Go to primary content
User Data Repository Diameter User's Guide
Release 12.4
E92984-01
Go To Table Of Contents
Contents

Previous
Previous
Next
Next

Enabling Egress Throttle Groups Pending Transaction Limiting

Use the following steps to Enable Egress Throttle Groups Pending Transaction Limiting.

The Egress Throttle Groups Pending Transaction Limiting Admin State of Egress Throttle Groups can be updated irrespective of the Operational Status of the associated Peer Node Connections.

  1. Click Diameter > Maintenance > Egress Throttle Groups.
  2. Select at least 1, but no more than 20 Egress Throttle Groups to Disable.
    To select multiple Egress Throttle Groups, press and hold the CTRL key when selecting each Egress Throttle Group. To select multiple contiguous Egress Throttle Groups, click the first Egress Throttle Group to be selected, then press the SHIFT key and select the last Egress Throttle Group to be selected. All Egress Throttle Groups between are also selected.
  3. Click Enable Pending Transaction Limiting.
    1. A confirmation box appears if between 1 and 20 Egress Throttle Group Names are selected.
      Click OK in the confirmation box to Enable the selected Egress Throttle Group Names.
      Click Cancel in the confirmation box to cancel the Enable action. The Admin State of the selected Egress Throttle Groups remains unchanged.
      If OK is clicked and any of the following conditions exist, then an error message appears:
      • Any of the selected Egress Throttle Groups do not exist in the database.
      • Any of the selected Egress Throttle Groups do not have Egress Throttling Groups Pending Transaction Limiting configured.
    2. An Alert Box is displayed if more than 20 Egress Throttle Groups are selected.