| Agile Product Lifecycle Management Database Installation and Management Guide Release 9.3.6 E71162-01 |
|
![]() Previous |
![]() Next |
You can deploy the Agile PLM in different configurations. The length of time to complete an installation depends on the complexity of your Agile PLM deployment.
|
Note: For installations using a certified localized language, all server components must be installed on computers running the same localized operating system. Clients can be running on the same localized or English operating system. For detailed information about using Agile with international operating systems, refer to the Agile support website:http://www.oracle.com/agile/support.html. |
You can install the Agile PLM in a distributed environment, over a wide-area network with multiple servers, or limited to one or two server computers with several client computers. In the latter case, you can install Agile in a shorter period, approximately within a half day. Network-based systems are inherently complex, and installations require additional time.
|
Note: Oracle recommends installing the Oracle Database Server on a separate computer from the other Agile components. |
It is acceptable to install multiple server components on the same computer if sufficient hardware resources are available. However, you must increase the minimum hardware requirements based on the number of server components installed on a single computer.
For a complete list of hardware and software requirements, refer to the Agile PLM Capacity Planning Guide.