Go to primary content
Oracle® Communications Diameter Signaling Router Full Address Based Resolution (FABR) User's Guide
Release 8.4
F12298
Contents
Previous
Next
Post-Configuration Activities
After
FABR
configuration is complete, the following activities need to be performed to make
FABR
fully operational in the system:
Enabling the
FABR
application, if it has not already been enabled.
Status Verification