Oracle® Communications Diameter Signaling Router Measurements Release 8.3 E93201 |
|
![]() Previous |
![]() Next |
Time interval for each transaction starts when the DRL successfully decodes an ingress Request message from a downstream peer. Time interval for each transaction stops when the DRL attempts to send an Answer response to the DCL/RCL. This includes Answer messages received from upstream peers and those generated by the DRL.
The connection measurement is associated with the connection from which the Request message was received.
Recovery