How to Set Turn-Around Time on a Specific Log

When logged into Submittal Exchange, go to the Preferences tab.

  1. In the Project Logs field, select the log for which to set the turnaround time. The Edit Log Settings dialog box appears.
  2. In the Turnaround drop-down either:
    • Select Project Default - The default is the Required Item Turnaround on the Preferences tab.
    • Select Other - Two drop-down fields appear next to the Turnaround field. Select the number of days in the first field and choose between Business or Calendar days from the second.
  3. Select Save.

    Note: This will set reminder notifications for the selected calendar days or business days. A reminder will be sent a day prior to the due date and daily thereafter until an item is reviewed.



Last Published Thursday, May 29, 2025