Project

Description: A project is a temporary endeavor undertaken to create a unique product, service, or result. Projects usually contain a work breakdown structure (WBS) and activities.

Field

Type

Description

Read-Only

ActivityDefaultActivityType

Enum

Indicates the activityType of the activity.

No

ActivityDefaultCalendarName

String

The name of the Activity Default Calendar of this project.

Yes

ActivityDefaultCalendarObjectId

ForeignKey

The unique ID of the Activity Default Calendar of this project.

No

ActivityDefaultCostAccountObjectId

Int

The unique ID of the Activity Default Cost Acount of this project.

No

ActivityDefaultDurationType

Enum

Indicates the activity default duration type of the activity..

No

ActivityDefaultPercentCompleteType

Enum

Indicates the activity default percent complete type of the activity..

No

ActivityDefaultPricePerUnit

Double

The activity default price per unit for a activity.

No

ActivityIdBasedOnSelectedActivity

Boolean

The boolean activity id based on selected activity indicator of the activity.

No

ActivityIdIncrement

Int

The increment value of the activity Id.

No

ActivityIdPrefix

String

The prefix value of the activity Id.

No

ActivityIdSuffix

Int

The suffix value of the activity Id.

No

ActivityPercentCompleteBasedOnActivitySteps

Boolean

The boolean activity percent complete based on activity steps value of the prject.

No

AddActualToRemaining

Boolean

The boolean add actual to remaining value of the activity.

No

AddedBy

String

The addedBy value of the project.

No

AllowNegativeActualUnitsFlag

Boolean

The boolean allow negative actual units flag value of the activity.

No

AnnualDiscountRate

Double

The annual discount rate value of the project.

No

AnticipatedFinishDate

DateTime

The anticipated finish date of the project.

No

AnticipatedStartDate

DateTime

The anticipated start date of the project.

No

AssignmentDefaultDrivingFlag

Boolean

The boolean assignment default driving flag value of the assignment.

No

AssignmentDefaultRateType

Enum

Indicates the default rate type of the assignment.

No

BaselineTypeName

String

The baseline type name of the baseline project.

No

BaselineTypeObjectId

ForeignKey

The unique ID of the BaselineType object. It is only available when the project is a baseline project.

No

CalculateFloatBasedOnFinishDate

String

The flag that indicates how each activity's float will be calculated with respect to other projects in the scheduling batch. This setting only has an effect when scheduling multiple projects at the same time

Yes

CheckOutDate

DateTime

The check out date of the project.

Yes

CheckOutStatus

Boolean

The boolean check out status flag value of the project.

No

CheckOutUserObjectId

Int

The check out user objectId value.

Yes

ComputeTotalFloatType

Enum

The method for calculating total float for all activities.

Yes

ContainsSummaryData

Boolean

The boolean contains summary data flag of the project.

Yes

ContractManagementGroupName

String

The contract management group name value of the project.

No

ContractManagementProjectName

String

The contract management project name value of the project.

No

CostQuantityRecalculateFlag

Boolean

The boolean cost quantity recalculate flag of the project.

No

CreateDate

DateTime

The created date of the project.

Yes

CreateUser

String

The user who created the project.

Yes

CriticalActivityFloatLimit

Double

The critical activity float limit.

No

CriticalActivityFloatThreshold

String

The maximum float time for activities before they are marked critical.

Yes

CriticalActivityPathType

Enum

Indicates Activity critical path type.

No

CriticalFloatThreshold

Double

The option used for setting the critical float threshold value when scheduling projects.

Yes

CurrentBaselineProjectObjectId

Int

The current baseline project objectId of the project.

No

CurrentBudget

Double

The current budget of the project.

Yes

CurrentVariance

Double

The current variance of the project.

Yes

DataDate

DateTime

The data date of the project.

No

DateAdded

DateTime

The date added of the project.

No

DefaultPriceTimeUnits

Enum

Indicates default price time units of the activity

No

Description

String

The description of the project.

No

DiscountApplicationPeriod

Enum

Indicates discount application period of the project

No

DistributedCurrentBudget

Double

The distributed current budget of the project.

