The console displays a single row for each Project Management system server associated with the PM Bridge.
You can sort the rows by clicking the column heading of any column.
The following fields appear for each row in the list of servers:
- Connection Status Column – The icons in this column represent the status of the connection between the PM Bridge and the Project Management system server. Information about the selected server is shown in the status area. The following table lists the status icons and their meaning.
Icon | Meaning |
---|---|
Status - OK | |
Status – Warning | |
Status – Error | |
Loading, Please wait… |
Note: The status icon is not refreshed automatically as system events occur. The status is updated after each refresh or load of the window. To refresh the window, press F5.
- Server Name – Displays the name of the Project Management system server. To change a server name in MS Project Server, refer to Entering General Bridge Server Settings Information in The Project Management Bridge Wizard for MS Project.
- Sync Type – Displays the type of synchronization: Manual or Periodic. To change the sync type in MS Project Server, refer to Entering General Defaults Information in The Project Management Bridge Wizard for MS Project.
- Sync Status – Displays the synchronization between the PM Bridge and the Project Management system server. Possible values are:
- Completed (Success) – The latest synchronization process completed without any errors.
- Completed (Errors) – The latest synchronization process completed, but there were some errors. Check the server log to see the errors.
- Failed – The latest synchronization process failed to complete. Check the server log to see the errors.
- Running – A synchronization process is currently running. You cannot start a new synchronization process until this one is completed.
- Never Synced – No synchronization process has been run for this server.
- Last Sync – Displays the date and time the last synchronization process finished. If the sync failed, the date and time of the failure are shown.
- Next Sync – Displays the date and time the next sync is scheduled to start. If the sync type is manual, n/a appears in this field. To change the sync type in MS Project Server, refer to Entering General Defaults Information in The Project Management Bridge Wizard for MS Project.