P6 EPPM Field | P6 EPPM Column Name |
---|---|
acct_id | Default Cost Account |
act_pct_link_flag | Link Percent Complete With Actual |
act_this_per_link_flag | Link actual to date and actual this period units and costs |
add_act_remain_flag | Add Actual To Remain |
add_by_name | Added By |
add_date | Date Added |
allow_complete_flag | Can resources mark activities completed |
allow_neg_act_flag | Allow Negative Actual Units |
apply_actuals_date | Last Apply Actuals Date |
base_type_id | Baseline Type |
batch_sum_flag | Enable Summarization |
checkout_date | Date Checked Out |
checkout_flag | Project Check-out Status |
checkout_user_id | Checked Out By |
chng_eff_cmp_pct_flag | Resources Edit Percent Complete (P6 Professional only) |
clndr_id | Default Calendar |
control_updates_flag | Status Update Control |
cost_qty_recalc_flag | Cost Qty Recalc Flag |
cr_external_key | Content Repository External UUID |
critical_drtn_hr_cnt | Critical activities have float less than or equal to |
critical_path_type | critical_path_type |
def_complete_pct_type | Default Percent Complete Type |
def_cost_per_qty | Default Price / Unit |
def_duration_type | Default Duration Type |
def_qty_type | Default Price Time Units |
def_rate_type | Rate Type |
def_rollup_dates_flag | Drive Activity Dates Default |
def_task_type | Default Activity Type |
fcst_start_date | Project Forecast Start |
fintmpl_id | Financial Period Calendar ID |
fy_start_month_num | Fiscal Year Begins |
guid | Global Unique ID |
hist_interval | History Interval |
hist_level | History Level |
intg_proj_type | Integrated Project (P6 Professional only) |
last_baseline_update_date | Last Update Date |
last_checksum | Last Checksum |
last_fin_dates_id | Financial Period |
last_level_date | Last Leveled Date ( only) |
last_recalc_date | Last Recalc Date P6 EPPM |
last_schedule_date | Last Scheduled Date (P6 EPPM only) |
last_tasksum_date | Last Summarized Date |
location_id | Project Location Note: P6 Professional exports all Locations defined in Enterprise Data, irrespective of whether the location is used in the projects being exported. P6 exports only the Locations assigned to the projects being exported, their activities, and their resources. |
msp_managed_flag | MS Project Managed Flag (P6 Professional only) |
name_sep_char | Code Separator |
orig_proj_id | Original Project |
plan_end_date | Must Finish By |
plan_start_date | Planned Start |
priority_num | Project Leveling Priority |
proj_id | Unique ID |
proj_short_name | Project ID |
proj_url | Project Web Site URL |
project_flag | Project Flag |
px_enable_publication_flag | Enable Publication ( only) |
px_last_update_date | Last time Publish Project was run on this project (P6 Professional only) |
px_priority | Publication Priority (P6 EPPM only) |
rem_target_link_flag | Link Budget and At Completion |
reset_planned_flag | Reset Original to Remaining |
risk_level | Risk Level (P6 Professional only) |
rsrc_multi_assign_flag | Can assign resource multiple times to activity |
rsrc_self_add_flag | Can resources assign selves to activities |
scd_end_date | Schedule Finish |
source_proj_id | Source Project |
step_complete_flag | Physical Percent Complete uses Steps Completed |
strgy_priority_num | Strategic Priority |
sum_assign_level | sum_assign_level |
sum_base_proj_id | Project Baseline |
sum_data_date | Summarized Data Date (P6 Professional only) |
sum_only_flag | Contains Summarized Data Only (P6 Professional only) |
task_code_base | Activity ID Suffix |
task_code_prefix | Activity ID Prefix |
task_code_prefix_flag | Activity ID based on selected activity |
task_code_step | Activity ID Increment |
ts_rsrc_vs_inact_actv_flag | Resource can view activities from an inactive project (P6 Professional only) |
use_project_baseline_flag | use_project_baseline_flag |
wbs_max_sum_level | WBS Max Summarization Level |
web_local_root_path | Web Site Root Directory |