E Scale a Signaling Node
Perform this procedure only if an additional signaling node(s) needs to be deployed
to an existing DSR deployment.
Note:
This procedure is only required if additional Signaling Node(s) needs to be deployed to an existing DSR deployment.Prerequisites:
DSR topology is already deployed and configured as per Software Installation Using HEAT Templates (OpenStack).
- Create new signaling stack.
- Prepare OpenStack templates and environment files for signaling stacksby following instructions in <Procedure 13> for signaling stacks.
- Create OpenStack parameter file for signaling stacks by following
instructions in <Procedure 15>.
Note:
Change the number of signaling node(s) as per the requirement. - Deploy the stacks by following instructions in <Procedure
16>.
Note:
New stack is created as part of this procedure.
- Configure new site in the existing topology.
- Create a new network element by following <Procedure 25> to define the network for new site being configured.
- Configure the SOAM servers by following Procedure 26 to create the SOAM servers.
- Configure the SOAM server group by following Procedure 27 to create SOAM server group.
- Configure the MP virtual machines by following Procedure 28.
- Configure the MP server group(s) and profiles by following Procedure 31.
- Configure the signaling network routes by following Procedure 32.
- If deployed stack contains IPFE servers, then configure the IPFE by following Procedure 34.
Note:
Repeat this procedure if more signaling nodes are required.