Viewing and Correcting BOM Messages Using Staged BOMs
As part of the mass maintenance process, you can correct BOM messages with data errors using the Staged BOMs pages. You can view each BOM message and correct the errors using these pages. You can then change the status to Reprocess and submit the BOM for reprocessing immediately, or use the MMC Staged BOM process to reprocess a range of BOMs.
This topic discusses how to view and correct BOM messages using staged BOMs.
Page Name |
Definition Name |
Usage |
---|---|---|
EN_TRN_BOM_STAT |
View, and possibly update, the results from a BOM Mass Maintenance process. You must have run the BOM Mass Maintenance process with the staged BOM data option of Stage Result. |
|
EN_TRN_BOM_HDR |
View and update the results from a BOM Mass Maintenance process. |
|
Update Staged EBOM Details - Header: Assembly Text |
EN_TRN_BOM_TEXT |
View and update the results from a BOM Mass Maintenance process. |
EN_TRN_BOM_OUT |
View and update the results from a BOM Mass Maintenance process. |
|
Update Staged EBOM Details - Components: Component Details |
EN_TRN_BOM_CMP |
View and update the results from a BOM Mass Maintenance process. |
Update Staged EBOM Details - Components: Reference Designators |
EN_TRN_BOM_CMPDESG |
View and update the results from a BOM Mass Maintenance process. |
Update Staged EBOM Details - Components: Dimensions |
EN_TRN_BOM_CMPDIM |
View and update the results from a BOM Mass Maintenance process. |
Update Staged EBOM Details - Components: Substitutes |
EN_TRN_BOM_SUB |
View and update the results from a BOM Mass Maintenance process. |
Use the Update Staged EBOM Details - BOM Status page (EN_TRN_BOM_STAT) to view, and possibly update, the results from a BOM Mass Maintenance process.
Navigation:
BOMs tab
Field or Control |
Description |
---|---|
BOM State |
Displays Manufacturing or Engineering. The BOM state must be valid, or the system considers the message an error. |
BOM Code |
Assign a primary and up to 98 alternate BOMs. There must be a BOM code, or the system considers the message an error. |
Status |
Indicates the eligibility of this BOM for further processing. You can receive BOM error messages with any of these statuses:
|
BOM Type |
Indicates whether you have received a Production or Rework BOM. Production BOMs are used as the basis for manufacturing assemblies. Rework BOMs are used when you have a standard rework process where you include additional components to repair BOMs. The BOM type must be valid, or the system considers the message an error. |
If you are correcting multiple messages, you can manually change the status of each message to Reprocess after you've corrected the data. Then run the BOM Loader process to reprocess the data for multiple messages. The system changes Reprocess and New messages to the Complete status after confirming that there are no errors in the message.
To correct a single message, select the Reprocess check box to set the message status to Reprocess, and click OK or Apply to initiate the validation background process.
Messages
In the Messages scroll area, the system displays the error message, the result of the message, and the BOM details for the message.
This page lists of all the errors and warnings for the BOM, whether for the overall BOM, a specific component, or output. The Result column indicates the severity of the message. W indicates a warning and doesn't stop the BOM from being valid. E indicates an error and must be fixed for the BOM to be valid.
Use the Update Staged EBOM Details - Summary page (EN_TRN_BOM_HDR) to view and update the results from a BOM Mass Maintenance process.
Navigation:
Field or Control |
Description |
---|---|
Component ID, Comp Rev (component revision), Op Seq (operation sequence), Eff Date (effective date), Obs Date (obsolete date), Quantity , and Per |
You can change values for these fields. |
Use the Update Staged EBOM Details - Header: Outputs page (EN_TRN_BOM_OUT) to view and update the results from a BOM Mass Maintenance process.
Navigation:
For each output, you can change the output type, output item, source code, resource allocation percentage, and cost allocation percentage.