Go to primary content
Diameter Signaling Router Policy and Charging Application
Release 8.2
E89000
Go To Table Of Contents
Contents

Previous
Previous
Next
Next

Restart Process

Use this task to restart the DSR and Policy and Charging SBR process

  1. On the NOAM, navigate to Status & Manage > Server.
  2. Select the MP servers with a DSR (multi-active cluster) function that are or will be handling PCA traffic and all MP servers with a Policy and Charging SBR function.
    Click Restart.

    Note:

    The function of an MP Server is the same as the function assigned to its Server Group on Configuration > Server Groups.

    Note:

    If the DSR system is processing traffic other than PCA, then do not restart all DA-MP servers simultaneously because doing so will cause a network-wide outage. In order to restart the DA-MP servers in a controlled order to minimize traffic loss, follow the steps in unresolvable-reference.htm#GUID-94BBD8FF-429D-492B-9884-D1671B0B9A3A.