - Total Cost (Activity)

Budget Approval Date (Project Budget)

Budget Approved By (Project Budget)

Budget At Completion (Activity)

Budget At Completion (Activity)

Budget At Completion (Schedule)

Budget At Completion Labor Units (Activity)

Budget At Completion Method (Work Package)

Budget At Completion Units (Activity)

Budget Change ID (Budget Transaction)

Budget Planning Horizon (Portfolio)

Budget Planning Period (Budget Planning)

Budget Review Status (Budget Planning)

Budget Status (Budget Planning)

Budget Status (Project Budget)

Budget Transfer ID (Budget Transaction)

Business Impact (Program)

Calculate Costs from Units (Activity Assignment)

Change Amount (Change Order)

Change Amount (Change Order)

Change Estimate (Change Order)

Change Estimate (Potential Change Order)

Change Order (Change Order)

Change Order Additions (Previous) (Payment Application)

Change Order Additions (This Period) (Payment Application)

Change Order Deductions (Previous) (Payment Application)

Change Order Deductions (This Period) (Payment Application)

Change Reference (Change Order)

Change Reference (Change Order)

Change Reference (Potential Change Order)

Collected Commitment Total (Change Order)

Collected from Commitment (Change Order)

Collected into Change Order (Change Order)

Commitment (Commitment)

Commitment (Commitment)

Commitment Manager (Commitment)

Commitment Status (Task)

Completed and Stored to Date (Payment Application)

Confirmed Actuals (Cost Sheet)

Constraint Count (Task)

Constraint Impact (Task)

Construction Value (Project Budget)

Consumed

Consumed (Funds)

Contingency (Risk)

Contract (Contract)

Contract (Contract)

Contract Manager (Contract)

Cost Category (Budget Item)

Cost Category (Budget Transaction)

Cost Category (Change Order)

Cost Category (Change Order)

Cost Category (Commitment)

Cost Category (Commitment)

Cost Category (Contract)

Cost Category (Contract)

Cost Category (Potential Change Order)

Cost Performance Index (CPI) (Schedule)

Cost Performance Index (CPI) Labor Units (Activity)

Cost Performance Index (Project Budget)

Cost Performance Index Labor Units (Schedule)

Cost Variance (Activity)

Cost Variance (Project Budget)

Cost Variance (Schedule)

Cost Variance Index (Activity)

Cost Variance Index (Schedule)

Cost Variance Index Labor Units (Activity)

Cost Variance Index Labor Units (Schedule)

Cost Variance Labor Units (Schedule)

Cost Weight (Scope Assignment)

Critical - Deterministic (Risk Analysis)

Critical (Activity Relationship)

Current Committed Due Date (Task)

Current Cost (Budget Item)

Current Cost (Budget Transaction)

Current Cost (Program Budget Item)

Current Cost (Program Budget Transaction)

Current Payment Due (Payment Application)

Current Payment Due (Payment Application)

Current Value (Commitment)

Current Value (Contract)

Curve (Activity Assignment)

Data Date (Project)

Date Identified (Task Constraint)

Date Needed (Task Constraint)

Date Submitted (Potential Change Order)

Delivered Date (Task Constraint)

Distributed (Funds)

Distributed Approved Budget (Budget Planning)

Distributed Approved Budget (Budget Planning)

Distributed Approved Budget (Project Budget)

Distributed Benefits (Project Budget)

Distributed Forecast (Project Budget)

Distributed Planned Budget (Project Budget)

Distributed Proposed Budget (Budget Planning)

Distributed Proposed Budget (Budget Planning)

Distributed Proposed Budget (Project Budget)

Distributed Target Budget (Budget Planning)

Drive Activity Dates (Activity Assignment)

Driving (Activity Relationship)

Due Date (Task)

Duration Percent Complete (Activity)

Duration Percent of Planned (Activity)

EAC Cost (Scope Assignment)

EAC Cost (Work Package)

EAC Hours (Scope Assignment)

EAC Hours (Work Package)

EAC Quantity (Scope Assignment)

Early Finish - Deterministic (Risk Analysis)

Early Finish (Activity)

Early Start - Deterministic (Risk Analysis)

Early Start (Activity)

Earned Cost (Scope Assignment)

Earned Cost (Work Package)

Earned Hours (Scope Assignment)