Yes

EarnedValueComputeType

Enum

Indicates earned value compute type of the project

No

EarnedValueETCComputeType

Enum

Indicates earned value ETC compute type of the project

No

EarnedValueETCUserValue

Double

The earned value ETC user value for project computing earned value.

No

EarnedValueUserPercent

Double

The earned value user percent for project to compute earned value.

No

EnablePublication

Boolean

The boolean enable publication flag of the project.

No

EnableSummarization

Boolean

The boolean enable summarization flag of the project.

No

FinishDate

DateTime

The date finish date of the project.

Yes

FiscalYearStartMonth

Int

The fiscal year start month of the project.

No

ForecastFinishDate

DateTime

The date forecast finish date of the project.

Yes

ForecastStartDate

DateTime

The date forecast start date of the project.

Yes

GUID

String

The GUID of the project.

No

HasFutureBucketData

Boolean

The boolean has future bucket data flag of the project.

Yes

Id

String

The short id assigned to each project for identification.

No

IgnoreOtherProjectRelationships

Boolean

The option used by the scheduler for treating activity relationships between projects when scheduling.

Yes

IndependentETCLaborUnits

Double

The independent ETC labor units of the project.

No

IndependentETCTotalCost

Double

The independent ETC total cost of the project.

No

IntegratedType

Enum

The type of system integration, if any, in place at the organization.

No

IsTemplate

Boolean

The boolean is template flag of the project.

Yes

LastApplyActualsDate

DateTime

The last apply actuals date of the project.

Yes

LastFinancialPeriodObjectId

Int

The last financial period objectId of the project.

No

LastLevelDate

DateTime

The last leveling date of the project.

Yes

LastPublishedOn

DateTime

The date last published on of the project.

Yes

LastScheduleDate

DateTime

The last schedule date of the project.

Yes

LastSummarizedDate

DateTime

The last summarized date of the project.

Yes

LastUpdateDate

DateTime

The last update date of the project.

Yes

LastUpdateUser

String

The last update user of the project.

Yes

Latitude

Double

The latitude of the location.

Yes

LevelingPriority

Int

The leveling priority of the project.

No

LimitMultipleFloatPaths

Int

The number of critical float paths to calculate.

Yes

LinkActualToActualThisPeriod

Boolean

The boolean link actual to actual this period of the project.

No

LinkPercentCompleteWithActual

Boolean

The boolean link percent complete with actual of the project.

No

LinkPlannedAndAtCompletionFlag

Boolean

The boolean link planned and atCompletion flag of the project.

No

LocationName

String

The name of the location assigned to the project.

Yes

LocationObjectId

Int

The unique ID of the location assigned to the project.

No

Longitude

Double

The longitude of the location.

Yes

MakeOpenEndedActivitiesCritical

String

The option used by the scheduler for automatically leveling resources when scheduling projects.

Yes

MaximumMultipleFloatPaths

String

The number of critical float paths to calculate

Yes

MultipleFloatPathsEnabled

String

The Boolean value that indicates whether multiple critical float paths (sequences of activities) should be calculated in the project schedule.

Yes

MultipleFloatPathsEndingActivityObjectId

String

The activity in the WBS that you want to represent the end of the float paths.

Yes

MultipleFloatPathsUseTotalFloat

String

The Boolean value that decides whether or not to use total float in multiple float path calculations.

Yes

MustFinishByDate

DateTime

The date by which all project activities must finish.

No

Name

String

The name of the project.

No

NetPresentValue

Double

The net present value of the project.

Yes

ObjectId

Int

The unique ID generated by the system.

No

OBSName

String

The obs name of the project.

Yes

OBSObjectId

Int

The obs object id of the project.

No

OriginalBudget

Double

The original budget of the project.

No

OriginalProjectObjectId

ForeignKey

The unique ID of the original project. It is a baseline project if this field is not null.

Yes

OutOfSequenceScheduleType

String

The type of logic used to schedule the progressed activities: 'Retained Logic', 'Progress Override', or 'Actual Dates'.

