Go to primary content
Diameter Signaling Router Policy and Charging Application
Release 8.2
E89000
Go To Table Of Contents
Contents

Previous
Previous
Next
Next

Configuring Diameter SOAM parameters for Online Charging DRA

  1. Identify and log the all the OCSs handling the Gy/Ro Traffic for this site.
  2. Identify and log the all the CTFs to be configured for Session State maintenance.
  3. Identify and log the error code configuration for each of the Error Conditions in the table for the Gy/Ro interface.