3.2 Feature Deactivation Execution Overview
The procedures shown in the following table are executed inside a maintenance window. Deactivation procedure times are only estimates as the reason to execute a deactivation has a direct impact on any additional deactivation preparation that must be done. Times may vary due to differences in database size, network configuration and loading, user experience, and user preparation.
Table 3-2 Feature Deactivation Overview
Procedure | Elapsed Time (Hours:Minutes) | Activity Deactivation Procedures | Impact | |
---|---|---|---|---|
This Step | Cum. | |||
Deactivation Setup | 0:30 | 0:30 |
|
None |
Pre-Feature Deactivation Health Check | 0:20 | 0:50 |
|
RBAR is deactivated |