Specify Role Demand for a Project

Use the Resource Demand page to enter demand units on the workspace roles assigned to the projects in your portfolio. These units will appear at the portfolio level during portfolio resource planning. After a portfolio's resource plan is approved, the approved units will be displayed on this page as allocated units.

Specify role demand by entering time units or FTE value for each role. You can display fields for role Demand, Commitment, and Proposed Allocation costs to further inform your resource demand planning decisions. Role costs are read-only and are based on each role's workspace-level Price/Unit 1 value set for the current availability period.

To specify role demand:

  1. In the object selector, select a project.
  2. In the sidebar, hover over Resources, and select Resource Demand.
  3. In the table, select a role.
  4. In the role's Demand row, select a Start date. You can optionally set the role's Finish date to calculate its Duration, or enter Duration to calculate the Finish date. These calculations are performed after the page is saved.
  5. Enter demand units in one of the following ways:
    • Total: On the role's Demand row, in the Total column, enter the total labor units required. The labor units are spread between the role's start and finish dates, according to the role calendar.
    • Timescale: In the Demand row, enter the labor units in the appropriate timescale interval.

      Note: The Timescale setting can be changed in the Settings dialog box on the Timescale tab or by right-clicking on the timescale in the table and selecting an option.

    • FTE: Enter the full-time equivalents needed for the entire period between the start and end dates. The labor units are populated on the timescale.

      Note: Select FTE to display role units in the full-time equivalent values of the timescale interval.

  6. Select Save.
  7. After saving, the role's demand costs are calculated from its demand units.