Earned Hours (Work Package)

Earned Percent Complete (Work Package)

Earned Quantity (Scope Assignment)

Earned Value Cost (Activity)

Earned Value Cost (Activity)

Earned Value Cost (Project Budget)

Earned Value Cost (Schedule)

Earned Value Labor Units (Activity)

Earned Value Labor Units (Schedule)

Earned Value Period Cost (Activity)

Earned Value Period Units (Activity)

Earned Value Units (Activity)

Effective Finish (Scope Assignment)

Effective Finish (Scope Item)

Effective Finish (Work Package)

Effective Start (Scope Assignment)

Effective Start (Scope Item)

Effective Start (Work Package)

Effective Start Date (Resource/Role)

Effective Start Date (Resource/Role)

End Date (Funds)

Estimate At Completion (EAC) (Activity)

Estimate At Completion (EAC) Labor Units (Activity)

Estimate At Completion (EAC) Labor Units (Schedule)

Estimate at Completion (Project Budget)

Estimate To Complete (ETC) (Activity)

Estimate To Complete (ETC) Labor Units (Schedule)

Estimate to Complete (Project Budget)

Estimate To Complete (Schedule)

Estimate To Complete Performance Index (TCPI) (Activity)

Estimate To Complete Performance Index (TCPI) (Schedule)

Estimated Commitment Changes (Actual Risk Response Cost)

Estimated Commitment Changes (Cost Sheet)

Estimated Contract Changes (Actual Risk Response Cost)

Estimated Contract Changes (Cost Sheet)

ETC Cost (Scope Assignment)

ETC Cost (Work Package)

ETC Hours (Scope Assignment)

ETC Hours (Work Package)

ETC Quantity (Scope Assignment)

Evaluation Score

Evaluation Score (Program)

Evaluation Score (Project)

Exchange Rate (Change Order)

Exchange Rate (Change Order)

Exchange Rate (Commitment)

Exchange Rate (Commitment)

Exchange Rate (Contract)

Exchange Rate (Contract)

Exchange Rate (Payment Application)

Exchange Rate (Potential Change Order)

Exposure Finish Date (Risk)

Exposure Start Date (Risk)

Financial Impact (Potential Change Order)

Financial Impact (Potential Change Order)

Finish - Deterministic (Risk Analysis)

Finish (Activity Assignment)

Finish (Activity)

Finish (Budget Planning)

Finish Date (Activity)

Finish Date (Commitment)

Finish Date (Contract)

Float Path (Activity)

Float Path Order (Activity)

Forecast (Present Value) (Project Budget)

Forecast (Project Budget)

Forecast Finish (Project)

Forecast Finish Date (Program)

Forecast Start (Project)

Forecast Start Date (Program)

Free Float - Deterministic (Risk Analysis)

Free Float (Activity)

From Budget Change (Budget Item)

From Company (Change Order)

From Company (Commitment)

From Company (Contract)

From Company (Payment Application)

From Company (Potential Change Order)

From Contact (Change Order)

From Contact (Commitment)

From Contact (Contract)

From Contact (Payment Application)

From Contact (Potential Change Order)

From Contact Title (Change Order)

High Value (Thresholds)

High Value (Thresholds)

High Value (Thresholds)

Hours (Budget Item)

Hours (Budget Transaction)

Hours Weight (Scope Assignment)

Impacted Date (Risk)

Incremental Actual Cost To Date (Scope Assignment)

Incremental Actual Hours To Date (Scope Assignment)

Incremental Installed Cost (Scope Assignment)

Incremental Installed Hours (Scope Assignment)

Incremental Installed Quantity (Scope Assignment)

Installed Cost (Scope Assignment)

Installed Cost (Work Package)

Installed Finish (Scope Assignment)

Installed Finish (Work Package)

Installed Hours (Scope Assignment)

Installed Hours (Work Package)

Installed Quantity (Scope Assignment)

Installed Quantity (Scope Item)

Installed Start (Scope Assignment)

Installed Start (Work Package)

Internal Rate of Return (Program Budget)

Internal Rate of Return (Project Budget)

Labor Rate (Budget Item)

Labor Rate (Budget Transaction)

Labor Rate (Program Budget Item)

Labor Rate (Program Budget Transaction)

