What is the Review Flow for the Log Type 8?

When logged into Submittal Exchange, select a project and go to the appropriate log. The steps are listed as column headings in the Display Full Log view.

  1. An Architect can upload the initial document.
    • The General Contractor can do an initial upload, skipping the Architect altogether.
  2. The General Contractor then reviews the Architect's file. The General Contractor can:
    • Replace the Architect's upload.

    AND/OR

    • Upload their reviewed file (with or without changes).
  3. The Consultant then reviews the General Contractor's file by uploading their reviewed file (with or without changes).
    • Multiple Consultant reviews may be performed within this step if there are more Consultant companies that need to review the same document.

      Note: Most logs with this review flow on Submittal Exchange do NOT include the Consultants in the review.

  4. The Architect then reviews the Consultant's file by uploading their reviewed file (with or without changes).
    • The Architect can skip the Consultant reviews altogether, meaning that Step #3 can be skipped entirely.
  5. The Project Team can then download the final reviewed file.