Resolving Overrides in Batch Processing
This topic discusses overrides in batch processing.
The following table describes how overrides to supporting elements are resolved during batch processing.
Program |
Process |
---|---|
Payee Data Manager Page |
Resolves hierarchy between pay entity, pay group, payee, and calendar supporting element overrides and loads the override with the highest priority into a supporting element override/value array. |
PIN Manager Page |
Checks to see if the supporting element is resolved.
|
Element Assignment Page |
An array, formula, bracket, or date extract can assign a value to another element. In this case, the element is considered resolved. |
Entitlement/Take program Page |
Applies primary element overrides, then payee/element overrides, as applicable, to a supporting element used by take or entitlement elements. For each type of override, the program saves and stores the current value of the supporting element before assigning the override value. Say a primary element override and a payee/element override exist for Variable A. The system stores the current value of Variable A (5), retrieves the primary override value (6), stores the current value of Variable 1 (6), retrieves the payee/element override value (3), and so on. When the override is no longer in force, the saved value of the supporting element is restored—in our example, 5. |