Labor Units Percent Complete (Activity)

Lag - Use Only Work Days (Task)

Lag (Activity Relationship)

Lag (Risk Analysis)

Lag (Task)

Last Status Action (Contracts and Commitments)

Late Finish - Deterministic (Risk Analysis)

Late Finish (Activity)

Late Start - Deterministic (Risk Analysis)

Late Start (Activity)

Line Item ID (Commitment)

Link Forecast to Actuals (Program)

Longest Path - Deterministic (Risk Analysis)

Manual Completed Weight (Scope Assignment)

Manual Weight (Scope Assignment)

Max Units/Time (Resource/Role)

Max Units/Time (Resource/Role)

Maximum Duration (Risk Analysis)

Milestone Percent Complete (Scope Assignment)

Milestone Progress Percent Complete (Scope Assignment)

Minimum Duration (Risk Analysis)

Most Likely Duration (Risk Analysis)

Net Present Value (Project Budget)

Nonlabor Units Percent Complete (Activity)

Non-Working Percentage (Risk Weather)

Non-Working Persistence (Risk Weather)

Non-Working Time Definition (Risk Weather)

Operator (Thresholds)

Original Committed Due Date (Task)

Original Cost (Budget Item)

Original Cost (Program Budget Item)

Original Cost (Scope Assignment)

Original Cost (Work Package)

Original Cost Rate (Scope Assignment)

Original Finish (Scope Assignment)

Original Finish (Work Package)

Original Hours (Scope Assignment)

Original Hours (Scope Item)

Original Hours (Work Package)

Original Productivity Rate (Scope Assignment)

Original Productivity Rate (Scope Item)

Original Quantity (Scope Assignment)

Original Quantity (Scope Assignment)

Original Quantity (Scope Item)

Original Start (Scope Assignment)

Original Start (Work Package)

Original Value (Commitment)

Original Value (Contract)

Parent Schedule of Values (Change Order)

Parent Schedule of Values (Contract)

Payback Period (Project Budget)

Pending Actuals (Cost Sheet)

Pending Change Cost (Scope Assignment)

Pending Change Cost (Work Package)

Pending Change Hours (Scope Assignment)

Pending Change Hours (Scope Item)

Pending Change Hours (Work Package)

Pending Change Quantity (Scope Assignment)

Pending Change Quantity (Scope Item)

Pending Commitment Changes (Actual Risk Response Cost)

Pending Commitment Changes (Cost Sheet)

Pending Commitment Potential Change Orders (Actual Risk Response Cost)

Pending Commitment Potential Change Orders (Cost Sheet)

Pending Commitments (Actual Risk Response Cost)

Pending Commitments (Cost Sheet)

Pending Contract Changes (Actual Risk Response Cost)

Pending Contract Changes (Cost Sheet)

Pending Contract Potential Change Orders (Actual Risk Response Cost)

Pending Contract Potential Change Orders (Cost Sheet)

Pending Contracts (Actual Risk Response Cost)

Pending Contracts (Cost Sheet)

Pending Revenue (Actual Risk Response Cost)

Pending Revenue (Cost Sheet)

Pending Spends (Actual Risk Response Cost)

Pending Spends (Cost Sheet)

Percent Complete (Commitment)

Percent Complete (Contract)

Percent Complete (Project)

Percent Complete Type (Activity)

Performance Percent Complete (Schedule)

Performance Percent Complete (Scope Assignment)

Performance Period (Commitment)

Performance Period (Contract)

Period Actual Labor Cost (Schedule)

Period Actual Labor Units (Schedule)

Period Actual Material Cost (Schedule)

Period Actual Nonlabor Cost (Schedule)

Period Actual Nonlabor Units (Schedule)

Period Actual Total Cost (Schedule)

Period Applied (Change Order)

Period Applied (Change Order)

Period Applied (Commitment)

Period Applied (Contract)

Period Earned Value Cost (Schedule)

Period Earned Value Labor Units (Schedule)

Period Planned Value Cost (Schedule)

Period Planned Value Labor Units (Schedule)

Period To (Payment Application)

Pessimistic Remaining Cost Variance Percentage (Risk Analysis)

Pessimistic Remaining Duration Variance (Risk Analysis)

Pessimistic Remaining Duration Variance Percentage (Risk Analysis)