Yes

OverallProjectScore

Int

The overall project score of the project.

Yes

OwnerResourceId

String

The short code that uniquely identifies the owner resource.

No

OwnerResourceObjectId

ForeignKey

The owner resource objectId of the project.

No

ParentEPSId

String

The parent eps id of the project.

No

ParentEPSObjectId

ForeignKey

The unique ID of the parent EPS of this project.

No

PaybackPeriod

Int

The pay back period of the project.

Yes

PlannedStartDate

DateTime

The planned start date of the project.

No

PostResponsePessimisticFinish

DateTime

The calculated project post-response finish date that corresponds to the defined pessimistic percentile.

No

PostResponsePessimisticStart

DateTime

The calculated project post-response start date that corresponds to the defined pessimistic percentile.

No

PreResponsePessimisticFinish

DateTime

The calculated project pre-response finish date that corresponds to the defined pessimistic percentile.

No

PreResponsePessimisticStart

DateTime

The calculated project pre-response start date that corresponds to the defined pessimistic percentile.

No

PrimaryResourcesCanMarkActivitiesAsCompleted

Boolean

The boolean primary resources can mark activities as completed flag of the project.

No

ProjectForecastStartDate

DateTime

The forecast start date of the project.

No

ProjectScheduleType

Enum

Schedule type of the project - Valid values are 'Duration' or 'Resource' or 'Cost'.

No

PropertyType

Enum

The project property name associated with the scheduling of projects.

Yes

ProposedBudget

Double

The proposed budget of the project.

Yes

PublicationPriority

Int

The publication priority of the project.

No

RelationshipLagCalendar

Enum

The calendar used to calculate the lag between predecessors and successors for all activities.

Yes

ResetPlannedToRemainingFlag

Boolean

The boolean reset planned to remaining flag of the project.

No

ResourceCanBeAssignedToSameActivityMoreThanOnce

Boolean

The boolean resource can be assigned to same activity more than once flag of the project.

No

ResourcesCanAssignThemselvesToActivities

Boolean

The boolean resource can assign themselves to activities of the project.

No

ResourcesCanEditAssignmentPercentComplete

Boolean

The boolean resource can edit assignment percent complete of the project.

No

ResourcesCanMarkAssignmentAsCompleted

Boolean

The boolean resource can mark assignment as completed of the project.

No

ResourcesCanViewInactiveActivities

Boolean

The boolean resource can view inactive activities of the project.

No

ReturnOnInvestment

Double

The return on investment of the project.

Yes

RiskExposure

Double

The proposed budget of the project.

Yes

RiskLevel

Enum

Indicates risk level of the project

No

RiskMatrixName

String

The name of the associated risk matrix.

Yes

RiskMatrixObjectId

ForeignKey

The risk matrix objectId of the project.

No

RiskScore

Int

The risk score of the project.

Yes

ScheduledFinishDate

DateTime

The scheduled finish date of the project.

No

SourceProjectObjectId

ForeignKey

The source project objectId of the project.

Yes

StartDate

DateTime

The start date of the project.

Yes

StartToStartLagCalculationType

Boolean

The method used to calculate lag when a start-to-start relationship exists and the predecessor starts out of sequence.

Yes

Status

Enum

The status of the project.

No

StrategicPriority

Int

The strategic priority of the project.

No

SummarizedDataDate

DateTime

The summarized data date of the project.

No

SummarizeToWBSLevel

Int

The summarize to wbs level of the project.

No

SummaryAccountingVarianceByCost

Double

The summary accounting variance by cost of the project.

Yes

SummaryAccountingVarianceByLaborUnits

Double

The summary accounting variance by labor units of the project.

Yes

SummaryActivityCount

Int

The summary activity count of the project.

Yes

SummaryActualDuration

Double

The summary actual duration of the project.

Yes

SummaryActualExpenseCost

Double

The summary actual expense costof the project.

Yes

SummaryActualFinishDate

DateTime

The summary actual finish date of the project.

Yes

SummaryActualLaborCost

Double

The summary actual labor cost of the project.

Yes

SummaryActualLaborUnits

Double

The summary actual labor units of the project.

