Go to primary content
Diameter Signaling Router MAP-Diameter Interworking Function
Release 8.2
E89007
Go To Table Of Contents
Contents

Previous
Previous
Next
Next

Post-Configuration Activities

After MAP-Diameter Interworking configuration is complete, various activities need to be performed to make the MD-IWF and DM-IWF applications fully operational in the system:
  • Enable the MD-IWF and DM-IWF DSR applications on SS7-MPs and DA-MPs respectively
  • Enable Diameter Connections with Peer Nodes
  • Status Verification