Description of the illustration bp_wl_rpt_inputs.gif
The image shows the Task Priorities Report page. The first area shows the following fields: Assignee (drop-down list), Creation Date, Ended Date, and Priority (drop-down list. Between the fields and the Results section is the Run button. Below the Run button is the Results section. The Results section shows a table, on the left, with the following columns: Assignees, Priority, and Number of Tasks. To the right is the Task Priorities Report bar chart with the x-axis labeled Priority and the y-axis labeled Number of tasks.