Yes

SummaryActualMaterialCost

Double

The summary actual material cost of the project.

Yes

SummaryActualNonLaborCost

Double

The summary actual nonlabor cost of the project.

Yes

SummaryActualNonLaborUnits

Double

The summary actual nonlabor units of the project.

Yes

SummaryActualStartDate

DateTime

The summary actual start date of the project.

Yes

SummaryActualThisPeriodCost

Double

The summary actual this period cost of the project.

Yes

SummaryActualThisPeriodLaborCost

Double

The summary actual this period labor cost of the project.

Yes

SummaryActualThisPeriodLaborUnits

Double

The summary actual this period labor unit of the project.

Yes

SummaryActualThisPeriodMaterialCost

Double

The summary actual this period material cost of the project.

Yes

SummaryActualThisPeriodNonLaborCost

Double

The summary actual this period nonlabor cost of the project.

Yes

SummaryActualThisPeriodNonLaborUnits

Double

The summary actual this period nonlabor unit of the project.

Yes

SummaryActualTotalCost

Double

The summary actual total cost of the project.

Yes

SummaryActualValueByCost

Double

The summary actual value by cost of the project.

Yes

SummaryActualValueByLaborUnits

Double

The summary actual value by labor units of the project.

Yes

SummaryAtCompletionDuration

Double

The summary at completion duration of the project.

Yes

SummaryAtCompletionExpenseCost

Double

The summary at completion expense cost of the project.

Yes

SummaryAtCompletionLaborCost

Double

The summary at completion labor cost of the project.

Yes

SummaryAtCompletionLaborUnits

Double

The summary at completion labor units of the project.

Yes

SummaryAtCompletionMaterialCost

Double

The summary at completion material cost of the project.

Yes

SummaryAtCompletionNonLaborCost

Double

The summary at completion nonlabor cost of the project.

Yes

SummaryAtCompletionNonLaborUnits

Double

The summary at completion nonlabor units of the project.

Yes

SummaryAtCompletionTotalCost

Double

The summary at completion total cost of the project.

Yes

SummaryAtCompletionTotalCostVariance

Double

The summary at completion total cost variance of the project.

Yes

SummaryBaselineCompletedActivityCount

Int

The summary baseline completed activity count of the project.

Yes

SummaryBaselineDuration

Double

The summary baseline duration of the project.

Yes

SummaryBaselineExpenseCost

Double

The summary baseline expense cost of the project.

Yes

SummaryBaselineFinishDate

DateTime

The summary baseline finish date of the project.

Yes

SummaryBaselineInProgressActivityCount

Int

The summary baseline in progress activity count of the project.

Yes

SummaryBaselineLaborCost

Double

The summary baseline labor cost of the project.

Yes

SummaryBaselineLaborUnits

Double

The summary baseline labor units of the project.

Yes

SummaryBaselineMaterialCost

Double

The summary baseline material cost of the project.

Yes

SummaryBaselineNonLaborCost

Double

The summary baseline nonlabor cost of the project.

Yes

SummaryBaselineNonLaborUnits

Double

The summary baseline nonlabor Units of the project.

Yes

SummaryBaselineNotStartedActivityCount

Int

The summary baseline not start activity count of the project.

Yes

SummaryBaselineStartDate

DateTime

The summary baseline start date of the project.

Yes

SummaryBaselineTotalCost

Double

The summary baseline total cost of the project.

Yes

SummaryBudgetAtCompletionByCost

Double

The summary budget at comletion by cost of the project.

Yes

SummaryBudgetAtCompletionByLaborUnits

Double

The summary budget at completion by labor units of the project.

Yes

SummaryCompletedActivityCount

Int

The summary completed activity count of the project.

Yes

SummaryCostPercentComplete

Double

The summary cost percent complete of the project.

Yes

SummaryCostPercentOfPlanned

Double

The summary cost percent of planned of the project.

Yes

SummaryCostPerformanceIndexByCost

Double

The summary cost performance index by cost of the project.

Yes

SummaryCostPerformanceIndexByLaborUnits

Double

The summary cost performance index by labor units of the project.

