Go to primary content
Oracle® Communications Diameter Signaling Router Full Address Based Resolution (FABR) User's Guide
Release 8.4
F12298
Go To Table Of Contents
Contents

Previous
Previous
Next
Next

Post-Configuration Activities

After FABR configuration is complete, the following activities need to be performed to make FABR fully operational in the system:
  • Enabling the FABR application, if it has not already been enabled.
  • Status Verification