Appendix: PeopleSoft Engineering Standard Reports

PeopleSoft applications offer a wide range of query and reporting possibilities. In addition to the standard reports that we deliver, we also provide reporting tools that you can use to create new reports.

This topic provides an overview of PeopleSoft Engineering reports and enables you to:

  • View summary tables of all reports.

  • View report details.

  • View standard financial reports.

Note: For samples of these and other reports in your application, see the PDF files published with your online documentation.

See also the product documentation for PeopleTools: PeopleSoft Process Scheduler.

This table lists the PeopleSoft Engineering reports, sorted alphanumerically by report ID. The reports listed are all Structured Query Reports (SQRs). If you need more information about a report, refer to the report details at the end of this topic.

Report ID and Report Name

Description

Navigation

Run Control Page

EGS1000

ECO Report

Lists ECO information for an item or range of items for a specific business unit for a specific date or range of dates. Includes department, classification, ECO status, priority, and the name of the requestor. Can be sorted by classification and ECO number; ECO number; item, schedule date, and priority; priority, schedule date, and ECO number; schedule date, priority, and ECO number; or status, schedule date, and ECO number.

Engineering, Engineering Changes, ECO Report, ECO Report

EG_ECO_REPORT

ENS1000

BOM Report

Lists the components on either manufacturing or engineering BOMs.

Engineering, BOMs and Revisions, Reports, Bills of Material, EBOM Report

EN_BOM_REPORT

ENS1001

Routing Report

Lists the routing information for both PeopleSoft Manufacturing and PeopleSoft Engineering routings.

Engineering, Routings, Engineering Routing Report, Routing Report

RUN_ENS1001

ENS1002

Compare Routings Report

Lists the differences between two manufacturing routings, two engineering routings, or one manufacturing routing and one engineering routing. Comparisons can also be based on the same item with different routing codes.

Engineering, Routings, Eng Routing Comparison Report, Routing Compare Report

RUN_ENS1002

ENS1003

Master Routing Where Used Report

Lists all items that reference another item as its master routing along with production data. This report is used in both PeopleSoft Manufacturing and PeopleSoft Engineering.

Engineering, Routings, Eng Master Rtg Where Used Rpt, Master Rtg Where Used Report

RUN_ENS1003

ENS1005

Compare BOMs Report

Lists the differences between a manufacturing and an engineering BOM, or two engineering BOMs.

  • Engineering, BOMs and Revisions, Reports, EBOM Comparison, EBOM Compare Report

  • Engineering, BOMs and Revisions, Reports, EBOM Comparison, EBOM Compare Report, Print Options

EN_BOM_COMP_REPORT

ENS1010

BOM Cost Report

Lists the component costs on either manufacturing or engineering BOMs.

Engineering, BOMs and Revisions, Reports, Create EBOM Cost Report

EN_BOM_COST_REPORT

ENS2000

Item Where Used Report

Lists all the BOMs on which an item appears either as a component or a substitute for a component. You'll find this information useful when you want to analyze the impact that component changes can have on all existing BOMs.

Engineering, BOMs and Revisions, Reports, Item Where Used

EN_WHEREUSED_RPT

See also PeopleTools: PeopleSoft Process Scheduler documentation.