Yes

SummaryCostVarianceByCost

Double

The summary cost variance by cost of the project.

Yes

SummaryCostVarianceByLaborUnits

Double

The summary cost variance by labor units of the project.

Yes

SummaryCostVarianceIndex

Double

The summary cost variance index of the project.

Yes

SummaryCostVarianceIndexByCost

Double

The summary cost variance index by cost of the project.

Yes

SummaryCostVarianceIndexByLaborUnits

Double

The summary cost variance index by labor unit of the project.

Yes

SummaryDurationPercentComplete

Double

The summary duration percent complete of the project.

Yes

SummaryDurationPercentOfPlanned

Double

The summary duration percent of planned of the project.

Yes

SummaryDurationVariance

Double

The summary duration variance of the project.

Yes

SummaryEarnedValueByCost

Double

The summary earned value by cost of the project.

Yes

SummaryEarnedValueByLaborUnits

Double

The summary earned value by labor units of the project.

Yes

SummaryEstimateAtCompletionByCost

Double

The summary estimate at completion by cost of the project.

Yes

SummaryEstimateAtCompletionByLaborUnits

Double

The summary estimate at completion by labor units of the project.

Yes

SummaryEstimateAtCompletionHighPercentByLaborUnits

Double

The summary estimate at completion high percent by labor units of the project.

Yes

SummaryEstimateAtCompletionLowPercentByLaborUnits

Double

The summary estimate at completion low percent by labor units of the project.

Yes

SummaryEstimateToCompleteByCost

Double

The summary estimate to completion by cost of the project.

Yes

SummaryEstimateToCompleteByLaborUnits

Double

The summary estimate to completion by labor units of the project.

Yes

SummaryExpenseCostPercentComplete

Double

The summary expense cost percent complete of the project.

Yes

SummaryExpenseCostVariance

Double

The summary expense cost variance of the project.

Yes

SummaryFinishDateVariance

Double

The summary finish date variance of the project.

Yes

SummaryInProgressActivityCount

Double

The summary in progress activity count of the project.

Yes

SummaryLaborCostPercentComplete

Double

The summary labor cost percent complete of the project.

Yes

SummaryLaborCostVariance

Double

The summary labor cost variance of the project.

Yes

SummaryLaborUnitsPercentComplete

Double

The summary labor units percent complete of the project.

Yes

SummaryLaborUnitsVariance

Double

The summary labor units variance of the project.

Yes

SummaryLevel

Enum

Indicates summary level of the project

No

SummaryMaterialCostPercentComplete

Double

The summary material cost percent complete of the project.

Yes

SummaryMaterialCostVariance

Double

The summary material cost variance of the project.

Yes

SummaryNonLaborCostPercentComplete

Double

The summary nonlabor cost percent complete of the project.

Yes

SummaryNonLaborCostVariance

Double

The summary nonlabor cost variance of the project.

Yes

SummaryNonLaborUnitsPercentComplete

Double

The summary nonlabor units percent complete of the project.

Yes

SummaryNonLaborUnitsVariance

Double

The summary nonlabor units variance of the project.

Yes

SummaryNotStartedActivityCount

Double

The summary non started activity count of the project.

Yes

SummaryPerformancePercentCompleteByCost

Double

The summary performance percent complete by cost of the project.

Yes

SummaryPerformancePercentCompleteByLaborUnits

Double

The summary performance percent complete by labor units of the project.

Yes

SummaryPlannedCost

Double

The summary planned cost of the project.

Yes

SummaryPlannedDuration

Double

The summary planned duration of the project.

Yes

SummaryPlannedExpenseCost

Double

The summary planned expense cost of the project.

Yes

SummaryPlannedFinishDate

DateTime

The summary planned finish date of the project.

Yes

SummaryPlannedLaborCost

Double

The summary planned labor cost of the project.

Yes

SummaryPlannedLaborUnits

Double

The summary planned labor units of the project.

Yes

SummaryPlannedMaterialCost

Double

The summary planned material cost of the project.