Pessimistic Start Variance (Risk Analysis)

Physical Percent Complete (Activity)

Planned Budget (Present Value) (Project Budget)

Planned Budget (Project Budget)

Planned Cost (Activity Assignment)

Planned Duration (Activity Assignment)

Planned Duration (Activity)

Planned Duration (Project)

Planned Finish (Activity Assignment)

Planned Finish (Activity)

Planned Finish (Scope Assignment)

Planned Finish (Work Package)

Planned Labor Cost (Activity)

Planned Labor Units (Activity)

Planned Lag (Activity Assignment)

Planned Material Cost (Activity)

Planned Nonlabor Cost (Activity)

Planned Nonlabor Units (Activity)

Planned Response Cost (Risk)

Planned Risk Response (Actual Risk Response Cost)

Planned Risk Response (Cost Sheet)

Planned Start (Activity Assignment)

Planned Start (Activity)

Planned Start (Scope Assignment)

Planned Start (Work Package)

Planned Total Cost (Activity)

Planned Units (Activity Assignment)

Planned Units/Time (Activity Assignment)

Planned Value Cost (Activity)

Planned Value Cost (Activity)

Planned Value Cost (Project Budget)

Planned Value Cost (Schedule)

Planned Value Labor Units (Activity)

Planned Value Labor Units (Schedule)

Planned Value Period Cost (Activity)

Planned Value Period Units (Activity)

Planned Value Units (Activity)

Portfolio Approved Budget (Project Budget)

Portfolio Proposed Budget (Project Budget)

Post-Response Cost (Risk)

Post-Response Exposure (Risk)

Pre-Response At-Completion Cost Mean Contribution (Risk Analysis)

Pre-Response At-Completion Cost Standard Deviation (Risk Analysis)

Pre-Response At-Completion Cost Variance (Risk Analysis)

Pre-Response Cost (Risk)

Pre-Response Cost Variance (Risk Analysis)

Pre-Response Criticality Index (Risk Analysis)

Pre-Response Deterministic At-Completion Cost Probability (Risk Analysis)

Pre-Response Deterministic Finish Probability (Risk Analysis)

Pre-Response Deterministic Remaining Cost Probability (Risk Analysis)

Pre-Response Deterministic Remaining Duration Probability (Risk Analysis)

Pre-Response Deterministic Start Probability (Risk Analysis)

Pre-Response Exposure (Risk)

Pre-Response Finish Standard Deviation (Risk Analysis)

Pre-Response Maximum At-Completion Cost (Risk Analysis)

Pre-Response Maximum Finish (Risk Analysis)

Pre-Response Maximum Remaining Cost (Risk Analysis)

Pre-Response Maximum Remaining Duration (Risk Analysis)

Pre-Response Maximum Start (Risk Analysis)

Pre-Response Mean At-Completion Cost (Risk Analysis)

Pre-Response Mean Finish (Risk Analysis)

Pre-Response Mean Remaining Cost (Risk Analysis)

Pre-Response Mean Remaining Duration (Risk Analysis)

Pre-Response Mean Start (Risk Analysis)

Pre-Response Minimum At-Completion Cost (Risk Analysis)

Pre-Response Minimum Finish (Risk Analysis)

Pre-Response Minimum Remaining Cost (Risk Analysis)

Pre-Response Minimum Remaining Duration (Risk Analysis)

Pre-Response Minimum Start (Risk Analysis)

Pre-Response Optimistic At-Completion Cost (Risk Analysis)

Pre-Response Optimistic Finish (Risk Analysis)

Pre-Response Optimistic Remaining Cost (Risk Analysis)

Pre-Response Optimistic Remaining Duration (Risk Analysis)

Pre-Response Optimistic Start (Risk Analysis)

Pre-Response P50 At-Completion Cost (Risk Analysis)

Pre-Response P50 Finish (Risk Analysis)

Pre-Response P50 Remaining Cost (Risk Analysis)

Pre-Response P50 Remaining Duration (Risk Analysis)

Pre-Response P50 Start (Risk Analysis)

Pre-Response Pessimistic At-Completion Cost (Risk Analysis)

Pre-Response Pessimistic At-Completion Cost Contingency (Risk Analysis)

Pre-Response Pessimistic Finish (Risk Analysis)

