Configuring Autosequence Events

  1. Select the Enterprise level, click Configuration, and then click PC Autosequences.
  2. Insert a record for the autosequence event (for example, Nightly Batch). If the autosequence event record exists, skip this step.
  3. Double-click the record to open it.
  4. On the General tab, select each Property to include in the autosequence event run.
  5. (Optional) Select the employee group that is allowed to run the autosequence event from the Privilege Group drop-down list.
  6. (Optional) To restrict execution of the autosequence event, click the Add link from the Parameters section, and then add optional parameters.
  7. Click the Steps tab.
  8. Beneath the Steps section, click the Add link to add the first step of the autosequence event.
  9. From the Step Parameters section, select the Step Type from the drop-down list.
  10. Repeat Steps 9 and 10 to add each step required to run the autosequence event.
  11. Select the outcome for each step:
    • Step on Success: Select the step number to occur next if a step succeeds. For example, after Step 1 runs successfully, proceed to Step 2.

    • Step on Failure: Select the step number to occur next if a step fails. For example, if Step 1 fails, do no proceed with any steps.

  12. Click Save.

Related Topics