Yes

SummaryPlannedNonLaborCost

Double

The summary planned non labor cost of the project.

Yes

SummaryPlannedNonLaborUnits

Double

The summary planned non labor units of the project.

Yes

SummaryPlannedStartDate

DateTime

The summary planned start date of the project.

Yes

SummaryPlannedValueByCost

Double

The summary planned value by cost of the project.

Yes

SummaryPlannedValueByLaborUnits

Double

The summary planned value by labor units of the project.

Yes

SummaryProgressFinishDate

DateTime

The summary progress finish date of the project.

Yes

SummaryRemainingDuration

Double

The summary remaining duration of the project.

Yes

SummaryRemainingExpenseCost

Double

The summary remaining expense cost of the project.

Yes

SummaryRemainingFinishDate

DateTime

The summary remaining finish date of the project.

Yes

SummaryRemainingLaborCost

Double

The summary remaining labor cost of the project.

Yes

SummaryRemainingLaborUnits

Double

The summary remaining labor units of the project.

Yes

SummaryRemainingMaterialCost

Double

The summary remaining material cost of the project.

Yes

SummaryRemainingNonLaborCost

Double

The summary remaining non labor cost of the project.

Yes

SummaryRemainingNonLaborUnits

Double

The summary remaining non labor units of the project.

Yes

SummaryRemainingStartDate

DateTime

The summary remaining start date of the project.

Yes

SummaryRemainingTotalCost

Double

The summary remaining total cost of the project.

Yes

SummarySchedulePercentComplete

Double

The summary schedule percent complete of the project.

Yes

SummarySchedulePercentCompleteByLaborUnits

Double

The summary schedule percent complete by labor units of the project.

Yes

SummarySchedulePerformanceIndexByCost

Double

The summary schedule performance index by cost of the project.

Yes

SummarySchedulePerformanceIndexByLaborUnits

Double

The summary schedule performance index by labor units of the project.

Yes

SummaryScheduleVarianceByCost

Double

The summary schedule variance by cost of the project.

Yes

SummaryScheduleVarianceByLaborUnits

Double

The summary schedule variance by labor units of the project.

Yes

SummaryScheduleVarianceIndex

Double

The summary schedule variance index of the project.

Yes

SummaryScheduleVarianceIndexByCost

Double

The summary schedule variance index by cost of the project.

Yes

SummaryScheduleVarianceIndexByLaborUnits

Double

The summary schedule variance index by labor units of the project.

Yes

SummaryStartDateVariance

Double

The summary start date variance of the project.

Yes

SummaryToCompletePerformanceIndexByCost

Double

The summary to complete performance index by costof the project.

Yes

SummaryTotalCostVariance

Double

The summary total cost variance of the project.

Yes

SummaryTotalFloat

Double

The summary total float of the project.

Yes

SummaryUnitsPercentComplete

Double

The summary units percent complete of the project.

Yes

SummaryVarianceAtCompletionByLaborUnits

Double

The summary variance at completion by labor units of the project.

Yes

TotalBenefitPlan

Double

The total benefit plan of the project.

Yes

TotalBenefitPlanTally

Double

The total benefitplantally of the project.

Yes

TotalFunding

Double

The total funding of the project.

Yes

TotalSpendingPlan

Double

The total spending plan of the project.

Yes

TotalSpendingPlanTally

Double

The total spending plantally of the project.

Yes

UnallocatedBudget

Double

The unallocated budget of the project.

Yes

UndistributedCurrentVariance

Double

The undistributed current variance of the project.

Yes

UseExpectedFinishDates

String

The option used for setting activity finish dates as the expected finish dates when scheduling projects.

Yes

UseProjectBaselineForEarnedValue

Boolean

The boolean use project baseline for earned value of the project.

No

WBSCodeSeparator

String

The string wbs code separator of the project.

No

WBSMilestonePercentComplete

Double

The wbs milestone percent complete of the project.

Yes

WBSObjectId

Int

The unique ID of the associated wbs.

Yes

WebSiteRootDirectory

String

The string web site root directory of the project.

No

WebSiteURL

String

The string web site URL of the project.

No