Pre-Response Pessimistic Finish Contingency (Risk Analysis)

Pre-Response Pessimistic Remaining Cost (Risk Analysis)

Pre-Response Pessimistic Remaining Cost Contingency (Risk Analysis)

Pre-Response Pessimistic Remaining Duration (Risk Analysis)

Pre-Response Pessimistic Remaining Duration Contingency (Risk Analysis)

Pre-Response Pessimistic Start (Risk Analysis)

Pre-Response Pessimistic Start Contingency (Risk Analysis)

Pre-Response Project Mean Cost Contribution (Risk Analysis)

Pre-Response Project Mean Delay Contribution (Risk Analysis)

Pre-Response Remaining Duration Standard Deviation (Risk Analysis)

Pre-Response Standard Deviation Remaining Cost (Risk Analysis)

Pre-Response Start Standard Deviation (Risk Analysis)

Previous Amount Approved (Payment Application)

Price/Unit (Activity Assignment)

Prior Actual Cost (Activity Assignment)

Prior Actual Cost (Activity)

Prior Actual Labor Cost (Schedule)

Prior Actual Labor Units (Schedule)

Prior Actual Material Cost (Schedule)

Prior Actual Nonlabor Cost (Schedule)

Prior Actual Nonlabor Units (Schedule)

Prior Actual Total Cost (Schedule)

Prior Actual Units (Activity)

Problem or Opportunity (Program)

Production Rate (Budget Item)

Production Rate (Budget Transaction)

Proficiency (Activity Assignment)

Profitability Index (Project Budget)

Program Planned Finish (Program)

Program Planned Start (Program)

Project Actual Hours

Project Actual Hours

Project CPI

Project Currency (Project)

Project Current Actuals

Project Current Budget

Project Current Budget (Project Budget)

Project Current Commitments

Project Current Commitments (Actual Risk Response Cost)

Project Current Commitments (Cost Sheet)

Project Current Contracts

Project Current Contracts (Actual Risk Response Cost)

Project Current Contracts (Cost Sheet)

Project Earned Cost

Project Earned Hours

Project Earned Hours

Project Finish (Project)

Project HPI

Project HPI

Project Mean Cost Increase (Risk Analysis)

Project Mean Cost Increase% (Risk Analysis)

Project Mean Delay % (Risk Analysis)

Project Mean Delay (Risk Analysis)

Project Original Budget (Project Budget)

Project Planned Finish (Project)

Project Planned Start (Project)

Project Response Actual Cost (Risk Analysis)

Project Response Remaining Cost (Risk Analysis)

Project Start (Project)

Promised Date (Task Constraint)

Proposed Budget (Budget Planning)

Proposed Budget (Budget Planning)

Proposed Budget (Present Value) (Project Budget)

Proposed Budget Finish (Project)

Proposed Budget Start (Project)

Proposed Due Date (Task)

Proposed Role Allocation (Resource Demand)

Quantity (Actual Line Item)

Quantity (Budget Item)

Quantity (Budget Transaction)

Quantity (Change Order)

Quantity (Change Order)

Quantity (Commitment)

Quantity (Commitment)

Quantity (Contract)

Quantity (Contract)

Quantity (Potential Change Order)

Quantity Weight (Scope Assignment)

Question (Potential Change Order)

Rate Source (Activity Assignment)

Rate Type (Activity Assignment)

Reasons Missed (Task)

Reference Number (Commitment)

Reference Number (Contract)

Rejected By (Budget Change Request)

Rejected By (Budget Transfer)

Rejected By (Project Budget)

Rejected Date (Budget Change Request)

Rejected Date (Budget Transfer)

Rejected Date (Project Budget)

Relationship Early Finish (Activity Relationship)

Relationship Early Start (Activity Relationship)

Relationship Free Float (Activity Relationship)

Relationship Late Finish (Activity Relationship)

Relationship Late Start (Activity Relationship)

Relationship Successor Free Float (Activity Relationship)

Relationship Successor Total Float (Activity Relationship)

Relationship Total Float (Activity Relationship)

Relationship Type (Activity Relationship)

Remaining (Funds)

Remaining Cost - Deterministic (Risk Analysis)

Remaining Cost (Activity Assignment)

Remaining Cost (Project Budget)

Remaining Cost (Scope Assignment)

