Go to primary content
Diameter Signaling Router Range Based Address Resolution (RBAR) User's Guide
Release 8.2
E89002-01
Go To Table Of Contents
Contents

Previous
Previous
Next
Next

Post-Configuration Activities

After RBAR configuration is complete, the following activities need to be performed to make RBAR fully operational in the system:
  • Enabling the RBAR application
  • Status Verification