Configure Task Summary Settings

The Task Summary tool consists of checks that monitor various project metrics. Each check can be enabled or disabled in the project settings. Some checks also have minimum criteria values that can be modified. Individual checks can be enabled or disabled according to your organization's needs. Completed tasks are not included in any of the check results.

To configure settings for the Task Summary tool:

  1. Navigate to the project settings page
  2. Select the Tasks tab.
  3. In the Task Summary Settings section, configure the following settings:
    • For each check, select the Active option to include the selected check in the Task Summary panel.
    • For each check that supports minimum criteria values, in the Minimum Criteria field, enter a new value.
  4. Save your changes:
    1. Select Save.
    2. In the Summary & Settings panel, select Close.

Tips

This setting is used in the following apps:

Tasks