Remaining Cost (Work Package)

Remaining Duration - Deterministic (Risk Analysis)

Remaining Duration (Activity Assignment)

Remaining Duration (Activity)

Remaining Duration (Project)

Remaining Duration (Risk Analysis)

Remaining Early Finish (Activity)

Remaining Early Finish (Project)

Remaining Early Finish (Scope Assignment)

Remaining Early Finish (Work Package)

Remaining Early Start (Activity)

Remaining Early Start (Project)

Remaining Early Start (Scope Assignment)

Remaining Early Start (Work Package)

Remaining Float (Activity)

Remaining Hours (Scope Assignment)

Remaining Hours (Work Package)

Remaining Labor Cost (Activity)

Remaining Labor Units (Activity)

Remaining Lag (Activity Assignment)

Remaining Late Finish (Activity Assignment)

Remaining Late Finish (Activity)

Remaining Late Finish (Scope Assignment)

Remaining Late Finish (Work Package)

Remaining Late Start (Activity Assignment)

Remaining Late Start (Activity)

Remaining Late Start (Scope Assignment)

Remaining Late Start (Work Package)

Remaining Late Units (Activity Assignment)

Remaining Material Cost (Activity)

Remaining Nonlabor Cost (Activity)

Remaining Nonlabor Units (Activity)

Remaining Quantity (Scope Assignment)

Remaining Quantity (Scope Item)

Remaining Total Cost - Deterministic (Risk Analysis)

Remaining Total Cost (Activity)

Remaining Units (Activity Assignment)

Remaining Units (Activity Assignment)

Remaining Units/Time (Activity Assignment)

Reopened By (Potential Change Order)

Resource Type (Activity Assignment)

Response Context (Risk Analysis)

Responsible Company (Task Constraint)

Responsible Party (Task Constraint)

Restricted User

Resume Date (Activity)

Resume Date (Risk Analysis)

Retainage (Change Order)

Retainage (Commitment)

Retainage (Contract)

Return on Investment (Project Budget)

Revised Cost (Scope Assignment)

Revised Cost (Work Package)

Revised Cost Rate (Scope Assignment)

Revised Finish (Scope Assignment)

Revised Finish (Work Package)

Revised Finish Date (Commitment)

Revised Finish Date (Contract)

Revised Hours (Scope Assignment)

Revised Hours (Scope Assignment)

Revised Hours (Scope Item)

Revised Hours (Work Package)

Revised Performance Period (Commitment)

Revised Performance Period (Contract)

Revised Productivity Rate (Scope Assignment)

Revised Productivity Rate (Scope Item)

Revised Quantity (Scope Assignment)

Revised Quantity (Scope Item)

Revised Start (Scope Assignment)

Revised Start (Work Package)

Revised Start Date (Commitment)

Revised Start Date (Contract)

Risk Closed Post-Response Exposure (Actual Risk Response Cost)

Risk Closed Pre-Response Exposure (Actual Risk Response Cost)

Risk Level (Project)

Risk Open Post-Response Exposure (Actual Risk Response Cost)

Risk Open Pre-Response Exposure (Actual Risk Response Cost)

Risk Score (Project)

Role Committed (Resource Demand)

Role Demand (Resource Demand)

Schedule Check - Dangling Finish (Activity)

Schedule Check - Dangling Start (Activity)

Schedule Check - FF Predecessor (Activity)

Schedule Check - FS Predecessor (Activity)

Schedule Check - Hard Constraint (Activity)

Schedule Check - Invalid Progress Date (Activity)

Schedule Check - Large Duration (Activity)

Schedule Check - Large Float (Activity)

Schedule Check - Late Activity (Activity)

Schedule Check - Negative Float (Activity)

Schedule Check - No Predecessors (Activity)

Schedule Check - No Roles or Resources (Activity)

Schedule Check - No Successors (Activity)

Schedule Check - Open Ends (Activity)

Schedule Check - Predecessor Lag (Activity)

Schedule Check - Predecessor Negative Lag (Activity)

Schedule Check - SF Predecessor (Activity)

Schedule Check - Soft Constraint (Activity)

Schedule Check - SS Predecessor (Activity)

Schedule Finish Date (Risk Analysis)

Schedule Health - Dangling Finish % (Project)

