3.1 Pre-Configuration Activities
Before FABR configuration can be performed, the following activities need to be performed in the system:
- Verify server status
- Gather information required for Diameter, Diameter Common, and FABR configuration
- Configure Diameter Common components required for FABR configuration
- Configure Diameter components required for FABR configuration
- Configure SDS DP / UDR NOAM Remote servers in Communication Agent (ComAgent)