After MAP-Diameter Interworking configuration is complete, various activities need to be performed to make the MD-IWF and DM-IWF applications fully operational in the system:
- Enable the MD-IWF and DM-IWF DSR applications on SS7-MPs and DA-MPs respectively
- Enable Diameter Connections with Peer Nodes
- Status Verification