Schedule Health - Dangling Finish activity count (Project)

Schedule Health - Dangling Start % (Project)

Schedule Health - Dangling Start activity count (Project)

Schedule Health - FF Predecessor % (Project)

Schedule Health - FF Predecessor activity count (Project)

Schedule Health - FS Predecessor % (Project)

Schedule Health - FS Predecessor activity count (Project)

Schedule Health - Hard Constraint % (Project)

Schedule Health - Hard Constraint activity count (Project)

Schedule Health - Invalid Progress Date % (Project)

Schedule Health - Invalid Progress Date activity count (Project)

Schedule Health - Large Duration % (Project)

Schedule Health - Large Duration activity count (Project)

Schedule Health - Large Float % (Project)

Schedule Health - Large Float activity count (Project)

Schedule Health - Late Activity % (Project)

Schedule Health - Late Activity activity count (Project)

Schedule Health - Negative Float % (Project)

Schedule Health - Negative Float activity count (Project)

Schedule Health - No Predecessor % (Project)

Schedule Health - No Predecessor activity count (Project)

Schedule Health - No Roles or Resources % (Project)

Schedule Health - No Roles or Resources activity count (Project)

Schedule Health - No Successor % (Project)

Schedule Health - No Successor activity count (Project)

Schedule Health - Open Ends % (Project)

Schedule Health - Open Ends activity count (Project)

Schedule Health - Overall Health % (Project)

Schedule Health - Predecessor Lag % (Project)

Schedule Health - Predecessor Lag activity count (Project)

Schedule Health - Predecessor Negative Lag % (Project)

Schedule Health - Predecessor Negative Lag activity count (Project)

Schedule Health - SF Predecessor % (Project)

Schedule Health - SF Predecessor activity count (Project)

Schedule Health - Soft Constraint % (Project)

Schedule Health - Soft Constraint activity count (Project)

Schedule Health - SS Predecessor % (Project)

Schedule Health - SS Predecessor activity count (Project)

Schedule Impact (Potential Change Order)

Schedule Impact (Potential Change Order)

Schedule Must Finish By Date (Project)

Schedule Percent Complete (Activity)

Schedule Percent Complete (Schedule)

Schedule Performance Index (Project Budget)

Schedule Performance Index (SPI) (Activity)

Schedule Performance Index (SPI) (Schedule)

Schedule Performance Index (SPI) Labor Units (Activity)

Schedule Performance Index Labor Units (Schedule)

Schedule Variance (Activity)

Schedule Variance (Project Budget)

Schedule Variance (Schedule)

Schedule Variance Index (Activity)

Schedule Variance Labor Units (Activity)

Scheduled Finish Date (Project)

Scheduled Value (Change Order)

Scheduled Value (Commitment)

Scheduled Value (Contract)

Scope Percent Complete (Activity)

Scope Percent Complete (Scope Assignment)

Scope Percent Complete (Scope Item)

Scope Percent Complete (Work Package)

Scope Percent Complete Weight Method (Project)

Scope Percent Complete Weight Method (Work Package)

Score (Project Evaluation)

Slack (Task)

Spend Finish Date (Program)

Spend Start Date (Program)

Staffed Remaining Cost (Activity Assignment)

Staffed Remaining Units (Activity Assignment)

Start - Deterministic (Risk Analysis)

Start (Activity Assignment)

Start (Activity)

Start (Budget Planning)

Start Date (Activity)

Start Date (Commitment)

Start Date (Contract)

Start Date (Funds)

Start Date (Risk Analysis)

Start Date (Task)

Status

Status

Status - Dates (Task)

Status (Baseline)

Status (Budget Change Request)

Status (Budget Transaction)

Status (Budget Transfer)

Status (Change Order)

Status (Commitment)

Status (Contract)

Status (Funds)

Status (Payment Application)

Status (Potential Change Order)

Status (Potential Change Order)

Status (Program Budget Change Request)

Status (Program)

Status (Risk)

Status (Schedule Scenario)

Status (Task Constraint)

Status Change Date (Program)

Strategic Objective (Program)

Strategic Priority (Project)

Suspend Date (Activity)

Target Budget (Budget Planning)

Task Check - Commitments (Task)

Task Check - Due This Week (Task)

Task Check - Overdue (Task)

Task Check - Pending (Task)

