Create or Edit Gauge Charts for Visualizations in Projects/Shells

To create or edit Gauge charts for visualizations in a project/shell (Admin mode):

  1. Sign in to Unifier with project/shell administration credentials.
  2. Go to the specific project/shell tab, and switch to Admin mode. For example, select a tab called Vision Corporation.
  3. In the left Navigator, select Setup, and then select Visualizations.
  4. In the Visualizations log (right pane), select any of the following actions:
    • Select Create to add a new visualization in the project/shell. Proceed to step 6.
    • Select a visualization in the log, and then select Edit. Proceed to step 5.
  5. On the Edit page, select Edit ( ) for a Gauge chart in the visualization layout. Proceed to step 6b.
  6. On the Create or Edit page, specify or update the following information:
    1. To preview the data before creating the chart:
      1. From the Data Source list, select the data source to use for creating the content item. The list shows published content in the alphabetical order.
      2. From the Preview Project list, select an active project/shell and then click Preview Data.
    2. From the View Type list, select Gauge Chart.
    3. In the Name field, enter a name for the Gauge chart.
    4. (Optional) In the Description field, enter a short description about the Gauge chart.
    5. From the Value list, select a data element from the data source selected above. Displays Count by default.

      For each data element selected in the Value list, select any of the following measures:

      • Average: The mean of all values of the selected data element.
      • Count: (Default) The total number of rows of the selected data element.
      • Max: For numeric fields, displays the highest value. For date fields, displays the maximum date.
      • Median: The central value among all values of the selected data element.
      • Min: For numeric fields, displays the lowest value of the selected data element. For date fields, displays the minimum date.
      • Sum: Sum of all values of the selected data element.
    6. From the Target list, select a data element to use as a measure for targets.
    7. In the Threshold field, specify a maximum of three thresholds to measure on the Gauge chart. For each threshold specify a range of values and a color code as follows:
      1. Click Add Threshold.
      2. In the Min field, enter a minimum value for the threshold in the range 0 to 100.
      3. In the Max field, enter the maximum value for the threshold in the range 0 to 100.
      4. From the Color ( ) list, associate a color for each threshold defined.
    8. From the Currency Options list, select the currency used by the project/shell. Choices include: None, Base Currency, and Shell Currency.
    9. In the Shape field, select the shape of the Gauge chart as Circle or Semi-circle.
    10. Make changes as needed to refine the above selections.
  7. After making all changes, perform any of the following actions:
    • If you created a Gauge chart, select Create, and return to the Edit page.
    • To confirm all the changes made to the edited charts, select Update, and return to the Edit page.
  8. On the Edit page, select Save to update the visualization with any created or edited content.

Related Topics

Create or Edit Visualization Content Items in Projects/Shells

Create or Edit Area Charts, Bar Charts, and Line Charts for Visualizations in Projects/Shells

Create or Edit Bubble Charts for Visualizations in Projects/Shells

Create or Edit Combo Charts for Visualizations in Projects/Shells

Create or Edit Pie Charts and Donut Charts for Visualizations in Projects/Shells

Create or Edit Funnel Charts for Visualizations in Projects/Shells

Create or Edit KPI Cards for Visualizations in Projects/Shells

Create or Edit Pivot Grids for Visualizations in Projects/Shells

Create or Edit Pyramid Charts for Visualizations in Projects/Shells

Create or Edit Scatter Charts for Visualizations in Projects/Shells

Create or Edit Tables for Visualizations in Projects/Shells

Create or Edit Timeline Charts for Visualizations in Projects/Shells