Revision History

Date Description
June 2016

Accessibility changes throughout.

January 2017

Signaling Firewall added as a new maintenance feature.

Listen Port updates for Peer Node

Nested Application Route Table/Peer Route Table (ART/PRT) added in the Routing Option Sets

Forward to Application Route Table and Forward to Peer Route Table rule actions are used for selecting the Target Application Route Table and Target Peer Route Table when adding an Application Routing Rule.

Forward to Peer Route Table rule action is used for selecting the Target Peer Route Table when adding a Peer Routing Rule.

Responder Only connections associated with a Peer Node are not considered listen ports (SCTP, TCP, TLS, or DTLS).

Message Discard Policy added to the Per-Connection Ingress MPS Control.

Excessive Reroute Onset Threshold and Excessive Reroute Abatement Threshold added to General Options tab in System Options.

Added in Diameter Capacity Summary table Maximum values per NE and per Configuration Component.

Target Set Address change Primary Public IP Address (TSA-p) to Public IP Address (TSA) and Secondary Public IP Address (TSA-s) to Alternate Public IP Address (TSA-a).

Maximum number of Routing Option Sets increased to 50 sets.

Egress Transport Congestion Levels are CL0-CL3, CL98.

Egress Convergence Time (msec) default is 250 msec.

One Egress Message Rate period is 15 msec.

Connection Capacity Dashboard new tabs and fields changes:

  • Connections Table tab
  • TSn: #Floating IPFE Connections
  • Connection Reserved Ingress MPS Table
  • TSn: #Floating IPFE Connections Reserved Ingress MPS
  • IPFE Scaling Factor is now Connection Reserved Ingress MPS Scaling

IPFE Connections are now Floating IPFE Connections throughout the user guide.

DA-MP Maintenance screen in the DA-MP Connectivity tab changes in columns #IPFE Connections Configured to #Floating IPFE Connections Configured and #IPFE Connections Established to #Floating IPFE Connections Established.

March 2017 Added Diameter Application Priority Options