Task Check - Planned Outside Activity Dates (Task)

Task Check - Scheduled on Non-work Days (Task)

Task Check - Tasks with Slack (Task)

Task Check - Unaccepted Proposed Due Date (Task)

Task Check - Unassigned (Task)

Task Check - Unplanned (Task)

Task Status - Completion (Activity)

Task Status - Dates (Activity)

Task Status - Indicator (Activity)

Time Change (Change Order)

Timesheet Actual Start (Activity Assignment)

Timesheet Actual Units (Activity Assignment)

Total (Change Order)

Total (Commitment)

Total (Contract)

Total (Funds)

Total Actual Response Cost (Risk)

Total Cost

Total Cost (Project Budget Change)

Total Earned Less Retainage (Payment Application)

Total Float - Deterministic (Risk Analysis)

Total Float (Activity)

Total Retainage (Payment Application)

Transfer From Budget (Budget Transaction)

Transfer From CBS Code (Budget Transaction)

Transfer From Cost Category (Budget Transaction)

Transfer To Budget (Budget Transaction)

Transfer To CBS Code (Budget Transaction)

Transfer To Cost Category (Budget Transaction)

Transfer Type (Budget Transaction)

Type (Activity)

Type (Baseline)

Type (Change Order)

Type (Change Order)

Type (Commitment)

Type (Commitment)

Type (Commitment)

Type (Contract)

Type (Contract)

Type (Contract)

Type (Potential Change Order)

Type (Risk Analysis)

Type (Risk Analysis)

Type (Schedule Scenario)

Type (Task Constraint)

Type (Task)

Type (Thresholds)

Unallocated (Funds)

Unappropriated (Funds)

Unassigned Quantity (Scope Item)

Undistributed (Funds)

Undistributed Approved Budget (Budget Planning)

Undistributed Approved Budget (Budget Planning)

Undistributed Approved Budget (Project Budget)

Undistributed Benefits (Program Budget)

Undistributed Benefits (Project Budget)

Undistributed Forecast (Project Budget)

Undistributed Planned Budget (Project Budget)

Undistributed Proposed Budget (Budget Planning)

Undistributed Proposed Budget (Budget Planning)

Undistributed Proposed Budget (Project Budget)

Undistributed Target Budget (Budget Planning)

Unit of Measure (Budget Item)

Unit of Measure (Budget Transaction)

Unit Of Measure (Change Order)

Unit Of Measure (Change Order)

Unit Of Measure (Commitment)

Unit Of Measure (Commitment)

Unit Of Measure (Contract)

Unit Of Measure (Contract)

Unit Of Measure (Potential Change Order)

Unit Price (Actual Line Item)

Unit Price (Change Order)

Unit Price (Change Order)

Unit Price (Commitment)

Unit Price (Commitment)

Unit Price (Contract)

Unit Price (Contract)

Unit Rate (Budget Item)

Unit Rate (Budget Transaction)

Unit Rate (Program Budget Item)

Unit Rate (Program Budget Transaction)

Units Percent Complete (Activity Assignment)

Units Percent Complete (Activity)

Unstaffed Remaining Cost (Activity Assignment)

Unstaffed Remaining Units (Activity Assignment)

Use Only Work Days (Task)

Value (Thresholds)

Value (Thresholds)

Variance - Finish Date (Project)

Variance - Start Date (Project)

Variance (Actuals - Forecast) (Project Budget)

Variance (Actuals - Planned Budget) (Project Budget)

Variance (Allocated Fund - Forecast) (Project Budget)

Variance (Allocated Fund - Planned Budget) (Project Budget)

Variance (Forecast - Portfolio Approved Budget) (Project Budget)

Variance (Portfolio Approved Budget - Actuals) (Project Budget)

Variance (Portfolio Proposed Budget - Forecast) (Project Budget)

Variance (Proposed Budget - Planned Budget) (Project Budget)

Variance At Completion (Activity)

Variance At Completion (Schedule)

Variance At Completion Labor Units (Activity)

Withdraw Approval Date (Budget Change Request)

Withdraw Approval Date (Budget Transfer)

Withdraw Approval Date (Project Budget)

Withdraw Approval Date (Project Budget)

Year End Forecast (YEF) (Project Budget)

YTD Actuals (Project Budget)